GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 1 GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.

Slides:



Advertisements
Similar presentations
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Advertisements

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectMonthly Status Meeting Jan 26, Project Status January 26, 2006 Gamma-ray Large Area Space Telescope Lowell A. Klaisner Project.
GLAST LAT ProjectLAT Face to Face, July 17-18, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center
Microsoft Project 2002 Sessions 5-6. Entering Tasks During this first session we will enter a set of tasks that comprise building a shed – data sheet.
GLAST LAT ProjectMonthly Status Meeting, June 30, Cost/Schedule Reports for 4.1 LAT Presentation Presentation May 2005 Month End Gamma-ray Large.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Martin Nordby Stanford Linear Accelerator Center Stanford University.
GLAST LAT ProjectEngineering Meeting, April 1, GLAST Large Area Telescope Engineering Meeting Quality Assurance And Manufacturing Preparations April.
GLAST LAT ProjectEngineering Meeting, December 3, GLAST Large Area Telescope: Engineering Meeting December 10, 2002 Lowell A. Klaisner Stanford.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Management 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting Management March 9th,
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectSLAC Annual Program Review, April 9-11, 2003 W. Althouse LAT-PR GLAST Large Area Telescope: LAT Project Status W. Althouse.
GLAST LAT Project 1S. Ritz All Hands Items 11 August 2004.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
Chapter 10: Monitoring and Controlling Change
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Offline SoftwareWorkshop - SLAC, Jan , 2001 R.Dubois Lehman Review Feb Joint NASA/DoE review My understanding: –“The purpose of the.
GLAST LAT ProjectNovember 17, 2004 AntiCoincidnce Detector 1 GLAST Large Area Telescope: Face to Face Meeting November 17, 2004 AntiCoincidence Detector.
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
1 ev14a Interactive Session 4 u Tuesday, July 17 7pm to 10pm u Build a sqa plan for the dental office software u Assume a 3-person, development team, a.
1. Earned Value Analysis (EVA) Earned value is a measure of progress enables us to assess the “percent of completeness” of a project using quantitative.
GLAST Large Area Telescope:
EARNED VALUE MANAGEMENT (EVM)
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 G. Haller 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
National Aeronautics and Space Administration November 23, Gamma-ray Large Area Space Telescope (GLAST) Kevin Grady, Project Manager Steven Ritz,
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST Large Area Telescope (LAT) Overview Peter F. Michelson Instrument Principal Investigator Stanford University William E.
GLAST LAT ProjectApril 2005 Project Status Overview May 24, April, 2005 Lowell Klaisner LAT Project Manager Rev. - LAT Project Status Overview Gamma-ray.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Mission - LAT ProjectDOE/NASA Review March 31, 2004 Section ISOC 1 GLAST Large Area Telescope: ISOC Subsystems WBS: 4.1.B David Lung Stanford Linear.
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 PREP For CDR - April Schedule Wall Walk GSFC Chart Flip (Select) Post.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom1 Elliott Bloom Integration and Test and Calibration Manager
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
1 Earned value analysis Planned value (PV) or Budgeted cost of work scheduled (BCWS) – original estimate of the effort/cost to complete a task (compare.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 2 Project Management 1 GLAST Large Area Telescope: Schedule, Cost, Management.
Schedule Control (Earned Value)
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 1 Presentation 1 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review W.
I&T&C Organization Chart
GLAST Large Area Telescope:
Integration, Test, and Calibration
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
Large Area Telescope Project
Earned Value Measures Planned Value (PV) Earned Value (EV)
فرآيند كنترل پروژه.
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Wednesday, March 31, :00 – 8:30 am Executive session Dan Lehman
Integration and Test Organization Chart
March ’05 Face to Face Meeting Introduction
Introduction and Overview
GLAST Large Area Telescope:
Overview Cost to Complete
GLAST Large Area Telescope: Deputy for Systems Engineering
Presentation transcript:

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 1 GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager Gamma-ray Large Area Space Telescope Monthly Review June 30, 2004

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 2 Overview Tracker EM passed vibration test at Qualification Levels! Grid match drilled with ACD base assembly New management personnel –Persis Drell joined the project as Deputy Project Manager She will direct Tracker, ISOC, and SAS Short term emphasis is on Tracker –Jeff Fisher has joined as Flight Software Manager –Ken Fouts will arrive in July as I&T Lead Engineer –Brigitte Estey will arrive in July as Production Manager –Rob Cameron arrives in August as ISOC manager

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 3 Proposed LAT Organization Chart Principal Investigator P. Michelson Instrument Scientist S. Ritz Senior Science Advisory Committee N. Gehrels Collaboration Science Team Project Manager L. Klaisner D. Horn, Deputy P. Drell, Deputy Instrument Advisory Committee S. Kahn Instrument Science Performance S. Ritz W. Atwood D. Horn Tracker R. Johnson Design Engineering R. Black ACD D. Thompson DAQ & FSW G. Haller Integration &Test E. Bloom SAS R. Dubois Mechanical M. Campell ISOC R. Cameron W. Craig (acting) Calorimeter N. Johnson EPO L. Cominsky Chief of Electronics G. Haller System Engineering P. Hascall Mission Assurance D. Marsh Production B. Estey Project Controls T. Boysen P. Drell Administration D. Nicholson L. Klaisner ITAR Management S. Williams Staff Physicist T. Himel J. Martin Design Int. & Anal. M. Nordby

