Front-end electronics for the LPTPC  System lay out  End-cap and panels  Mechanics for the front-end electronics  Connectors and cables  Front-end.

Slides:



Advertisements
Similar presentations
1 500cm 83cm 248cm TPC DETECTOR 88us 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 LATERAL.
Advertisements

Front-end electronics for the LPTPC Outline of the talk:  System lay out  Mechanics for the front-end electronics  End-cap and panels  Connectors and.
The large prototype TPC A status report
Front-end electronics for the LPTPC  Connectors  Cables  Alice readout electronics  New developments  New ideas  Open questions Leif Jönsson Phys.
TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
Electronics for large LAr TPC’s F. Pietropaolo (ICARUS Collaboration) CRYODET Workshop LNGS, March 2006.
SKIROC New generation readout chip for ECAL M. Bouchel, J. Fleury, C. de La Taille, G. Martin-Chassard, L. Raux, IN2P3/LAL Orsay J. Lecoq, G. Bohner S.
EXL/R3B Calorimeters- Readout from ASIC to DAQ Ian Lazarus STFC Daresbury Laboratory.
ESODAC Study for a new ESO Detector Array Controller.
A scalable DAQ system using the DRS4 sampling chip H.Friederich 1, G.Davatz 1, U.Hartmann 2, A.Howard 1, H.Meyer 1, D.Murer 1, S.Ritt 2, N.Schlumpf 2 1.
1 Luciano Musa CERN participation to EUDET for TPC electronics CERN, 31 August 2006 Outline Part I – Development of the readout electronics for the LPTPC.
Front-end electronics for Time Projection Chamber I.Konorov Outlook:  TPC requirements  TPC readout options  Options for TPC FE chips  Prototype TPC.
HEP2005, Lisboa July 05 Roberto Campagnolo - CERN 1 HEP2005 International Europhysics Conference on High Energy Physics ( Lisboa-Portugal,
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Development of novel R/O electronics for LAr detectors Max Hess Controller ADC Data Reduction Ethernet 10/100Mbit Host Detector typical block.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
Calorimeter upgrade meeting – CERN – October 5 th 2010 Analog FE ASIC: first prototype Upgrade of the front end electronics of the LHCb calorimeter E.
Various Topics Related to FEB Liang Han, Ge Jin University of Science and Technology of China Dec.21,2013.
14-5 January 2006 Luciano Musa / CERN – PH / ED General Purpose Charge Readout Chip Nikhef, 4-5 January 2006 Outline  Motivations and specifications 
Front-end electronics for the LPTPC  Connectors  Cables  Alice readout electronics  New developments  New ideas  Open questions Leif Jönsson Phys.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
The Readout Electronics for TPC with GEM readout chamber (and for almost any other readout chamber) Anders Oskarsson Lund Univ. Electronics: Bruxelles,
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Valerio Re, Massimo Manghisoni Università di Bergamo and INFN, Pavia, Italy Jim Hoff, Abderrezak Mekkaoui, Raymond Yarema Fermi National Accelerator Laboratory.
1 Luciano Musa, Gerd Trampitsch A General Purpose Charge Readout Chip for TPC Applications Munich, 19 October 2006 Luciano Musa Gerd Trampitsch.
EUDET Annual Meeting 2008, TPC Task K. Dehmelt 1 Status Report TPC Task Klaus Dehmelt DESY EUDET Annual Meeting Oct-2008.
L.Royer– Calice LLR – Feb Laurent Royer, J. Bonnard, S. Manen, P. Gay LPC Clermont-Ferrand R&D pole MicRhAu dedicated to High.
ASIC Activities for the PANDA GSI Peter Wieczorek.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
TPC electronics Status, Plans, Needs Marcus Larwill April
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
M. TWEPP071 MAPS read-out electronics for Vertex Detectors (ILC) A low power and low signal 4 bit 50 MS/s double sampling pipelined ADC M.
D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya, S. Mukhopadhyay Linear Collider Power Distribution & Pulsing Workshop.
1 Carleton/Montreal Electronics development J.-P Martin (Montreal) Shengli Liu & M. Dixit (Carleton) LC TPC Meeting DESY Hamburg, 4 June 2007.
Aurore Savoy-Navarro 1), Albert Comerma 2), E. Deumens 3), Thanh Hung Pham 1), Rachid Sefri 1) 1) LPNHE-Université Pierre et Marie Curie/IN2P3-CNRS, Fr.
Status report on the development of a TPC readout system based on the SALTRO-16 chip and some thoughts about the next step Leif Jönsson AIDA Meeting Vienna.
VMM Update Front End ASIC for the ATLAS Muon Upgrade V. Polychronakos BNL RD51 - V. Polychronakos, BNL10/15/131.
CBM 12 th Meeting, October 14-18, 2008, Dubna Present status of the first version of NIHAM TRD-FEE analogic CHIP Vasile Catanescu and Mihai Petrovici NIHAM.
Overview of TPC Front-end electronics I.Konorov Outline:  TPC prototype development  Readout scheme of the final TPC detector and further developments.
Specifications Asic description Constraints Interface with PDM board Planning Summary.
Development of the readout electronics in Lund for the ILD TPC Vincent Hedberg, Leif Jönsson, Anders Oskarsson, Björn Lundberg, Ulf Mjörnmark, Lennart.
FEE for TPC MPD__NICA JINR
A General Purpose Charge Readout Chip for TPC Applications
Calorimeter Mu2e Development electronics Front-end Review
The future readout system based on SALTRO16
SUMMARY OF THE ORSAY LD-TPC ELECTRONICS MEETING
KRB proposal (Read Board of Kyiv group)
DCH FEE 28 chs DCH prototype FEE &
A Readout Electronics System for GEM Detectors
Power pulsing of AFTER in magnetic field
Front-end electronic system for large area photomultipliers readout
A Low Power Readout ASIC for Time Projection Chambers in 65nm CMOS
ECAL Electronics Status
BESIII EMC electronics
RPC Front End Electronics
PID meeting Mechanical implementation Electronics architecture
RPC Electronics Overall system diagram Current status At detector
SALTRO16 activities in Lund
Presentation transcript:

