The TRICS Multi-Modal Survey Methodology KEVIN TRAVERS, HAMPSHIRE COUNTY COUNCIL.

Slides:



Advertisements
Similar presentations
Learning from Events 12th June 2013 The Tata Steel Approach
Advertisements

ISPM 6: Guidelines for Surveillance
Managing the Health and Safety of Contractors
Integrated Household Survey An overview and update Neil Bannister and Gareth Powell Social Survey Division ONS.
ALO Planning & Assurance Requirements
A2 Unit 4A Geography fieldwork investigation Candidates taking Unit 4A have, in section A, the opportunity to extend an area of the subject content into.
Kevin Travers, Hampshire County Council.  TRICS Launched in 1989  TRICS and TRAIDS merged in  GENERATE Group joined TRICS in 2007  TRICS and.
Basic Principles of Successful Grant Writing
Colin Buchanan A Mobility Management Plan for the National University of Ireland, Galway.
Service Agency Accreditation Recognizing Quality Educational Service Agencies Mike Bugenski
Overview of key changes to Ofsted inspection of Initial Teacher Training (ITT) from September 2012.
Ian Coles, TRICS Project Manager, JMP Consultants Limited.
Contractor Safety Management
Muscogee County School District Division of Academics (DOA) District Accreditation Module 4: Quality Assurance.
The SoCoMMS Model Paul Read Dan Jones. The Presentation Outline of the Study The Modelling Framework Accessibility Model.
National Commission for Academic Accreditation & Assessment Preparation for Developmental Reviews.
Quality evaluation and improvement for Internal Audit
Title I Needs Assessment and Program Evaluation
Fact-Finding Fact-Finding Overview
Joint Research Centre GLC2000 First Results Workshop Ispra 18 th to 22 nd March 2002 Project overview.
2015 ANNUAL USER SURVEY Nick Rabbets Managing Director – TRICS Consortium Limited.
CPA is a UKAS company The Assessment Process 2014 Seminars.
Assisting FE College Managements in Assessing Their ILT Development Status 22 May 2009 NCI Lecture Room 1.02.
Collection Level Description: The RASCAL Experience A Case Study Clare McVeigh RASCAL Project Manager 8 February 2002.
Computing Science CPD Presentation Internal Verification of National 4 and National 5 Units.
Analysis and Management of Risk: A Regulator’s Perspective Michael Ainley Head of Wholesale Banks Department UK Financial Services Authority.
Working in partnership with Crescent Purchasing Consortium Buying Temporary & Teaching Staff 5 th May 2010.
Kent and Medway Progression Federation (KMPF) An overview for partner schools.
Jane Hills14 March 2006 TRAVL User Group Conference TRAVL and the Coming Year.
Add presentation title to master slide | 1 New inspection methodology from September 2009 NATSPEC conference Lorna Fitzjohn May 2009.
Stage 3 Review: TFEIP/ETC-ACC Karin Kindbom, Martin Adams & Justin Goodwin.
JOINT STRATEGIC NEEDS ASSESSMENT Rebecca Cohen Policy Specialist, Chief Executive’s.
EFQM Excellence Model & Levels of Excellence Learning Edge - July 05.
Project Monitoring and Evaluation in the GMS 7-18 May 2012, Mekong Institute, Khon Kaen Project Monitoring and Evaluation for Road Construction in Lao.
INTERNATIONAL LABOUR ORGANIZATION Conditions of Work and Employment Programme (TRAVAIL) 2012 Module 13: Assessing Maternity Protection in practice Maternity.
Prof Max Munday The E4G Toolkit. What is an E4G project expected to do/collect in terms of visitor numbers and related information? When you need to deliver.
TRICS Performance and Usage Trends 2014/15 MIKE GREEN, SURREY COUNTY COUNCIL.
Nadine Peterson Preservation Planner NH Division of Historical Resources Lynne E. Monroe Preservation Company Christopher W. Closs Christopher W. Closs.
Stockport Key Centre Analysis 1 This PowerPoint presentation has been created to accompany GMTU Report 947 – GMATS Stockport Key Centre report Whereas.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Audit Planning Process
Higher Education Precinct Analysis 1 This PowerPoint presentation has been created to accompany GMTU Report 1055 – GMATS Higher Education Precinct report.
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
59 ½ Southwark Street London SE1 0AL (UK) ++44 (0) / Travel Plan Monitoring and Evaluation: London PIMMS-transfer.
Validated Self Evaluation of Alcohol and Drug Partnerships Evidencing Implementation: The Quality Principles – Care Inspectorate/The Scottish Government.
CREATIVE BRIEF. Creative Brief A document required in preparing for advertising, public relations, promotions, direct marketing, design and digital mediums.
Project management Topic 8 Quality Review. Overview of processes Prepare for Quality Review Questions list Meeting Agenda Review Meeting Sign-off Product.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Work Plan Development Section A 1.
Monitoring and Evaluation Systems: the KwaZulu-Natal Experience Khulani Mkhize Chief Executive Officer Ezemvelo KZN Wildlife.
Plan Waste Assessment MWM01A. What is the purpose of a waste assessment?  The main aims of a waste assessment are to:  Identify each waste stream on.
A research proposal is a document written for the purpose of obtaining funding for a research project.
Introduction to System Analysis and Design MADE BY: SIR NASEEM AHMED KHAN DOW VOCATIONAL & TECHNICAL TRAINING CENTRE.
CDM Construction Design and Management
© PeopleAdvantage 2013 All Rights Reserved We will Show You How to Easily Conduct Effective Performance Appraisals LCSA Conference 2013.
ACCA/PAB/ICAJ/ICAC Practice Monitoring Reviews OVERVIEW OF FINDINGS 19 July 2014.
Neighbourhood Planning in Haringey Myddleton Road Strategic Group 7 th November 2013.
Ad-Hoc TRICS SAM Surveys Dominic Smith, West Sussex County Council.
CPMGT 300 Week 3 Learning Team Planning Process Groups and Developing the Scope Check this A+ tutorial guideline at
Nick Rabbets Managing Director – TRICS Consortium Limited
Implementing the Guideline for individual learning
The TRICS Good Practice Guide Revised
AELP Dissemination of Chief Inspectors Report 29th November 2011
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 3. Session 8. Routine monitoring.
COMMISSIONED TRICS SURVEYS & THE TRICS BUREAU SERVICE – AN UPDATE
Mike Green Surrey County Council
Writing reports Wrea Mohammed
Leading Practice Implementation Guide
Leading Practice Implementation Guide
2.7 Annex 3 – Quality reports
Presentation transcript:

The TRICS Multi-Modal Survey Methodology KEVIN TRAVERS, HAMPSHIRE COUNTY COUNCIL

The TRICS Multi-Modal Survey Methodology  Background (TRICS data collection and SAM)  Methodology Overview (the process of survey preparation)  Undertaking a TRICS multi-modal site visit  Production of TRICS multi-modal survey specifications

Background  TRICS has been engaged in data collection since it was launched in  Multi-modal (people counts) surveys were introduced in  Annual data collection programme of both Level 1 (traffic) and Level 2 (multi-modal surveys) across 17 regions of the UK and Ireland.  Standardised Assessment Methodology (SAM) for monitoring travel plans introduced in  A detailed methodology document was introduced to assist organisations who wanted their surveys to be TRICS-compliant.

Methodology Overview o Procedures in the document should be followed to ensure TRICS compatibility. o Site visits should be undertaken with a number of checks and observations made, to establish the requirements for a multi-modal survey to take place. o Survey specifications follow site visits, and are more detailed instructions as to how the survey should be undertaken, on an enumerator by enumerator basis, along with site access point photos. o If the document is followed then surveys can be TRICS compliant, subject to data input and validation testing procedures.

Undertaking a Site Visit Prior to undertaking a multi-modal TRICS survey, a site visit, including its essential checks, is a fundamental requirement.

Site Visit Checks  1. Site boundary integrity.  2. On-site parking provision and use of site parking by non-site users.  3. Relevance and observation of off-site parking.  4. Local public transport provision.  5. Total number of access points.  6. Exclusion of through-trips.

Site Visit Checks  7. “Cross-over” trips from adjacent sites.  8. Exceptions for some “town centre” and “embedded” developments.  9. Avoidance of double-counting.  10. Type of survey required (Fully Observational, Part Observational, Full Interview).  11. Requirement of head counts.

Site Visit Checks  12. “Journey Purpose” counts form Employment SAM sites.  13. Additional surveys and count modes for Greater London sites.  14. Special survey conditions.  15. Total number of enumerator locations required at any one time.  16. Requirements of each enumerator location.  17. Site photographs.

Multi-Modal Survey Specifications A multi-modal survey specification uses the information gathered in a site visit to provide detailed instructions on how a TRICS survey is to be undertaken. It is essential that data collection companies fully understand the specification, and that is why it is written in clear and precise detail.

Survey Specifications: Overview A TRICS multi-modal survey specification should contain all of the following:  A clear summary of when the survey should be undertaken and the resources required for it.  Detailed instructions on exactly what counts and interviews are to take place, and by whom.  Photographs to assist the overall understanding of the site and its access points.

Components of a Survey Spec  1. Identification of the site and its location.  2. Identification of the TRICS land use classification  3. Day of the week and survey duration required.  4. Total number of access points for all modes and vehicles.  5. Total number of enumerators required at any one time.

Components of a Survey Spec  6. Type of survey required.  7. Identification of special survey conditions required.  8. Individual enumerator requirements.  9. Site photographs with descriptive headings.

Individual Enumerator Requirements These are the key things to consider when writing individual enumerator instructions. o Where should the enumerator be positioned? o What visual observations (counts) are to be undertaken by the enumerator? o What interviews are necessary to be undertaken by the enumerator? o Are there any special conditions that the enumerator needs to be aware of (and act on)?

TRICS Can Undertake YOUR Surveys  TRICS can manage the whole process of preparing for and undertaking a multi-modal survey at any development.  Contact a member of the TRICS team for a “ballpark” estimate quote.  TRICS would manage the site visit and survey specification process, providing a full quote for undertaking all of the work up to the point of the data being fully validated and the TRICS outputs supplied.  Our own TRICS-approved data collection contractors would be appointed to undertake the survey count to our specification.  Survey would be “TRICS Compliant” upon data validation being completed.