RICE-II Engineering & Deployment Kenneth Ratzlaff, John Ledford Instrumentation Design Lab The University of Kansas.

Slides:



Advertisements
Similar presentations
Levolors New Size-In-Store Blind Cutting Machine.
Advertisements

New Mexico FFA Agricultural Mechanics Career Development Event Electric Power.
Objective Define tools and materials used in agricultural engineering careers.
Motor number located on the clutch housing.
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Tool Classification.
Tools MVRT Season. Overview Design –Combination Square –Caliper Fabrication –Hacksaw –File –Drill –Sandpaper/Steel Wool –Shears Assembly –Allen.
TSI Nephelometer Zero Filter Assembly Zero filter valve Zero filter Zero filter motor Metal flange.
A-dec 300 Dual Mount on 500 Installation. Agenda ► General Information ► Recommended tools ► Installation ► Follow through install guide ► Hands-on install.
Module shoulders The purpose of this module is to arrange the shoulders in one and the same position, ready oriented to be put onto the mandrels. Shoulder.
Lucas Air Mass Meter Stripdown sequence and technical information.
MER/SUP 1 DOOR EVAPERATOR DRAIN PAN REPLACEMENT 1. Remove the (4) screws that secure the evaporator coil, using a 5/16” socket.
Volvo 270 Outdrive R&R (for bellows replacement)
LIGHT-DUTY BELT FASTENER SYSTEMS
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Tools English for Careers Class. tool belt A tool belt is used to hold tools on your body.
Electrical Wiring Circuit Board Project. STEP 1 - Identify all Parts of the Project Saw Drill Driver w/ bits Drill w/bits (not pictured) #2 Phillips Screwdriver.
Model 12 Intek Horizontal OHV
Stable Rise –Pull and Swivel Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Air tank installation instructions Included parts: Raw aluminum air tank bracket 5/16-18 button head bolts (qty 4) M8x1.25 button head bolts (qty 4) M8.
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
Cleaning of the Optical Block, Critical Orifice, and Focusing Nozzle of the Brechtel Model 1710 Mixing CPC.
Removal of Radiance Neph Disable the humidifier power remove water reservoir at top of neph disconnect power, computer and sensor cables disconnect and.
Universal Holding Cabinet Two screws hold each side; four screws secure the top.
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Electrician’s Tools Of The Trade Copyright © Texas Education Agency, All rights reserved.
Model 12 Intek Horizontal OHV Crankcase Disassembly and Assembly Lab #7.
994 RPDA 21/2”- 6”. Modification Overview  Production of the 994RPDA began in 1999 and is current.  The 994 RPDA currently utilizes the ¾” 009M3 for.
BASIC HAND TOOLS OPEN END WRENCH BOX END WRENCH.
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
SANUS SYSTEMS THE UNION OF FORM AND FUNCTION Sanus Systems 2221 Hwy 36 West. St. Paul, MN
NATEF Task Area A4 Suspension. Coil Springs and Strut Assemblies  This power point and the corresponding worksheet will help prepare you to remove and.
HYDROLOGIC FIELDWORK MANUAL STAGE GAGE INSTALLATION AND MAINTENANCE
Electrician’s Tools Of The Trade
The physical network Unit objective: Identify network cables and connectors, and use networking tools.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Installation. Indoor Unit Installation Typical Installation.
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
1. b. Rip Saw 2. d. Used for cutting with the grain.
Getting Ready Gather tools, oil and filter. If you plan to change your oil regularly, consider investing in jack stands, a socket set and an oil drain.
Framed Canopy Fitting Instructions Contents – 6- Angled frame fixing brackets 1 x handle pack 6 x self drilling tech screws 3 keys 1x door 6 x coach screws.
Section 2: Safety, Tools and Equipment, and Shop Practices
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
Installation of nephelometer Remove 4 screws from top round plate of instrument (will need a Phillips head screw driver) turn “neph” upside down (careful.
1 Direct burial cable, up to 24 individual fibers, reinforced.
+ The Four Stroke Cycle By Elizabeth Fahey. + Outline Time Required: 1-3 classes Grades: 9-12 Background: Lesson is in conjunction with the small engine.
Bolt Die Cutting threads on bolts and rods.. Bolt Die Stock Holder for bolt tie.
LAB #10. Governor Control Arm Using a 10mm socket install the two bolts that hold the governor control arm. Finger tighten then torque to 100 “#
P:\ISO \Work Instructions\Assembly\Options\ARMADILLO SWEEPER OPTIONS\10X ARMADILLO SWEEPER OPTIONS MODEL: KIT-MFG-ENG SHDN DSL M&FS SWA.
Tools you will need #8 Torx driver #10 Torx driver Standard Phillips screwdriver Small (jewelers)Phillips screwdriver Small standard screwdriver.
Model 12 Intek Horizontal OHV
LAB #2 CARBURETOR REMOVAL AND REPLACEMENT. Remove Cover Using a #10 star tip and a bit driver, remove the four screws to recoil cover.
Chapter 2 Tools, equipment and materials © Pearson Education Ltd Copying permitted for purchasing institution only. This material is not copyright.
Tool Identification. TURNING TOOLS Turn nuts, bolts, and screws.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Section 2 Safety, Tools and Equipment, Shop Practices Unit 6: Fasteners.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
Shaft Replacement Standard Operating Procedure
30’ Wireless Mast – Self Install
Automotive Engines Theory and Servicing
CAUTION GENERAL TOOLS REQUIRED ASSEMBLY AND INSTALLATION
Electrical Wiring Circuit Board Project
Plan for the installation of the TAMU screen
Ignition Systems Overview
T400 Motor Replacement.
CAUTION GENERAL TOOLS REQUIRED ASSEMBLY AND INSTALLATION
5000SS 21/2”- 6”.
Presentation transcript:

RICE-II Engineering & Deployment Kenneth Ratzlaff, John Ledford Instrumentation Design Lab The University of Kansas

RICE-II System Plan

Goals Wet Hole Goals (in cooperation with IceCube.) –Demonstrate effectiveness of ADSS cable and document possible failures –Install the Array Calibration Unit – an antenna to “ping” the RICE-I array and the future RICE-II array. Dry Hole Goals (separate from IceCube) –Demonstrate the effectiveness of using OF analog transmitters and receivers. –Test the Utility (Monitor, Test & Control) system in Antarctic conditions.

RICE-II Wet Hole Plan

ACU Control ACU control via SP ethernet to MAPO OR via DIP switches

Fiber Testing An OTDR trace has been recorded for each fiber. During re-freeze, OTDR traces will be collected periodically of all the fibers.

Dry Hole Plan

RICE-II Shipping Plan Removable screws marked in red. (Requires screw gun.) Two reels for wet holes, SRC1, SRC2. Reel + Pallet, 550 lb. each. Positioned with chocks; held down with aircraft cable and turnbuckle. SRC5 contains reel stand, shaft components, brake components, tape, carabineers, Allen keys.

Cable SRC1: two ADSS (All Dielectric Self-Supporting) cables and a shielded quad, taped as a bundle. One ADSS cable is terminated in a cluster housing with OF coiled inside. The second ADSS cable is terminated together with a shielded quad in a housing that will be replaced with a housing holding the ACU. SRC2: two ADSS cables terminated in cluster housings

Deployment Plan -- Mounting Reel may be brought to site by fork-lift on pallet (preferred) or via straps. Reel (~330 lb) is lifted from the pallet with straps through the holes.

Deployment Plan -- Shaft Stand can be carried by two people or lifted with carabineers through holes (if reel is mounted, lift by the reel.) Mount flanges to reel with lag bolts. Slip on bearings and lay in cradles (may be lifted by fork lift with straps or by 4 people with steel rods.) Secure bearing block with Allen wrench.

Deployment – Installing Stand The stand is to be positioned in place of one of the hose reels. The anchors for the hose reel will be used to anchor the stand via heavy-duty carabineers.

Prepare Cluster Housing Cluster housing must be removed from the wall (Phillips driver). One of the four housing bodies must be removed from the head and replaced with a body having an ACU module.

Deployment – Cable Prep The brake on the stand will be set to provide about 30 lb of drag – enough to ensure that if the pull stops abruptly, the cable will remain taut and the reel will not freewheel. The cable will be fed to an available sheave and taped down awaiting deployment into the hole.

Deployment Readiness The brake will be adjusted to keep the cable taut after cluster is taped and awaiting cable deployment.

Cable in Deployment With 200 m of IC cable remaining, braking is reduced and cable-bundle is taped to IC cable. After several tapings, the brake is increased to 150 lb.

Disconnect terminal end When the cable reaches the end, the lag bolts are removed from the clamp and the terminations are carefully removed from the tube. The remaining 30 m of cable then must be unreeled.

Top Termination End of cable co-deployed to IceTop trench.

Support -- IceCube Anchors for the reel stand. Direction where to tape cable on the tower while awaiting deployment. Stop at 200 m to bring RICE cable to the top of the hole and securely tape the cables together. Allow cables to be taped together every 10 meters. Hand tools: screwdriver, screw gun, socket wrench, etc. Make a quad in the IC surface cable available in the Surface Junction Box and the Counting House.

Support -- RPSC –Deliver pallets to the drill location. –Move cable with shaft installed onto the stand as necessary. –Provide a shelter for the post-deployment testing. >5C needed for the OTDR. –Ethernet backbone access for the ACU controller and computer in MAPO with fixed IP Numbers. –Compliance with routers or firewalls for Port 1234

Readiness Reel Stand (with bolts, carabineers, tape, Allen keys, etc.), cables shipped; in CA on 10/21/05. New Reel Stand braking system in progress. ACU circuit and controller circuit under construction. Programming partially complete The cluster housing for the ACU yet to be fabricated. Quad extension, from location of IC cable penetration of counting house to the ACU controller location, is ready to be built.

Instrumentation Design -- ACU

Instrumentation Design ACU Controller -1

Instrumentation Design ACU Controller -2