Front-end electronics for the LPTPC  System lay out  End-cap and panels  Mechanics for the front-end electronics  Connectors and cables  Front-end card; modifications  Preamplifier (PCA16); specification and status  Control of the PCA16; FPGA/switches  ALTRO; status Leif Jönsson Phys. Dept., Lund Univ.

If we run TPC alone TPC local trigger TPC RCURCU back plane 25cm FEC Data in/out 200MB/s 2 fibres Distr box 40MHz clk lvl1 busy 2048ch,16 FEC close BUSyBUSy Trigger +event # TLU Main DAQ CLkCLk meters away clk busy Trigger +event # Other subsys daq If we run together with other subsystems ethernet

Mechanics for the front-end electronics Constraints:  The electronics crate has to be fixed to the field cage to avoid that cables are pulled out by accident  The short length of the cables means that the electronics will stick into the magnet  the TPC and the electronics have to move as one unit  The TPC should be rotatable by up to 90 o  the electronics must rotate together with the TPC Proposal:  Extend the rails on which the TPC rests in the magnet such that the TPC and the electronics can rest on the rails outside the magnet during assembly  Fix the electronics crate to the end flange of the field cage such that it moves and rotates on the rails as one unit

Mechanics for the front-end electronics Rails to be extended

End-plate and panels Endplate with panelsPanel with connectors

 The front end card is connected to the pad plane via kapton cables  100 cables have been produced  10 have been equipped with contacts  > 300 cables needed for channels  Will be ordered after tests Connectors and cables Connectors: SE Japan WR-40P-VF-N WR-40P-HF-HD-A1E WR-40S-VF-N Delivery middle-end of October FEC Pad plane

19 cm 17 cm ALICE TPC Front End Card Programmable charge amplification, digitization and signal preprocessing in the TPC end plate 128 channels

Preliminary layout of the modified FEC

19 cm 17 cm ALICE TPC Front End Card Programmable Charge Amplifier (PCA16)

 1.5 V supply; power consumption <8 mW/channel  16 channel charge amplifier + anti-aliasing filter  Single ended preamplifier  Fully differential output amplifier  Both signal polarities  Power down mode (wake-up time = 1 ms)  Programmable peaking time (30 – 120 ns)  Programmable gain in 4 steps (12 – 27 mV/fC)  Preamp_out mode  Tunable time constant of the preamplifier

