Presentation is loading. Please wait.

Presentation is loading. Please wait.

March ’05 Face to Face Meeting Introduction

Similar presentations


Presentation on theme: "March ’05 Face to Face Meeting Introduction"— Presentation transcript:

1 March ’05 Face to Face Meeting Introduction
Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Lowell A. Klaisner Project Manager Stanford Linear Accelerator Center March ’05 Face to Face Meeting Introduction Rev A

2 SIRTF Launch on a Delta II Heavy
Master Schedule LAT complete and tested December 2005 To NRL for environmental testing Delivery to Observatory Integration June 1, 2006 Mate with spacecraft and GBM and test Launch August 31, 2007 Kennedy Space Flight Center SIRTF Launch on a Delta II Heavy

3 LAT Schedule

4 Module Schedule

5 Mission office schedule options
NASA management investigated an option to preserve schedule The configuration investigated was: 16 Calorimeters 12 Tracker towers Remaining instrument per the current baseline Saves approximately 1 month of schedule Steve Ritz and Peter Michelson presented the scientific implications of exercising this option to Anne Kinney, Director, Universe Division, on February 24 Decision to adopt this option was postponed to give the LAT the opportunity to demonstrate execution to the proposed schedule

6 Status as of January 31, 2005 Cost and Commitments through January 31, $129M Planned Budget at Completion of fabrication $156M Cost to go for fabrication $ 27M Cost and Commitments as percent of planned budget 83%

7 FY 06 & 07 Costs

8 FY 06 & 07 Costs

9 FY 06 & 07 Costs

10 FY 06 & 07 FTEs

11 Next Step with FY06 and 07 budgets
Consolidate operating and fabrication plans Review with subsystem managers Propose to the mission office Restructure tracking accordingly i.e. close subsystem budgets at last delivery and track on-going support in a new contract


Download ppt "March ’05 Face to Face Meeting Introduction"

Similar presentations


Ads by Google