Lisa F. | May 20, 2014 Introduction to Lighting Incentives & Process for Medium/Large Customers.

Slides:



Advertisements
Similar presentations
© 2006 San Diego Gas and Electric. All copyright and trademark rights reserved. How to fund your Virtualization Project SDG&E 2007 Energy Efficiency Program.
Advertisements

Planned Lighting Services Concepts & Practices. Lighting: An Important Asset Reduces operating costs Adds to safety and security Maximizes energy utilization.
Program Overview February 25, Program Summary Approximately $14M in incentives per year Cap for Large Customers: $300,000 per year Prescriptive.
Start of Presentation ALLUME, LLC High Performance – Energy Efficient Lighting and Controls.
NATURAL GAS: The Next Step Emily Fisher Special Projects Coordinator.
Save Energy and Money PNM Energy Efficiency Programs
Step Up Payback Proposal Program “How-To” 9/4/07.
Refrigeration Energy Solutions February 24, 2010.
Grow your business with Dominion Power and Good Cents
NJ SmartStart Buildings New Jersey Higher Education Partnership for Sustainability (HEPS) January 20, 2012 Presenter: BPU President Robert Hanna.
Commercial Energy Efficiency Program GAPPA May 27, 2014.
Commercial Energy Efficiency Program IFMA Luncheon July 16, 2014.
Leo Castillo | May 20, 2014 Introduction to Lighting Incentives & Process for Common Area Lighting.
Agenda 1.Introduction 2.Program Goals & Incentives 3.Project Work Flow 4.RELIGHT Analysis Tool 5.Designer Agreement.
Renewals Review January Why are We Here Today ? During today’s web-conference, we’ll : Review the renewals “package” Discuss the process for.
Opportunities to Collaborate with Electric Utilities on Energy Efficient Vending Machines.
Connecticut Energy Efficiency Incentive Program Overview of Program February 2010 DPUC-Approved Energy Efficiency Incentives for Connecticut Electric Users.
Energy Assessment Spreadsheet Ashok Kumar Somik Ghose Rahul Pendse Charanya Varadarajan.
Solar Incentives for Arizona Public Service, Salt River Project, Tucson Electric Power.
Sustainable IT at Stanford S T A N F O R D U N I V E R S I T Y S U S T A I N A B L E I T Page 1 Energy Efficiency Rebates & Sustainable IT Sustainable.
© 2010 San Diego Gas and Electric Co. and Southern California Gas Company. All copyright and trademark rights reserved. On-Bill Financing Frank Spasaro.
Put Your Business in the Best Light Commercial and Industrial Lighting Program.
Genesis Solar Module Brochure ™
1 Ex Ante Review of the SBD Program Energy Division Staff and Contractors Energy Efficiency Industrial/Agricultural Programs and Portfolio Forecasting.
SPS Donate Now VT. Donate Now Test Account Please use the following test account when you are conducting a demo of the Donate Now VT with your merchant:
Frank G. Jackson, Mayor Office of Equal Opportunity Monthly Report and Affidavit An Introduction.
Scott Cooper | May 20, 2014 Built Smart and New Construction.
BerkeleyFIRST Financing Initiative Renewable and Solar Technology Mimi Frusha, Renewable Funding October 10,
DTE Energy Commercial & Industrial Energy Optimization Program Energy Efficient, Sustainable Detroit DTE Energy Headquarters December 9, 2010.
© 2013 Venture Lighting International 1 ANNOUNCING Project Financing To Close More Deals.
NC CFW Expenditure reports How to complete and submit an expenditure report Expenditure reports How to complete and submit an expenditure report.
Resource Conservation Program November 2003 Kelley Gonzales Resource Conservation Manager.
LED Case Lighting in Vertical and Semi-Vertical Open Refrigerated Cases Eric Mullendore – Energy Analyst PECI 6/29/2010.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
CITY OF POUGHKEEPSIE LED STREET LIGHTING May 5, 2014.
“Do Green” Two Options: Prescriptive Custom Prescriptive- -Must be running a MODULATING ROTARY SCREW AIR COMPRESSOR -Must be 75 Horsepower or Less Custom-
Secretary Kenneth C. Holt Maryland Department of Housing and Community Development WholeHome September 30, 2015 Secretary Kenneth C. Holt Deputy Secretary.
Lucie Huang | May 20, 2014 Custom Projects. 2 2 Any Energy Savings Capital Measure that is not covered by Standard Spreadsheets, AND is a proven technology.
M&V Part 4: M&V Plan Review. 4-2 M&V Plan Review Ø FEMP Documents F M&V Overview Checklist (Phase 2) F Final M&V Plan Checklist (Phase 3) Ø Risk & Responsibility.
DEPARTMENT OF HEALTH CARE SERVICES Audits & Investigations – Financial Audits Branch.
New Jersey’s Clean Energy Program: 2011 Renewable Energy Plan Overview of Final Compliance Filing REC Meeting 12/7/10 Charlie Garrison.
[DATE] [PLACEHOLDER FOR DISTRIBUTOR LOGO]. Low Wattage T8s: A Win for Customers Cost Savings Product Quality Easy Installation Energy Savings.
Energy Project M&V: Reports that Add Value October 27, 2015.
Advanced Energy Engineering Technology Modeling Building Energy Systems Session 7: Lighting and daylighting.
Electric / Gas / Water Summary of Final Evaluation Report Prepared by: Rafael Friedmann, PG&E Kris Bradley & Christie Torok, Quantum Consulting 2003 Statewide.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Electric / Gas / Water Summary of Final Evaluation Report Prepared by: John Cavalli, Itron Beatrice Mayo, PG&E July 27, Express Efficiency Program.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
Overview for Local Energy Committees February 10, 2016.
1 The Power to Make a Difference Sustainable Energy Fund Workshop Bethlehem, PA March 23, 2012 Information in this presentation subject to change.
Consumers Energy Small Business Solutions 2016 Program Year Kickoff Marina Escobar January 11,
Commercial Energy Assessments City of Ames Emily Rice The Energy Group.
 ENERGY. EFFICIENCY. EASY SIMPLIFYING & ACCELERATING REVENUE GENERATION FROM ENERGY EFFICIENCY SUSTAINABLE ENERGY FUND 2 ND ANNUAL ENERGY SERVICE PROVIDER.
November 2, 2011 Comprehensive Lighting: Solutions for the Greater Good David Landers Manager, Business Energy Management Efficiency Connections Northwest.
Draft SMECO EmPOWER Plans April 15, 2011.
Town of Mountain Village Lighting Projects. ICAST Mission To provide economic, environmental, and social benefits to communities in a way that builds.
EmPOWER Maryland Utility Program Enhancements Meeting Review of BGE’s Filed Multifamily, Custom and Re-Commissioning Programs Discussion on Future Enhancements.
Energy and Environmental Solutions Company Confidential—Siemens Building Technologies 2008 SLS 242/342: Performance Contracting - Proposing Opportunities.
Mimi Frusha, Renewable Funding
Fort Stanwix National Monument Energy Audit Contract
2017 Commercial Energy Efficiency Program
DLL Clean Technology Financing Lighting Projects and our Vendor Partner John Ceschan 5/2/16.
Water-Energy Saving Fixtures
Frank Spasaro CPUC Financing Conference November 16/17, 2010
Home School Association
CAPE & OUR PPN HISTORY IN BUSINESS SINCE 1953, PPN MEMBER SINCE 2014
[PLACEHOLDER FOR DISTRIBUTOR LOGO]
Commercial Programs Elisabeth Reyes, Meagan Brown
PG&E EV Fleet Program.
PG&E EV Fleet Program.
Presentation transcript:

Lisa F. | May 20, 2014 Introduction to Lighting Incentives & Process for Medium/Large Customers

2 Processes

3 3 1.Sign contract. By signing the contract the customer has secured funding for three (3) years. 2.Upon completion of the installation, customer calls City Light to schedule inspection. 3.Customer provides documentation specified in City Light contract. (i.e. invoices and Lamp and Ballast Disposal Form) 4.On-site inspection is scheduled. 5.Payment is issued upon verification of contract compliance and review of required documentation. 6.Customer receives check within 30 business days. Contract Process

4 4 Incentives Seattle City Light’s Energy Smart Services Program encourages customers to purchase more efficient equipment and use new technologies by helping pay for the incremental cost of the higher efficiency options. Incentive levels are based on kWh savings realized during the first year. The factors that determine the baseline include: Accurate description of existing lighting and controls system Annual operating hours Heating and cooling information Consideration of possible 70% Energy Smart Services Cost Caps

5 5 Incentive Process 1.Contact Seattle City Light well before you start the project. 2.A contract must be executed between the customer and Seattle City Light before equipment is purchased or installed. No Retroactive Projects Seattle City Light will not write a contract for work that has already started or has been completed.

6 6 Incentive Levels Simple Rebates Specified per-unit funding amount 1.Wall-mounted occupancy sensors (except where required by code): $30 per sensor 2.Ceiling-mounted occupancy sensors (except where required by code): $90 per sensor Standard Incentives Funding levels and savings calculations are determined using standardized calculations presented on the program’s Funding Calculation Worksheets.

7 7 Contract Process 1. Funding Calculation Worksheets are completed by the contractor EMA reviews savings and funding calculations for accuracy and completeness 2. EMA performs “pre-inspection” site visit to ensure accuracy of existing equipment descriptions 3. Scope of work is finalized and detailed in the Funding Calculation Worksheets Scope then becomes part of the contract Contract includes the amount of funding provided, the project cost, kWh/year savings, and project specifications

8 8 Contract Process contd. 4. City Light mails two copies of the contract to customer for approval. Customer signs and mails back both copies to City Light By signing contract customer has secured funding for three years 5. Upon completion of the installation, the customer calls Seattle City Light to schedule an inspection. 6. Customer provides the documentation specified in the City Light contract, like invoices and Lamp and Ballast Disposal Form.

9 9 Contract Process contd. 7. On-site inspection is scheduled. 8. Payment is issued upon verification of contract compliance and review of required documentation. Customer receives check within 30 business days.

10 SCL Funding Workbook: Start and Setup Page

11 Application

12 Fixture Count Tab

13 Project Summary

14 Questions? Please call an Energy Advisor at Thank You