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 4 Cost Cash flow is still tight for FY04 but doable –Lien list for FY04 equals $2,535K (after today’s CCB) –Arrangements underway to access the Stanford money Total Liens equal ~$6.5M and total contingency equals ~$8M

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 5 Lien List (after today’s CCB action)

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 6 Budget, Cost, Funding, Performance

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 7 Schedule PMCS schedule as of May ’04 shows 4 weeks float to LAT RFI (December 1, 2005) –Delivery of the first 10 modules supports 7 weeks float Need to work Tracker schedule after module 8 –Robert and Persis going to Pisa in July System Engineering is preparing a road map for system test

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 8 Module Deliveries

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 9 Current Critical Path Towers A-12 MCM Production 12/3/04 (-68) Thermo Vac & Shake Test TKR Tower 13 3/9/05 (-46) Integrate LAT- Wide Electronics 4/14/05 (-34) Integrate ACD 4/27/05 (-31) System Test 7/12/05 (-25) Ready for CD-4 7/13/05 (-25) Completion Dates (Baseline Variance) Integrate TKR/CAL Towers /25/05 (-39) TKR Tower 12 Assy & Test 2/16/05 (-31) Float 1 day Pre-Test/CD-4 Review 7/14/05 Assembly & Test of TKR Flight Trays A-14 2/2/05 (-68) TKR Tower 14 Assy & Electrical Test 2/15/05 (-36)

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 10 Current Critical Path ● MCM Production and Assembly of Tracker Flight Tray Panels: 1 day float to “Ready for CD-4” Review” 4 weeks to LAT pre-ship review ● Second critical path is driven by the TEM PCC fabrication (impacts delivery of the TEM PS Assembly A to I&T): 1 month behind the first critical path This is also the critical path to “Module A Integration” 9 weeks to LAT pre-ship review ● Third critical path is completion of the Mechanical Flight Grid to I&T: 1 day behind the second critical path

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 11 LAT Schedule

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 12 Today’s Agenda – Pacific Daylight Time 5:00 – 6:00am - ACD I&T Tour 6:00 - 6:15am - Project Status Overview - Lowell Klaisner 6:15 – 7:00am - ACD – Tom Johnson 7:00 – 7:45am - Calorimeter – Neil Johnson 7:45 – 8:15am - System Engineering Status & Action items - Pat Hascall 8:15 – 8:45am - Design Integration & Analysis – Martin Nordby 8:45 – 9:00am - Design Engineering – Rob Black 9:00 – 9:30am - Mechanical/thermal Hardware - Marc Campell 9:30 – 10:00am - **** Break 10:00 – 10:45am - DAQ/EGSE Hardware – Gunther Haller 10:45 – 11:15am - FSW/ISIS – Terry Schalk/Eric Hansen 11:15 – 11:30am - EPO (Telecon) – Sarah Silva 11:30 – 12:15pm - Tracker – Robert Johnson 12: :30pm - **** Break 12:30 – 1:15pm - I&T – Elliott Bloom 1:15 – 1:45pm - Performance & Safety Assurance – Darren Marsh 1:45 – 2:00pm - SAS – Richard Dubois 2:00 – 2:30pm - ISOC - Bill Craig 2:30 – CCB Meeting

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 13 Backup Material

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 14 Lien List

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 15 CPR Level 3 Notable current period variances Total project schedule variance Cumulative Variance > +/-10% (will be reported to DOE/NASA)

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 16 LEGEND BAC: Budget At CompleteSV $: Schedule Variance = BCWP - BCWS% BCWS: Percent Scheduled = BCWS/BAC BCWS: Budgeted Cost of Work Scheduled (to date)CV $: Cost Variance = BCWP - ACWP% BCWP: Percent Complete = BCWP/BAC BCWP: Budgeted Cost of Work Performed (to date)SPI: Schedule Performance Index = BCWP/BCWS% ACWP: Percent Spent = ACWP/BAC ACWP: Actual Cost of Work Performed (to date)CPI: Cost Performance Index = BCWP/ACWP Cpi_Fcst: CPI (to date) EAC Forecast = BAC / CPI CpiSpi_Fcst: Combination CPI and SPI EAC Forecast = ACWP + (BAC - BCWP) / (CPI *SPI) Performance Analysis Worse than 0.85Between 0.95 and 1.10 Between 0.85 and 0.95Better than 1.10 CPI and SPI Change Thresholds

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 17 Variance Analysis Nov03 Rebaseline Current Period

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 18 CV and SV Chart

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 19 Level 1-2 Milestones

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 20 Level 3 Milestones by Subsystem

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 21 Level 3 Milestones by Subsystem

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 22 Level 3 Milestones by Subsystem

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 23 Level 3 Milestones by Subsystem

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 24 Level 3 Milestones by Subsystem

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 25 Level 3 Milestones by Subsystem

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 26 Level 3 Milestones by Subsystem

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 27 Level 3 Milestones by Subsystem

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 28 Level 3 Milestones by Subsystem

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 29 Level 3 Milestones by Subsystem

GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 30 LAT Schedule – April Data