PTCS Aeroseal Specification Approval Measure Proposal Presentation to the Regional Technical Forum June 28, 2011.

Slides:



Advertisements
Similar presentations
Project Proposal: Multifamily Weatherization UES Scoping Study Regional Technical Forum June 1 st, 2011.
Advertisements

PTCS Aeroseal Specification Approval Measure Proposal Presentation to the Regional Technical Forum June 28, 2011.
Ductless Heat Pumps in Manufactured Homes with Zonal Electric Resistance Heat Adam Hadley Regional Technical Forum February 18, 2015.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
Deeming Savings for Ductless Heat Pumps in Manufactured Homes Regional Technical Forum January 4 th, 2011.
Quality Assurance/Quality Control Policy
PTCS DUCT SEALING SPECIFICATIONS The Perfect Spec : Simple as possible Achievable by the motivated, not just the true believer Assure that energy savings.
Prescriptive Duct Sealing UES Measure Proposal Regional Technical Forum Subcommittee July 8, 2013.
1 ENERGY STAR ® and Air Sealing Products: New Program Requirements Doug Anderson, US EPA 1.
Fan VFD Calculator Development Staff Request for Authorization of Funding from the Regional Technical Forum 28 June 2011.
Commercial Showerhead UES Measure Update Regional Technical Forum Staff Update June 18, 2013.
Residential New Construction Montana House: UES Measure Update Adam Hadley Regional Technical Forum April 14, 2015.
Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
PTCS Service Provider Review 0 Background RTF assumed responsibility for maintaining PTCS specifications in March 2003  Developed PTCS Service Provider.
Heat Pump Water Heaters: Tier 2 – Ducted Interior Installations Provisional UES Proposal Regional Technical Forum February 14 th, 2012.
Plans to bring Out-of-Compliance UES Measures back into Compliance: 1. Agricultural Irrigation Hardware UES 2. Agricultural Motors UES Regional Technical.
Residential Weatherization and Ventilation Specs Subcommittee Updates Regional Technical Forum March 2 nd, 2010.
RTF Research and Evaluation Subcommittee Meeting Regional Technical Forum April 15, 2013.
New Measure Proposal Review and Prioritization Jennifer Anziano, Adam Hadley, Mohit Singh-Chhabra, Christian Douglass Regional Technical Forum February.
Of moderated conference calls on energy efficiency Utility Brown Bag Series PTCS Commissioning Updated following May 17, 2006 Conference Call Speakers:
Residential Weatherization and Ventilation Subcommittee: Infiltration Impact Research Plan Presentation to the Regional Technical Forum February 14, 2012.
Quality Cost Quality Cost- those cost associate with the non achievement of product or service quality. Types Prevention Cost –Planning, Document, Control,
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
Non-Residential Network Computer Power Management UES Measure Update Regional Technical Forum July 16, 2013.
Pre-Rinse Spray Valve Small Saver UES Measures Regional Technical Forum September 17, 2013.
Residential Single Family HVAC UES Measures Proven and Planning UES Measure Proposals Adam Hadley Regional Technical Forum December 16, 2014.
Residential Weatherization and Ventilation Subcommittee Presentation to the Regional Technical Forum August 30, 2011.
Standard Information Workbook Update Regional Technical Forum May 21, 2013.
Applying SEEM Updates, Calibration, and Measure Interaction Decisions to: Manufactured Homes Weatherization UES Measures Regional Technical Forum June.
Agricultural Irrigation Pump Variable Frequency Drive Provisional Standard Protocol Proposal Regional Technical Forum April 16, 2013.
Commercial Showerhead UES Measure Update Regional Technical Forum Staff Update June 18, 2013.
Sunset Date Extension Requests Jennifer Anziano Regional Technical Forum August 18, 2015.
RTF Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
Oregon ENERGY STAR Homes Measure Update Adam Hadley Regional Technical Forum March 17, 2015.
Heat Pump Water Heater Request for Feedback on a proposal to add UES measures with a “Retail – any installation location” delivery mechanism Regional Technical.
Refrigerator Decommissioning: Measure Status Update Regional Technical Forum October 16, 2013.
RTU Measure Preparation for Review as Standard Protocol Staff Request for Authorization of RFP Funding from the Regional Technical Forum 28 June 2011.
Air Source Heat Pump Specifications Proposed Revisions Regional Technical Forum Subcommittee July 2, 2013.
RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015.
Integration Issues for RTF Guidelines: Savings, Lifetimes and Cost/Benefit October 24, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
1 PTCS Training, Certification and Quality Assurance Equivalency November 4, 2003.
Residential Weatherization and Ventilation Subcommittee: Infiltration Impact Research Plan Presentation to the Regional Technical Forum December 13, 2011.
PTCS Commissioning, Controls & Sizing Update of UES Measure Category and/or Status Regional Technical Forum July 15, 2014.
RTF Staff, Subcommittee and Work Updates June 19, 2012.
Structure and Integration of RTF Guidelines: Savings, Lifetimes and Cost/Benefit July 17, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
RTF Administrative Measure Decisions November 14, 2012.
Proposed Changes to PTCS Duct Standards April 7 th, 2009 Regional Technical Forum.
Applying SEEM Updates, Calibration, and Measure Interaction Decisions to: Manufactured Homes Weatherization UES Measures Regional Technical Forum December.
Residential Weatherization and Ventilation Specs Subcommittee Updates Regional Technical Forum March 2 nd, 2010.
UES Measure: Commercial – Traffic Signal LED’s Commercial – Traffic Signal LED’s Proposal to Change Status from “Under Review” to “Active” Regional Technical.
Heat Pump Specifications Summary of Requirements for RTF and PTCS Installations and Updates November 4, 2003.
Residential Refrigerator UES Measure Update Regional Technical Forum April 16, 2013.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
PTCS Subcommittee Recommendations ARHI Certification for Standalone Heat Pump Commissioning and Controls Measures AND Simplified Heat Pump Sizing Method.
Planning UES Measures: SF New Construction Heat Pump Upgrades (9.0 HSPF and VCHP) Heat Pump Commissioning Controls and Sizing Adam Hadley Regional Technical.
Regional Air Source Heat Pump Performance and Savings Research and Evaluation Project Proposed Scope of Work and Estimated Budget February 10, 2004.
Research and Evaluation Subcommitee – 2014 Plans Regional Technical Forum January 22, 2014.
Planning UES Measures: Prescriptive Duct Sealing SF Performance-based Duct Sealing SF Performance-based Duct Sealing MH Adam Hadley & Josh Rushton Regional.
Proposed Edits to the Air Source Heat Pump Specifications Regional Technical Forum August 20, 2013.
Non-Residential Network Computer Power Management Christian Douglass Regional Technical Forum January 21, 2016.
Agriculture Irrigation Hardware UES Measure Update Regional Technical Forum April 16, 2013.
Proposed Changes to PTCS Service Provider Standards And other PTCS Issues March 2 nd, 2009 Regional Technical Forum.
Residential Behavior-based Programs Measure Development Update Ryan Firestone Regional Technical Forum March 15, 2016.
PHASE 1 UES REVIEW: PROGRESS UPDATE December 13, 2011 Regional Technical Forum Presented by: Jeff Romberger and Mark Kendall.
UES MEASURE REVIEW PROJECT Final Report March 14, 2012 Regional Technical Forum Presented by: Jeff Romberger.
Management of PTCS Service Providers Subcommittee Recommendation Regional Technical Forum July 7 th, 2009.
RTF Delivery Verification Guidance Batch 3 Jennifer Light Regional Technical Forum November 10, 2015.
Technician’s Guide & Workbook for Duct Diagnostics and Repair
Fiber Reinforced Polymer Systems
Presentation transcript:

