LIFE12 ENV/IT/000652 «CLEANSED» «Innovative integrated methodology for the use of decontaminated river sediments in plant nursing and road building» Start:

Slides:



Advertisements
Similar presentations
1° Transnational Workshop – Rome 3rd- 4th February PROJECT WEBSITE AND PROJECT GRAPHIC DESIGN 1.
Advertisements

Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 WP6 – Dissemination AIT ONB SR IMAC SUL TARX MUS MOT SPAC CC.
LIFE external communications team AEIDL 1 LIFE+ communication Presentation at LIFE+ Kick-off meeting.
Jointly for our common future SILVER CITY - SEE/D/0325/4.1/X Innovative urban strategies and action plans to increase the social and economic role of seniors.
1 Working meeting Warsaw, :00 – 13:00 – WORKING MEETING Progress of the project: activities, budget changes – LP-Part Project schedule & plan.
1 PODEBA Use of poultry dejection for the bating phase in the tanning cycle Alice Dall’Ara– ENEA Sergio Sangiorgi - ENEA 12/06/ month meeting Elda.
INGAS General Assembly, Oulu, 25&26 May 2011 INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu, 25&26 of May 2011 General Assembly Coordinator.
Innovative integrated methodology for the use of decontaminated river sediments in plant nursing and road building CleAnsed: LIFE12 ENV/IT/ Expected.
INNOVATIVE INTEGRATED METHODOLOGY FOR THE USE OF DECONTAMINATED RIVER SEDIMENTS IN ROAD CONSTRUCTION Progress Meeting November 26 th 2014 Prof. Ing. Massimo.
PROJECT LIFE12 ENV/IT/ “Anti-infective environmental friendly molecules against plant pathogenic bacteria for reducing Cu” “AFTER Cu” Start: 01/01/2014.
LIFE13 ENV/IT/461 EVERGREEN Environmentally friendly biomolecules from agricultural wastes as substitutes of pesticides for plant diseases control Start:
PROJECT LIFE12 ENV/IT/00036 “Anti-infective environmental friendly molecules against plant pathogenic bacteria for reducing Cu” “AFTER Cu” Start: 01/01/2014.
LIFE12 ENV/IT/356 «RESAFE» « Innovative fertilizer from urban waste, bio-char and farm residues as substitute of chemical fertilizers» 6 MONTH MEETING.
LIFE12 ENV/IT/356 «BIONAD» «Naturalised dyes replacing commercial colorants for environmentally friendly leather dyeing and water recycle» Start: 01/01/2014.
Elda – Alicante (Spain)
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
VITA- Virtual Learning for the Management of successful SMEs LEONARDO DA VINCI PROJECT – TRANSFER OF INNOVATION January 2009 – December PTI-LEO
MUSEC-EIE/06/024/SI SUPPORTED BY WP1 and WP6 State of implementation Breda September 2007.
LINKED Administrative & Finance overview18/03/2010 LINKED Leveraging Innovation for a Network of Knowledge on Education LIFE LONG LEARNING PROGRAMME LLP.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Welcome Juanma Ormazabal (entrepreneur) from Aceros Ormazabal company (steel)
Welcome 09.10Project update 09.30Final Report requirements & project review 11.00Coffee 11.30Final Evaluation Report review Lunch & photo
FORESTUR: “Tailored training for professionals in the rural tourist sector” ES/06/B/F/PP ACTIVITIES CARRIED OUT November 06 – May 07 Budapest, June.
LIFE12 ENV/IT/ «CLEANSED» «Innovative integrated methodology for the use of decontaminated river sediments in plant nursing and road building» Start:
PATCH-WORLd PArenTs and CHildren Working, ORganising and Learning together 23/24 October 2009 Sofia Final Conference This project has been funded with.
Progetto: LIFE11 ENV/IT/113 «BIOREM» «Innovative System for the Biochemical Restoration and Monitoring of Degraded Soils» Start: 01/01/2013 End: 31/03/2015.
Work Package 2 Communication & Dissemination Leader: TUC.
CULTURe EXchange Platform (CULTUR-EXP) Project Overview Prof. Ramaz Kvatadze Georgian Research and Educational Networking Association – GRENA
SARMa project development WP1 Project management and coordination SARMa internal handbook Alianta d.o.o., Ljubljana Split, 4-5 February 2010.
C-P LUS P ROJECT W ORLD - CLASS C LUSTERS IN C ENTRAL E UROPE Giulia Righetti, CNA Emilia Romagna Steering Committee meeting 17 th of April 2012 Prague,
TIPEIL LLP-LDV/TOI/07/IT/019 First Transnational Workshop Athens, 7-8 February 2008 Venue: IEKEP - 34A Averof str. in Nea Ionia 1 st floor DISSEMINATION/VALORISATION.
RECOMMEND 2nd Working summit Comp 2 „Communication & Dissemination“ Ingrid Rozhon 28th Nov 2012 Peterborough / UK.
