1 MICE PSAG PM report Brief overview Re-planning the project Solenoids, decay and spectrometer Open issues and worries Andy Nichols, STFC, PSAG, 5/5/10.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
1 UKNF/MICE Oversight Committee Open session Integration of the MICE project Background & local history Progress since 2007 Schedule & planning considerations.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
1 UKNF/MICE OsC PM report Summary assessment of MICE Risks, pressures and worries Project management Electrical substation, accommodation Redefining the.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 RF Power infrastructure Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
1 Schedule Discussion Background & aims Major milestones & drivers Summary of important dates Project risks MICE CM26, 24-27th March, 2010.
1 MICE-UKNF Oversight Committee MICE Project Manager Report Contents: New schedule and its implications Preparations for Steps II & III Spectrometer solenoids.
1 Project Manager Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
MICE - UK Project Progress Roy Preece 30 th April 2013.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
1 MICE CM32 Summary Scheduling and planning; aims for this year Schedule update Main schedule drivers Keeping us on schedule Comment on Steps V & VI Detail.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
Overview and status of international systems Reminder of the principal deliverables Status reports on: Spectrometer solenoids Radio Frequency Coupling.
1 PM report International & UK programmes Overview Reconstructing the schedule The UK Project Management team Progress with major subsystems Substation.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
UKNF/MICE PSAG, 3/5/11 Spectrometer solenoids: –Repair plan still ‘in approval’, already two months late –Workshop/mini review at LBNL 10 th /11 th May.
Infrastructure Update As at 11 th March 2009 Remaining four plates now fitted to North shield wall North & South walls and all galleries are considered.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 MICE PM Report Completion of Infrastructure Target, solenoids Phase Two planning & schedule Non-MICE costs Staffing & visitors Don’t have time for a.
Project manager report paul drumm CM16 October 2006.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
1 MICE CMPB Contents: Progress to date Project management things Plans for the May shutdown Steps towards Phase Two Problems and open issues summary Andy.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
1 MICE CM28 Schedule & Risk Comment Schedule reconstruction and management The ‘straight to Step IV’ discussion How a schedule meeting can work Risks (and.
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
Alain Blondel MICE collaboration meeting CM25 RAL November   MICE The International Muon Ionization Cooling Experiment.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
1 MICE CM27 PM Report Re-defining the UK project this FY Schedule things Apologies and accommodation Andy Nichols, STFC 7 th July, 2010.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
1 MICE PM report – status of Phase II Target update Spectrometer solenoid FC & coupling coils Schedule considerations Project accommodation & management.
1 Engineering Session Summary Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
1 MICE PM Report General Update –Phase I nearing completion –MICE Power –Actions for Decay solenoid & target –Follow-ups from last VC –Conclusions MICE.
1 MICE PM Report Infrastructure/integration progress Electrical work AFC, diffuser, etc Help with project control & staffing issues Worries & problems.
1 MICE Schedule Review no 1 Aims of review and description of review charge Motivation and external drivers Aims of the review A few of the problems Description.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
MICE CM23 Introduction and Meeting Goals Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 MICE CM29 Engineering Summary Cooling channel moving platforms – Norbert Floor Beams and plates – Andy L Magnetic modelling – Mike RF Engineering – Andy.
1 MICE CM25 Engineering Session Summary Contents: Infrastructure Diffuser Coupling Coils Radiation Shutter AFC module EMR Andy Nichols, STFC, 4-7 th November.
Schedule and Milestones Colin Whyte STFC RAL Resource Loaded Schedule Review 5 th April 2016.
UK Project Plan Roy Preece STFC RAL RLSR 26 th October 2015.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Muon Ionisation Cooling Experiment Overview
Resource Loaded Schedule and Budget Profile
MICE CM28 Engineering Session Summary (On behalf of Wing)
Status of the MICE Construction Project
MICE CM31 Schedule summary
MICE PM Report Progress with the Infrastructure A few problems
Presentation transcript:

1 MICE PSAG PM report Brief overview Re-planning the project Solenoids, decay and spectrometer Open issues and worries Andy Nichols, STFC, PSAG, 5/5/10

