Global Design Effort - CFS 06-09-11 ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.

Slides:



Advertisements
Similar presentations
Global Design Effort - CFS 13 December 2012 PAC Review - KEK 1 PAC Review CONVENTIONAL FACILITIES AND SITING A. Enomoto, V. Kuchler, J. Osborne.
Advertisements

Damping Rings Discussion Session: Implications and Impact of the Central Injector Configuration and Other Layout Issues ILCDR07 Workshop.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Damping Rings Baseline Lattice Choice ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
Global Design Effort - CFS LCWS10 CFS Parallel Sessions 1 LCWS10 Americas Region Life Safety ILC CONVENTIONAL FACILITIES AND SITING GROUP V. Kuchler.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
ARUP Studies Update ILC Interaction Region Design Requirements John Osborne CERN, Yung Loo & Matt Sykes (ARUP) CFS-ADI Joint Meeting - University of Tokyo.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
LINEAR COLLIDER COLLABORATION Designing the world’s next great particle accelerator Detector Hall Configuration Overview New baseline (Hybrid A’) proposed.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas CFS AD&I Status Report Conventional.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Damping Rings Lattice Evaluation Mark Palmer Cornell University January 19, 2011.
DR Layout Description ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
August 11, 2011 FNAL Meeting Global Design Effort 1 DR-CFS Discussion Mark Palmer GDE.
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
2011 Damping Rings Lattice Evaluation WebEx Meeting May 24, 2011 Mark Palmer Cornell University.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP IWLC10.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Experimental Hall in Mountain Regions
Review of the International Linear Collider (ILC) Electrical and Mechanical System Design to be held at CERN on 21 March, 2012 The purpose of the Review.
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
Conventional Facilities and Siting Global Group (ARCFS)
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Americas KlyCluster Cost Analysis Overview
DR Magnets & Power Supply System ILC-ADI Meeting March 14, 2012
ILC GLOBAL SYSTEMS MEETING
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Tom Lackowski Revised 10/12/2011
Presentation transcript:

Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL STATUS UPDATE V. Kuchler

Global Design Effort - CFS ILC CFS and Global Systems Meeting Overview Preparation for the Damping Ring TBR Preparation for the Damping Ring TBR First Impressions of the KEK Tunnel Configuration Study First Impressions of the KEK Tunnel Configuration Study International Large Detector (ILD) Collaboration Meeting International Large Detector (ILD) Collaboration Meeting Update on Interaction Region Consulting Activities Update on Interaction Region Consulting Activities 2

Global Design Effort - CFS ILC CFS and Global Systems Meeting Preparation for the DR TBR A One-Day Mini-Workshop for Damping Ring Criteria was Held on June 2 at FermilabA One-Day Mini-Workshop for Damping Ring Criteria was Held on June 2 at Fermilab M. Palmer Attended in Person and S. Guiducci Attended via Webex for Most of the Morning SessionM. Palmer Attended in Person and S. Guiducci Attended via Webex for Most of the Morning Session E. Paterson Attended via Webex for the Afternoon SessionE. Paterson Attended via Webex for the Afternoon Session Discussion Focused on Three Major AreasDiscussion Focused on Three Major Areas  Damping Ring Layout and Dimensioning  Mechanical Criteria and Equipment  Electrical Loads and Equipment 3

Global Design Effort - CFS ILC CFS and Global Systems Meeting Preparation for the DR TBR cont. Several Fundamental Conditions were EstablishedSeveral Fundamental Conditions were Established  In the RF Straight Section o RF Equipment will Take Up the Majority of Floor Space o Personnel will NOT Occupy the Equipment Cavern During Beam On Conditions o M. Palmer will Generate an Equipment Layout for the Equipment Cavern  There will be a Need for a Thermal Insulation Barrier Between the Equipment Alcove and the Beam Enclosure in the RF Straight Section – This Could Also Serve as the Needed Radiation Shielding as well (Equivalent of ¼” Steel + ¾” Lead)  Beamline Spacing o Centerline to Centerline Vertical Spacing Between Adjacent Damping Rings will be 1.3 m o Initial Positron Beamline will be 0.9 m Above the Finished Floor o Tunnel Diameter May be Reduced to 5.0 or 5.5 m dia. 4