LLP-LDV/TOI/07/IT/016. F-MU.S.EU.M. PROJECT: STATE OF THE ART AND INTERMEDIATE REPORT TO SUBMIT AT 15 DECEMBER Marco Merlini F-M U.S.EU.M. (Form Multimedia.
Work package 7 Dissemination and Concertation EuropeanaConnect Plenary Meeting Berlin, May 2010 Monika Segbert, Eremo srl.
Progetto: LIFE11 ENV/IT/109 «SOREME» «Low cost sorbent for reducing mercury emissions» Start: 01/01/2013 End: 31/12/ /01/ month progress meeting.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Slide n°1 LIFE09 Kick-off Meeting Other LIFE Stakeholders The Monitoring Team Roles & Responsibilities LIFE09 Kick-off Meeting, 13 January 2011, Warsaw.
Fred Verboon European School Heads Association O7: Dissemination.
LIFE13 ENV/IT/461 EVERGREEN Environmentally friendly biomolecules from agricultural wastes as substitutes of pesticides for plant diseases control Start:
LIFE13 ENV/IT/ ECODEFATTING Environmentally friendly natural products instead of chemical products in the degreasing phase of the tanning cycle Start:
1 LIFE+ communication Presentation at LIFE+ Kick-off meeting Warsaw, 13 January 2011.
Achievements Work Package 1 Achievements Work Package 6: Support the Commission with the overall coordination of the programme.
DESCRIPTION OF THE MONITORING AND EVALUATION SYSTEM IN POLAND Action Plan and the Two-year NRN Operational Plans.
LIFE12 ENV/IT/356 «RESAFE» « Innovative fertilizer from urban waste, bio-char and farm residues as substitute of chemical fertilizers» FINAL MEETING December,
This project has been funded with support from the European Commission. This publication reflects the views only of the author, and the Commission cannot.
LIFE12 ENV/IT/356 «BIONAD» «Naturalised dyes replacing commercial colorants for environmentally friendly leather dyeing and water recycle» Start: 01/01/2014.
LIFE12 ENV/IT/356 «BIONAD» «Naturalised dyes replacing commercial colorants for environmentally friendly leather dyeing and water recycle» Start: 01/01/2014.
VALORISATION OF INNOMET II FOLLOW-UP PROJECT JAANUS VAHESALU Tallinn City Enterprise Board Stockholm, February 3, 2006.
Business to Nature: Interregional Approach to SMEs and Entrepreneurship in Natural Areas 1 B2N PROJECT ANALYSES Magdalena Wątorska-Dec (LP)
LIFE12 ENV/IT/356 «BIONAD» «Naturalised dyes replacing commercial colorants for environmentally friendly leather dyeing and water recycle» Start: 01/01/2014.
Innovative integrated methodology for the use of decontaminated river sediments in plant nursing and road building Expected start date: 01/10/2013Expected.
LIFE14 ENV/IT/113 HORTISED "Demonstration of the suitability of dredged remediated sediments for safe and sustainable horticulture production" Progress.
LIFE14 CCM/IT/ FoResMit Recovery of degraded coniferous forests for environmental sustainability restoration and climate change mitigation Monitoring.
PROJECT LIFE12 ENV/IT/ “Anti-infective environmental friendly molecules against plant pathogenic bacteria for reducing Cu” “AFTER Cu” Start: 01/01/2014.
Co-Financed by European Regional Development Fund and made possible by the INTERREG IVC MITKE Overall progress 5th Steering Group Meeting Rzeszów, 30th.
Activity Report and Future Planning. European thematic work 2006 Main priorities: 1.Gather and analyze "good practice" and general information on operations.
EUROPE ADRIATIC SEA-WAY EA SEA-WAY 3 rd Cross Fertilization Workshop & 2 nd Cross Border Board June, Pula, Croatia Dubrovnik Neretva County, FB4.
LIFE12 ENV/IT/356 «BIONAD» «Naturalised dyes replacing commercial colorants for environmentally friendly leather dyeing and water recycle» Start: 01/01/2014.
LIFE12 ENV/IT/ «CLEANSED» «Innovative integrated methodology for the use of decontaminated river sediments in plant nursing and road building» Start:
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
Venue: WIIW, Vienna Loredana Marmora and Margaret Pesuit, ISIS
IONAS Final Project Meeting Venice, February 2nd/3rd 2007 Promotion and communication strategies and the exchange of experiences in IONAS Marta Moretti.
EQAVET Annual Network Meeting
Dissemination Plan made from EDUNET LEONARDO PARTNERSHIP PROJECT
WP8 Dissemination, Exploitation and Communication (DEC)
IENE Intercultural Education of Nurses in Europe
Erasmus+ KA2 project: Enhancement of study programs in Public Health Law, Health Management, Health Economics and Health Informatics in Montenegro Administration,
2nd Coordination Meeting 24-26th May, Greece
Communication Plan Decom Tools.
Presentation transcript:

LIFE12 ENV/IT/ «CLEANSED» «Innovative integrated methodology for the use of decontaminated river sediments in plant nursing and road building» Start: 01/10/2013 End: 31/03/ /04/ month progress meeting PISA NAVICELLI premises

AGENDA PROGRESS MEETING 09:30[NAVICELLI] Welcome and opening of the meeting 09:35[All] Actions carried out by each partner (please prepare a ppt presentation and include CLEANSED logo and LIFE logo in each slide) and scheduled activities till the end of March :00[All] Open discussion on actions carried out 11:15[All] Coffee break LIFE12 ENV/IT/ 652 «CLEANSED»

AGENDA PROGRESS MEETING 11:30[All] CLEANSED Technical future issues:  [ISECNR] Technical activities scheduled in the next six months of the project  [All] Open discussion on actions to be carried out in the next six months of the project. 12:00[ISECNR] Management and dissemination issues 12:50 [All] General questions 13:00End of progress meeting 13:00Tour of Navicelli premises 13:30Lunch LIFE12 ENV/IT/ 652 «CLEANSED»

AGENDA ADMINISTRATIVE MEETING 15:00[EC Monitor team] CLEANSED administrative issues:  [All] the EC monitoring expert will check all the project administrative documents (timesheets, invoices, etc.) with each partner LIFE12 ENV/IT/ 652 «CLEANSED»

Technical Actions carried out by each partner in the last six months  B.1: Dredging, analysis and characterization of contaminated sediments  B.2: Sediment treatment

Technical Actions carried out by each partner in the last six months Presentations of:  NAVI  ISECNR  CEBAS  DICI  UNIFI  IBIMET

Technical Actions carried out by each partner in the last six months [All] Open discussion on actions carried out

Dissemination activities carried out by each partner in the last six months  D1 Project website  D2 LIFE+ information boards (end M3)  D4 Diffusion material preparation  D5 Press and media releases  D6 Networking  D9 Demonstration workshop, seminars, conferences and other events  D10 Dissemination to Institutions and policy makers  D11 International fairs and other events  D12 Digital supports for international diffusion

Dissemination activities  ACTION D.1: Project web site ECOFATTING website in English and in Italian: CEBASCSIC is preparing the Spanish version Each beneficiary is implementing the link between the CLEANSED website to the beneficiary website

Dissemination activities  ACTION D.2: LIFE+ information boards ISECNR produced 12 CLEANSED Notice boards and sent them to all the beneficiaries All the beneficiaries put the CLEANSED Notice board in a public space All the beneficiaries sent the photos of the CLEANSED Notice board in a public space in each beneficiary premises

Dissemination activities  ACTION D.4: Diffusion material preparation 500 CLEANSED brochures 1,000 CLEANSED leaflets (two types) 1,000 CLEANSED plastic leaflets 1,000 CLEANSED copybooks 1 CLEANSED roll-up Decision of the project gadget

Dissemination activities  ACTION D.5: Press and media releases 4 articles related to the CNR event in local (La Nazione, Tirreno) and web newspaper article in Navicelli news

Dissemination activities  ACTION D.6: Networking Cluster with ECOFATTING,OXATAN, SHOELAW, PODEBA, SOREME, BioNaD, BIOREM, After-Cu, MICROTAN, C02SHOE, SHOEBAT, GREEN SITE, SOILPRO, RESAFE, SEKRET, EVERGREEN (LIFE projects) Specific meetings with photos with GREENSITE and After-Cu All the coordinators were invited to the CNR LIFE event at Pisa on 25 th March 2014 Some coordinators presented the projects at the CNR LIFE event at Pisa on 25 th March 2014

Dissemination activities  ACTION D.9: Demonstration workshop, seminars, conferences and other events ISECNR organised the LIFE CNR event in CNR premises on 25 March 2014

Dissemination activities  ACTION D.10: Dissemination to Institutions and policy makers Some beneficiaries started to have some contacts with Institutions and policy makers in order to organise specific meetings and events

Dissemination activities  ACTION D.11: International fairs and other events EFUF 2014: June 3 - 7, Lausanne, Switzerland REMIDA 28-29/11/2013 at Terni (Italy) SICA 17-20/02/2014 at Piacenza (Italy) ECOCITY fair in November 21-24, 2013 at Pisa ECOMONDO fair in November 5-8, 2013 at Rimini International Congress on Phytoremediation of Polluted Soils. Vigo, July 28 – 29, 2014 Request for EXPO2015

