NSQP MEETING 20-01-2011. Valery AKHNAZAROV January 20th 2011 ISP PP0 Board Bonding Procedure Type 1 Type 3 Type 4peek Type 4 Assembly Name: ISP ASM Parts.

Slides:



Advertisements
Similar presentations
The term gluing means to assemble parts with a glue or adhesive.
Advertisements

GOODSON Tools and Supplies for Engine Builders Calibrating and Maintaining Your Precision Machinists Level.
Application Instructions Bonds to Polyethylene, PVC, Steel, Fiberglass, and Aluminum.
Repair.
 Without reference, identify principles relating to Fixed Radiological X-RAY PM with at least 70 percent accuracy.
Multi-Sync Repair Training DPM Diversified Products Mfg Inc. Click the Mouse or use the Down Arrow to advance to the next point.
What is a fastener? A device to locate or hold parts
ModICE Modular Integrated Connector Enclosure
Gluing Tests - DIPTEM Genova - Adhesives Shear tests with four different adhesive types: Adhesive tape NITTO DENKO 30 µm thick Adhesive tape NITTO DENKO.
MAINTENANCE OF THE SERVICE RIFLE OVERVIEW Cleaning gear Maintenance Function check User serviceability inspection.
A Canadian Hot Tub Factory Tour. You begin with a Quality Lucite Acrylic sheet. The shape is created by loading the sheet into a forming machine, heating.
Prepared by: Barry Sparrow and Sal Ienco Civil/Construction Sault College.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
SEACORK INSTALLATION ON A CATAMARAN The first step is to make templates of all corner pieces to be cut from sheet material, which will be used for border.
Making Coverslips by Steve Smith, Cheng-Zhong Zhang and Amy Xu.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
Project Management Service
FABRICATION OF BLOCKS OWNERS REQUIREMENT DESIGN CLASSIFICATION SOCIETY
Pixel Leaf Spring Review, Dec 19, Leaf Spring Review Agenda Leaf spring conditions Mockup testing Planning for the work at P5 Discussion Demonstration.
Fast Link Recoating System: Fast Link Recoating System: 3 easy steps… Remove tape, soil, chewing gum Dust mop/vac all dirt and dust (1)(1) Use Power.
Assembly Instructions KEI Ltd © copyright Building the PicPatch08 with 4.8V battery operation only.
Tools you need: 1. Sander 2. Drill gun with bit extensions (to reach far away screws) 3. Very good carpet cutter 4. Clamps (to hold/clamp the carpets while.
Rut ‘n’ Strut Game Calls How I turn a Pot Call. Select wood that you want to use to turn Pot Calls out of, Rip it 4” wide and then Crosscut into 4” X.
SEALING the ENGINE n Chapter 5 n Classroom Manual –Page95 n Lab Manual –Page 113 CBC AUTOMOTIVE RK.
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
Co-Cure Stave Construction 11/10/2010. Co-Cure cables should have flashbreaker tape still covering the surface for this process. SO - don’t remove the.
Basic Bowl Turning. 1. Draw circle on top of board. 2. Cut to size on band saw. 3. Sand one surface of the bowl and the top o the waste block that is.
Table of Contents Unit 1- Understand the Problem Unit 2- Gather Information Unit 3- Develop Solutions Unit 4- Implement A Solution Unit 5- Test and Evaluate.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
NSQP X-1 ASSEMBLY Lessons learned Sébastien MICHAL January 30 rd 2012.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
Shop Built Magnetic LED Light Bob Clark Aug, 11, 2011.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
Problem Statement The amount of adhesive consumed in the assembly operation is higher than specified by engineering, resulting in significantly higher.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Muoviteknologia Teppo Vienamo Joints / attachments Principles of joining plastics parts Mechanical joints / attachments Adhesives Welding.
Shear test with irradiated samples NA62 - DIPTEM Genova – UCL
TAKE NOTE ON THE ORDER OF PROCEDURE FOR CONSTRUCTION OF THE LAMINATE COUNTERTOP. Countertop Procedures.
Bonding of Flex Cable to Stave 11/10/2010 Thomas Johnson.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 Laminate the NTC-HV and PS harnesses Assembly Name: PP1 Penetration Tape Parts requires:
1. Take HV harnesses with label (IHV2) and transfer on the Stacking table. 1.1 Inspect HV harnesses visually. 2.1 Insulate HV Flex with 3M™ VHB™ Tape.
Conductive glue tests. J.Wickens 12/7/04 Used small pieces of HV kapton cut from redundant (old) stock, glued to silicon test structures from Karlsruhe.
PLANER. Parts 1. Table 2. Table raising & lowering handwheel 3. Corrugated (sectional) infeed roll (top) 4. Smooth infeed roll (bottom) 5. Chipbreaker.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 Corrugated Panel Bonding Procedure Assembly Name: ISP Corrugated Panel ASM Parts.
1. 2 TS 50/100 Tape Splicer SMD Parts Counters Tape Splicers Vision Verification Tape & Reel Supplies Manual SMD Taping Machines Automated Pick & Place.
Project Document Number GTMP-5076 L-1011oem Wing Upgrades W. M. Langford Advanced Models Systems & Sensors Branch 22 June 2004 (a.k.a. L-1011_mod1) Generic.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
RE 4/3 RPC Pre-assembly manual 1. HCP case preparation
Procedure for MCM rework on tray MID 070
Deconstructing a Hubsan and Rebuilding
Global Exotics Board Replacement
ModICE Modular Integrated Connector Enclosure
Ladder Assembly All tools and jigs produced Glue dispensing works
Shear test with irradiated samples
Ladder Assembly All tools and jigs produced Glue dispensing works
Activities Status and Plan for the week
Activities Status and Plan for the week
Gluing jigs for Demonstrator
Antirust Properties of Petroleum Products by NACE Corrosion
Board Replacements for Nail-Down hardwood
Preparation of Samples
Grinding Edges Square & Parallel
BPM Microsystems, LP.
950, 950XL, 950XLT ¾”-2”.
Production process- your product processing cards, technology
Trinity Mexico Boring Bar Repair Report
Building pattern  Complete the following tables and write the rule 
Presentation transcript:

NSQP MEETING

Valery AKHNAZAROV January 20th 2011 ISP PP0 Board Bonding Procedure Type 1 Type 3 Type 4peek Type 4 Assembly Name: ISP ASM Parts requires: PP0 ISP top panel. PP0 ISP bottom panel. PP0 Panel Blocks (4 types) Type 1 ( 21F610-1) Type 3 ( 21F610-3) Type 4 ( 21F610) Type 4 Peek ( 21F611) Type 4 Type 4peek Type 1 Type 3

Valery AKHNAZAROV January 20th 2011 ISP PP0 Board Bonding Procedure Procedure 1.Prepare bonding surfaces. a.Clean PP0 ISP top panel surface with Acetone ??? b.Clean PP0 Panel Blocks surface with Acetone. c. Spray silicone on the tool. 2.Set the ISP PP0 Board on bonding tool. 3. Dispense epoxy on the PP0 Panel Blocks. 4.Load and apply pressure to the PP0 Panel Blocks. Type 4peek Type 1 Type 4peek Spray silicone

Valery AKHNAZAROV January 20th 2011 ISP PP0 Board Bonding Procedure 5. Remove the adhesive in excess. 6. Let cure for 24h to reach the adhesive handling strength 7. Inspect all the bonds. 8. Mount (screws) block Type 2 and Grind with abrasive tape (grade 220) the bonding surface PP0 carbon fiber bottom plate. 10. Clean PP0 ISP bottom panel surface with Acetone. 11. Dispense epoxy on the PP0 Panel Blocks Type 2 and Load and apply pressure the PP0 ISP bottom panel. Type 3 Type 4 Grind surface Quality Assurance 1.Inspect all bonds checking lack of adhesive. 2.Dry fit the Corrugated Panel. 3. Check the straightness of the Corrugated Panel and ISP PP0 Board a reference table. pins