Global Design Effort - CFS ILC CFS and Global Systems Meeting 5

Global Design Effort - CFS ILC CFS and Global Systems Meeting Preparation for the DR TBR cont. Several Fundamental Conditions were EstablishedSeveral Fundamental Conditions were Established  Temperature Requirements o Temperature in Operating Beam Tunnel 77 o – 87 o F Range with a Stability of +/ o F o Wiggler Sections will Need to be Enclosed for Temperature and Alignment Stability Including Cooling of Support Stands  Magnet Power Supplies o There will be 100 – 150 Power Supplies in Each 900 m Arc o Power Supplies will be Connected to a Water Cooled Buss  Injection/Extraction Straight o Two Smaller Alcoves will be Needed o Alcove will Likely be ~10 m Wide with Beamline Approximately in the Middle of the Enclosure with Aisles on Both Sides  Two Shafts are Still Required – One Large Diameter, One Smaller Diameter – Both Positioned on the Inside of the Damping Ring  Several Adjustments to the Mech/Elec Criteria Spreadsheet were also Established 6

Global Design Effort - CFS ILC CFS and Global Systems Meeting Preparation for the DR TBR cont. M. Palmer will Provide an Equipment Layout for the RF AlcoveM. Palmer will Provide an Equipment Layout for the RF Alcove Emil will Make the Necessary Adjustments to the Mech/Elec Spreadsheets and Exchange Them for Review with M. Palmer and S. GuiducciEmil will Make the Necessary Adjustments to the Mech/Elec Spreadsheets and Exchange Them for Review with M. Palmer and S. Guiducci CFS will Prepare Updated Drawings and Add to Updated Criteria Sheets for a Final Review by CFS and Damping Ring Groups Prior to the TBR at Frascati in JulyCFS will Prepare Updated Drawings and Add to Updated Criteria Sheets for a Final Review by CFS and Damping Ring Groups Prior to the TBR at Frascati in July Once Verified at the Frascati Meeting, the CFS Criteria will be Posted on the EDMS SystemOnce Verified at the Frascati Meeting, the CFS Criteria will be Posted on the EDMS System 7

Global Design Effort - CFS ILC CFS and Global Systems Meeting KEK Tunnel Configuration Study Consultant Study was Completed in JFY10Consultant Study was Completed in JFY10 A. Enomoto Provided a Presentation to KEK at the End of May, 2011A. Enomoto Provided a Presentation to KEK at the End of May, 2011 During the ILD Collaboration Meeting in Paris, CFS Met with A. Yamamoto to Review Atsushi’s KEK PresentationDuring the ILD Collaboration Meeting in Paris, CFS Met with A. Yamamoto to Review Atsushi’s KEK Presentation Atsushi will Provide a Similar Presentation to the CFS Group on June 14Atsushi will Provide a Similar Presentation to the CFS Group on June 14 Some Questions Still Need to be AddressedSome Questions Still Need to be Addressed  Per Meter Tunnel Unit Costs Appear to Be Provided but it is Unclear How Underground Cavern and Alcove Costs are Included  Also how are Horizontal and Vertical Access Enclosures Included 8

Global Design Effort - CFS ILC CFS and Global Systems Meeting ILD Collaboration Meeting CFS, MDI, ILD and SiD Groups were RepresentedCFS, MDI, ILD and SiD Groups were Represented 5/22 (Sunday) was an MDI/Detector Meeting5/22 (Sunday) was an MDI/Detector Meeting 5/23-5/25 was the ILD Collaboration Meeting5/23-5/25 was the ILD Collaboration Meeting  Good Presentations and Discussion of CFS/Detector Interface  Re-Established the Need for Platforms for Both Detectors  Also Affirmed that Both Detectors are Self-Shielding and Therefore No Shielding Wall is Required  A Clear Zone of 15 m from Beam Centerline is Required for Magnetic Field Impact  Y. Sugimoto Provided a Presentation on the Asian Mountain Site Interaction Region and Horizontal Access issues T. Lackowski and J. Osborne Provided Presentations for the IR Regions in the Americas and European Regions RespectivelyT. Lackowski and J. Osborne Provided Presentations for the IR Regions in the Americas and European Regions Respectively 9

Global Design Effort - CFS ILC CFS and Global Systems Meeting Progress with IR Region Consulting ARUP UK Representatives Attended the ILD Collaboration Meeting and a Full Afternoon was Devoted to Presentations and Discussion with the CFS, ILD and SiD AttendeesARUP UK Representatives Attended the ILD Collaboration Meeting and a Full Afternoon was Devoted to Presentations and Discussion with the CFS, ILD and SiD Attendees Two of Four Proposals will be Funded at this TimeTwo of Four Proposals will be Funded at this Time  Task One – Detector Platform Design o Americas Region will Fund This Task o Task will Include Concrete Platform Design and a Review of Options for Platform Movement o Criteria for Deflection and Positioning, Maximum Acceleration Forces and Movement Cycles will be Included in the Analysis  Task Two – Rock Behavior Model/Study o European Region will Fund This Task o Model will be Based on CERN Geology and IR Region Design o At a Later Date, a Similar Model can be Pursued for the Americas and Asian Regional Conditions 10