Package/Pinout –94 Pins –16 Channels –6 mm 2 Silicon Area 16 Input Pins 32 Output Pins –9 Control Pins Decay_Preamp Polarity Shutdown Shaper1 Shaper2 Shaper3 Gain1 Gain2 Preamp_en Programmable Charge Amplifier (PCA16)

Status of PCA16 Production  200 of the 130 nm PCA16 chip were delivered from the foundry in the week 39.  They have been sent to the packing company and are expected to be returned in 4-5 weeks i.e. end October – middle November Tests  Verification of the design by manual tests at CERN  For tests of the larger quantity one might consider to use the robot in Lund, but then it has to be rebuilt and reprogrammed. The mechanical rebuild can be organised by Lund but we need someone to do the reprogramming.  Decision has to be taken and preparations have to start soon

Control of the PCA16 Option A (baseline): –Use existing serial interface on the board controler (BC) to set an octal DAC (digit to amplitude converter) and an 8-bit shift register (polarity, gain, shaping time,...) of the PCA16 –Reprogramming of the BC FPGA with help of CERN people –Connection FPGA – PCA16: Analog and Digital GND decoupled by capacities and by the DAC  Expect no noise on PCA16 inputs (to be tested) Option B (fall-back): –Jumpers/dip-switches on FEC (analogue) side  modification of cooling plate? Is a cooling plate needed at all? –To settle this issue we need to know the distance between FECs. The test can be done at CERN

Control of the PCA16

19 cm 17 cm ALICE TPC Front End Card FPGA Control PCA16

19 cm 17 cm ALICE TPC Front End Card ALTRO ADC

ALTRO Number of available 40 MHz ALTRO chips from ALICE (~2000 ch) 125 New production of 25 MHz ALTRO chips for other experiments:  Number of chips produced16489  Number of chips accepted by test (86%)  Number of chips not accepted by the test 2216 (14 %)  Number of chips ordered by other exp  Remaining accepted chips available for ILC-TPC 873  Out of the chips that failed the test it is expected that 33% may be recuperated 730  Total number available chips for ILC-TPC ~1600 This number corresponds to channels

 Milestone I (Q1 2007) - Programmable Charge Amplifier (prototype); 12 channel non-programmable charge amplifier produced and tested 16 channel programmable charge amplifier (PCA16) produced; 200 chips (Sept. 2007) Tests of PCA16 (Nov. – Dec. 2007)  Milestone II (Q2 2007) - 10-bit multi-rate ADC (prototype); 4-channel 10-bit 40-MHz ADC. The circuit can be operated as a 4-channel 40-MHz ADC or single-channel 160-MHz ADC. (?????) -Available: ~125 ALTRO chips 40 MHz ~1600 ALTRO chips 25 MHz - Modified circuit board (design) (Oct. 2007)  Milestone III (Q3 2007) - Operating DAQ-system (Test system operating Sept. 2007) - Production and bench-top tests of modified FEC. (Dec. 2007; provided minimum 8 PCA16 available in Lund) Summary; Project Milestones

Starting point: min pad size 1 x 4 mm 2 Requirements: highest possible flexibility in terms of pad geometry and shape of pad panels  Small modules (i.e. small connectors) Proposal: 32 channels modules, where each channel corresponds to an area of around 4 mm 2 - Japan Aviation Electronics offers a 40 pin connector with 0.5 mm pitch and the dimensions 13.9 x 4.7 mm 2. Thus, this connector allows additional 8 pins for grounding.

Example of signal routing from 1x4 mm 2 pads to the WR-40S connector

The general test concept (as presented at NIKHEF) The intention is to build a modular electronic read-out system which offers a flexibility to test various types of avalanche read-out techniques and pad geometries.  The read-out electronics should be dismountable from the pad board such that it can be easily moved from one panel to the next  The amplifier board should be directly attached to the pad board via a connector  The analogue and digital electronics should be mounted on separate cards connected by short ribbon cables  The DAQ system should be flexible, such that it can be duplicated and distributed to different users performing table-top experiment. Is this still valid???  Option to test different types of amplifiers (shaping, non-shaping....)