Overview Most detail has been covered in open session: Infrastructure at RAL in R5.2 is ready for Step II And mostly ready for Step III Target development is going very well, working ISIS target continues to give reliable service Decay solenoid has been disabled since January, has delayed Step I data-taking – more later FC #1 manufacture is progressing, but delayed six months – given other problems, not a worry Coupling coil contract has been signed in China RF cavity production well on schedule – major success Difficulties with spectrometer solenoid – this is the major influence on the project schedule just now No real progress with 2MVA substation upgrade Diffuser is ready to assemble PPS implementation complete by September First EMR planes delivered by July 2

 MICE Schedule as of Sept 2009 Sep-Dec 2009 STEP I Q2/Q Q > 2011 STEP II STEP IV 2011 STEP V 2012 STEP VI 2013 STEP III/III.1 Run date: This is where we hoped to be NOW

Re-planning the project All the ingredients for Step II are in place, except Spectrometer solenoid – see Mike’s talk Installation crew, facilities and UK costed plan were geared towards solenoid arrival in Q This is will not happen – major upheaval So we have to re-define the FY 10/11 project Important that we: Preserve the well-motivated staff Use the time sensibly Mitigate future technical risks by doing work in advance Presently we are planning to bring forward: Liquid hydrogen pipe & valve work, vent system and safety case work RF power infrastructure work in R5.2 Possibility to advance second LBL RF amplifier, either at DL or RAL New plan is ‘work in progress’ 4

Planning the project LH2 system: –Problem is we held up design work in 09/10 –Now need to do it quickly –So we can start hands- on work ASAP –If we start design now, hope to be done early Summer 5 High level vents Hydride Bed and Gas Panel Enclosure Location of absorbers in the MICE beamline

Planning the project For the RF: –We can do a lot –Locating the major components in R5.2 –Amplifiers –Loads –Waveguides –Cooling and power infrastructure –Large design job –Well worth investing a year of effort now –But again, it’s design work to do before the hands-on 6

Solenoids Decay solenoid summary: –He compressor shaft seals suspected for N2 leakage –Whole compressor exchanged in March –Failed....turned out we NEVER had He compatible seals fitted –They are being fitted today –In parallel, large leaks discovered on cold box pipe/valve and turbo compressors – are being rectified now, much more likely to be the smoking gun Risks & mitigation –Step I schedule in June/July user run now at risk –Might have to do concentrated run in that period and take a construction ‘holiday’ – need to know around June 1 st –MICE must become more self-reliant in cryogenic matters, not impressed with the industry support we’ve had, cryogenics grad engineer starts Sept

Solenoids Spectrometer solenoid summary –Magnet #2 has embedded open circuit in LTS leads between turret & cold mass – bad –Need to withdraw cold mass to repair –Quicker to revert to magnet #1, presently in pieces –Golden opportunity to start afresh with QA procedures, thermal understanding, documentation, detail design, etc –Very important that we stop and think, review committee meets 10 th May –Thermal margin being understood: At 4K measured heat load is around 6 watts But we have a cooling power of about 4.5 watts Understanding this is part of above process –BUT we might have to face up to five CCRs instead of three per magnet Futile to discuss detail schedule till after reviewers have met 8

Open Issues & Worries Spectrometer solenoid is clearly our biggest worry this year: Need to stop and calmly take stock: –Understand thermal imbalance and current lead failures –Is it a design or an execution/QA problem? –When we’ve done that, decide on a course of action (review committee meets 10 th May) –Design and manufacturing processes might have to be re- visited –Only then should we assess the schedule implications –Believe it’s critically important that manpower is reinforced in this area Several concrete leads being followed up by LBL –Very important that we carry this process forward through the other S/C magnet subsystems in a collaborative way – we do not know if we’re working with a flawed concept or not. –Hope the new person’s terms of ref allow this 9

Open Issues & Worries 2MVA upgrade – important that we keep up the momentum: –No clear message received on the status – still need it for Step III/IV - increasingly moves to Step III, as five CCRs per magnet very likely Pre-integration space at RAL –Permission received to occupy half of R9, but wait till cladding is completed Engineering integration: –We had a narrow escape with the Focus coil/absorber interface – cost us £20K and six months for a only a minor mod –Integration engineer is planned in – Jason Tarrant –But MICE has to invent a way of sharing design drawings and data – that’s my problem! 10