Dissemination activities  ACTION D.12: Digital supports for international diffusion Each beneficiary started to define the specific video of each beneficiary activity ISECNR started to have some contacts with some expert video companies in order to organise the general structure of the video ISECNR started to work on the video text

Management activities  ACTION E.1: Project management  ACTION E.2: Monitoring  ISECNR has continuous contact with all project partners for monitoring project activities  ISECNR prepares and sends a summary of the project activities carried out to monitoring team  ISECNR needs to receive from each partner technical inputs for the monitor summary

SOREME Technical future issues  ACTION B.3 Demonstration of the use of decontaminated sediments as a substrate for plant nursing  ACTION B.4 Demonstration of the use of decontaminated sediments in road construction  ACTION C.1 Monitoring and validation of treated sediments  ACTION C.2 Monitoring and validation of the use of decontaminated sediments for plant nursing  ACTION C.3 Monitoring and validation of the use of decontaminated sediments for road construction(start)

SOREME Technical future issues [All] Open discussion on actions to be carried out in the next six months of the project

SOREME Dissemination future issues for the next six months  D1 Project website: update  D2 LIFE+ information boards (end M3): OK  D4 Diffusion material preparation: more material (foreseen 24 Posters,12,000 leaflets/brochures/factsheets, 2,400 gadgets, 6 roll- ups, presentations, now 2,000 brochures/leaflets, presentation)  D5 Press and media releases: more articles (foreseen 30 articles, now 5)  D6 Networking: OK OK (foreseen 7 projects, now 16)  D9 Demonstration workshop, seminars, conferences and other events: organisation and participation in many more events (foreseen maximum dissemination, now 1 event)  D10 Dissemination to Institutions and policy makers: more contacts and event definition(foreseen successful communication)  D11 International fairs and other events: participation in many more events (foreseen maximum dissemination, now 5 events)  D12 Digital supports for international diffusion: start (foreseen project video)

ADMINISTRATIVE ISSUES  Next Deliverables  Partner costs March 2014  Inception Report  Next meeting

NEXT DELIVERABLES All the following Deliverables will be annexes of the Inception Report :  Website: Action D.1  LIFE+ notice board: Action D.2  Poster: Action D.4  Roll-up: Action D.4  Brochures and factsheet: Action D.4  Report on monitoring indicators: Actions E.2  Report on treatment: Action B.2  Sediment characterization reports: Action B.1  Stationery/gadgets: Action D.4  Technical specifications of sediment treatment: Action B.1  Visual documentation: Action B.2  Sediment samples: Action C.1  Executive design of demonstartion road: Action B.4  Photographic evidence: Action B.4  Sediment characterization reports (chemical, biological, nano, etc.): Action C.1

Partner costs March 2014 PARTNERCLAIM Personnel Personnel March 2014Travel Travel March 2014 External assistanc e External assistance March 2014 Consuma bles Consuma bles March 2014 Other costs Other costs March 2014 Overhead s Overheads March 2014TOTAL TOTAL March 2014 ISECNR 192,710 38, , , ,500 1, , ,955 2, ,07344, IBIMET 146,300 4, ,500 73,720 54, , ,2984, CEBAS 100,935 21, ,500 1, ,870 3, ,000 5, ,920 15,975 2, ,50634, NAVI 160,000 32, , ,240 57, , ,274 6, ,03496, DICI 124,550 8, , ,720 60,000 20, ,0919, UNIFI 70,020 15, ,400 5,400 48, ,157 1, ,55416, TOTAL 794, , ,800 2, ,920 61, ,000 7, , ,295 13, ,847,555205,638.16

Inception Report ISECNR will be responsible of the production of the Inception report which will be made up by:  Progress report with the summary of technical, administrative and dissemination project issues  Dissemination Annex  Deliverables  Output indicator tables The Inception Report will produce the CLEANSED GO/NO GO from the EC The Inception Report deadline is 30 June 2014 All the beneficiaries have to send the technical and administrative contribution to ISECNR

Inception Report Deadline  ISECNR will send to each partner a form for technical and dissemination contribution for the Inception Report no later than 15 th of May  Each partner has to send to ISECNR all the technical contribution no later than 10th of June 2014 (except some June activities)  Each partner has to send to ISECNR all the dissemination contribution no later than 10st of May 2014 (except some June activities)  Each partner responsible for a Deliverable has to send to ISECNR the Deliverable no later than 10th of June 2014  ISECNR will send to EC and Monitoring agency all the Inception Report documents no later than 30th of June 2014

Project meetings  1st Kick off meeting in ISECNR in Italy in October 2013  2nd Coordination meeting in NAVICELLI in Italy in April 2014 Next Project meeting  3rd Coordination meeting in UNIFI in Italy in October 2014