25 Front End Cards Readout and Control Backplane Readout & Control Backplane Readout Bus (BW = 200 MB /sec) VME-like protocol + syncrhonous block transfer Control Bus (BW = 3 Mbit / sec) I2C interface + interrupt feature point-to-point lines for remote power control of FECs

USB to FEC Interface Card (U2F) The U2F Card can read up to 16 FECs (2048 channels) U2F Card

SPI Card + ALICE TPC FEC Temporary during the development phase of the new preamplifier Signal Polarity Inverter (SPI) Card

Readout electronics for the Large Prototype TPC (LPTPC)  modular with well defined interface for various amplifcation technologies (GEM & µMegas) different module geometries  easy to use and with a modern DAQ system  Two strategies pursued in EUDET new TDC (Rostock) FADC-based (Lund, CERN)

Programmable Charge Amplifier  12- channel 4th order CSA  various architectures (classical folded cascode, novel rail-to-rail amplifier)  process: IBM CMOS 0.13  m  area: 3 mm 2  1.5 V single supply  Package: CQFP 144  MPR samples (40): Apr ‘06 Production Engineering Data ParameterRequirementSimulationMPR Samples Noise< 500e300e (10pF)270e (10pF) Conversion gain10mV / fC 9.5mV / fC Peaking time (standard)100ns Non linearity< 1%< 0.35%0.4% Crosstalk<0.3%0.4%< 0.3% Dynamic range> Power consumption< 20mW10mW / ch10mW / ch (30pF cl) OUTPUTS INPUTS single channel 7 standard channels5 versions

Programmable Charge Amplifier  The CQFP 144 package has the same pin- count and similar pin-out as the ALICE TPC PASA  In the near future the new chip will be tested on a ALICE TPC FEC Next Step Programmable Charge Amplifier (prototype) –16 channel charge amplifier + anti-aliasing filter –Programmable peaking time (20ns – 140ns) and gain

The mini-FEC new design Motivation: should be compatible with the available area such that it can be mounted directly onto the connectors at the plane  the number of equipped pads can be increased without getting space problems.

The mini-FEC new design (based on the ALTRO chip)

Connector arrangement

Dual mini-FEC (based on the ALTRO chip)

Mini-FEC based on commercial components  In telecommunication a completely new approach of handling signals has been developed (digitizing baseband + digital signal processing, DSP).  Recent development in density and complexity of FPGA’s (field programmable gate array) and lower prices.  Completely reprogrammable DSP in contrary to ASIC.  A new generation of multi-channel, high-speed and high resolution FADC’s with low noise and serial digital output has been developed, offered to a reasonable cost.

Pulse characteristics  For inclined tracks the pulse length is given by the difference in arrival time of the electrons emitted at the ends of the track segment covered by the length of a pad.  For tracks traversing the chamber parallel to the pad plane i.e perpendicular to the beam axis, the pulse length is determined by the longitudinal diffusion.  Pulses will be of different length Options:  Charge preamp,  rise ~40 ns,  decay ~2  s and shaper integrator ns 10 MHz sampling  Charge preamp,  rise ~40 ns,  decay 2 ~  s, no shaping, 25 MHz sampling Available: Charge preamp,  rise ns, shaping, 40 MHz sampling Dispute: The characteristics of the intrinsic GEM-pulse

 Milestone I (Q1 2007) - Programmable Charge Amplifier (prototype); 12 channel non-programmable charge amplifier produced and tested 16 channel programmable charge amplifier (PCA16) produced; 200 chips (Sept. 2007) Tests of PCA16 Nov. – Dec  Milestone II (Q2 2007) - 10-bit multi-rate ADC (prototype); 4-channel 10-bit 40-MHz ADC. The circuit can be operated as a 4-channel 40-MHz ADC or single-channel 160-MHz ADC. (?????) -Available: ~125 ALTRO chips 40 MHz 1600 ALTRO chips 25 MHz - Modified circuit board (design) (Oct. 2007)  Milestone III (Q3 2007) - Operating DAQ-system (Test system operating Sept. 2007) - Production and bench-top tests of modified FEC. (Dec. 2007) Summary; Project Milestones