PTCS Aeroseal Specification Approval Measure Proposal Presentation to the Regional Technical Forum June 28, 2011

Measure Summary PTCS Duct Sealing & Heat Pump UES Measure Requesting Measure Status Change: No Change in measure savings: No Change in measure cost effectiveness: No Follow-up for RTF: Technical Specification Maintenance

Measure History Previously approved: Specifications Administered by RTF Since 03/2003 Measure Developer(s): RTF and subcommittee PTCS not current with Guidelines – Workbooks: Complete – Summary sheet: Need one – Documentation: Adequate – Measure cost and life documentation: Complete – Data and evaluation sources: Needs evaluation

Subcommittee Summary Subcommittee meetings: 5/26/2011 Subcommittee members: Adam Hadley, Zach Erdmann, Mark Jerome, Jeff Haberman, Todd Blackman, Darroll Clark, Neal Walsh, Mark Johnson, Mark Kendall, Andres Morrison, Brady Peeks

Aeroseal History With PTCS – Aeroseal previously has been recognized by RTF as delivering a valid duct total 25 Pa test. – Aeroseal presented to the PTCS subcommittee a test protocol that utilizes a blower door with a digital manometer to work in conjunction with the Aeroseal machine. – Protocol will utilize a routine in the Aeroseal software to deliver a duct leakage to outside measurement at any desired test pressure

PTCS Changes – AeroSeal technician would be required to obtain PTCS duct sealing certification. All PTCS duct sealing requirements apply (e.g., assuring mechanical connections, etc.). – Only changes would be the equipment used by the technician to test leakage and the method by which duct sealant is applied

Sub Committee Recommendation: Accept Aeroseal equipment with blower door and duct leakage to outside test protocol as a PTCS-allowed method for measuring duct leakage to outside at 50 PA - Consensus

Decision Impact Specifications: No change necessary Savings: No impact Life: No impact Measure cost: No impact Cost to certify measure: No impact Practitioner qualifications: No change, PTCS certification required Evaluations requirements: No impact

RTF Proposed Motion: “I _________ move that the RTF approve the use of the Aeroseal machine in combination with a blower door to measure duct leakage to outside at 50 Pa, using the test protocol developed by Aeroseal and incorporated into the Aeroseal software system.”

PTCS Heat Pump Warrantee Specification Change Approval Measure Proposal Presentation to the Regional Technical Forum June 28, 2011

Changes to PTCS Remove From Specification: Heat pump equipment shall be warranted by the manufacturer against defects in material and workmanship for a minimum of 5 years from the date of start-up of the equipment. In addition, the compressor shall be warranted by the manufacturer against defects in material and workmanship for a minimum of five years from the date of startup. Warranties shall cover parts and labor. Participating Installers may offer to consumers the manufacturer’s extended warranty or service agreement to comply with the warranty requirements. This warranty should not be considered to cover equipment failure caused by failure to perform normal maintenance, abuse, or external causes beyond the control of the installing Participating Installer. Replace with: 3.3 New System Warranty The participating Installer shall provide to the consumer in writing the manufacturer’s warranty.

Sub Committee Recommendation Accept edits to PTCS heat pump specifications to allow manufacturer warranty terms on heat pump equipment. - Consensus

Decision Impact Specifications: No change necessary Savings: No impact Life: No impact Measure cost: Possible reduction consumer is not required to purchase extended warranty Cost to certify measure: No impact Practitioner qualifications: No change, PTCS certification required Evaluations requirements: No impact

RTF Proposed Motion: “I _________ move that the RTF approve amending the PTCS heat pump specifications section 3.3, New System Warranty, to eliminate requiring specific warranty periods, thus reading as follows: 3.3 New System Warranty The participating Installer shall provide to the consumer in writing the manufacturer’s Warranty.”