Presentation is loading. Please wait.

Presentation is loading. Please wait.

Chapter 10: Monitoring and Controlling Change

Similar presentations


Presentation on theme: "Chapter 10: Monitoring and Controlling Change"— Presentation transcript:

1 Chapter 10: Monitoring and Controlling Change
PMP Study Guide Chapter 10: Monitoring and Controlling Change

2 Chapter 10 Monitoring and Controlling Change
Managing Integrated Change Control Managing Cost Changes Monitoring and Controlling Schedule Changes Monitoring and Controlling Risk

3 Managing Integrated Change Control
How change occurs Change control concerns Change control techniques Integrated Change Control outputs

4 Change Control Concerns
Influencing the factors that cause change and reaching agreement on change requests Determining a change is needed or has happened Managing approved changes Updating requirements that impact project plan Documenting requested changes and their impacts

5 Integrated Change Control
Configuration management Change control system Configuration control board

6 Chapter 10 Monitoring and Controlling Change
Managing Integrated Change Control Managing Cost Changes Monitoring and Controlling Schedule Changes Monitoring and Controlling Risk

7 Managing Cost Changes Performance Measurement Analysis
Earned value technique Planned Value (PV) = Budgeted Cost of Work Scheduled (BCWS) Actual Cost (AC) = Actual Cost of Work Performed (ACWP) Earned Value (EV) = Budgeted Cost of Work Performed (BCWP)

8 Earned Value Figure 10.1

9 Earned Value Formulas Cost Variance (CV) = EV – AC
Schedule Variance (SV) = EV – PV Performance Indexes Cost Performance Index (CPI ) = EV ÷ AC Cumulative CPIC = EVC ÷ ACC Schedule Performance Index (SPI) = EV ÷ PV Cumulative SPIC = EVC ÷ PVC

10 Earned Value Formulas (cont.)
Estimate to Completion (ETC) ETC = (BAC – EVC ) ÷ CPIC ETC = BAC – EVC Estimate at Completion EAC = ACC + ETC EAC = ACC + ((BAC – EV) ÷ CPIC) EAC = ACC + BAC – EV Variance at Completion VAC = BAC – EAC

11 Chapter 10 Monitoring and Controlling Change
Managing Integrated Change Control Managing Cost Changes Monitoring and Controlling Schedule Changes Monitoring and Controlling Risk

12 Monitoring and Controlling Schedule Changes
Schedule control involves determining status of project schedule, if changes have occurred or should occur, and influencing and managing schedule changes

13 Monitoring and Controlling Schedule Changes Tools and Techniques
Progress reporting Schedule change control system Performance measurement Variance analysis Project management software Schedule comparison charts

14 Chapter 10 Monitoring and Controlling Change
Managing Integrated Change Control Managing Cost Changes Monitoring and Controlling Schedule Changes Monitoring and Controlling Risk

15 Monitoring and Controlling Risk
Risk Monitoring and Control tools and techniques Risk reassessment Risk audits Variance and trend analysis Technical performance measurement Reserve analysis Status meetings

16 Monitoring and Controlling Risk
Risk Monitoring and Control outputs Risk register updates Requested changes Recommended corrective actions Recommended preventive actions Organizational process asset updates Project management plan updates


Download ppt "Chapter 10: Monitoring and Controlling Change"

Similar presentations


Ads by Google