PRE-formance™. 22  PRE-formance“Basic”  PRE-formance “Basic” Standard Pre-fabricated Assemblies  PRE-formance “Custom” Assembled to Order PreFab products.

Slides:



Advertisements
Similar presentations
Steel Outlet Boxes Crouse-Hinds Training Module. Outline z Applications z Types of Steel Boxes y Options z Uni-Mount TM Cover z Pre-Fabricated Boxes z.
Advertisements

Lightweight Forming System and Roofs for Concrete Floors.
Fischer Manufacturing is an electrical fabrication company based in New Brighton, MN. We specialize in building to engineering specified requirements.
Company Introduction. Contents Company Overview Company Profile Company Services Facility Visual View Company Structure Company Products CAD Tools Quality.
Logistics & Channel Management
 Meaning: Establishment of an industry at a particular place.  It refers to the choice of region and the selection of a particular site for setting.
Trimble GCSFlex for Excavators
American Iron Sports, LLC is a premier builder of innovative sporting equipment and training facilities for leading organizations in a variety of sports.
Objectives In the 1 st half of this Module we’re going to cover: The computerized estimating process. How a Contractor comes up with his Material Costs.
Process Selection.
Computer Integrated Manufacturing CIM
Location Strategy and Layout Strategy
Material Management. Materials should be ordered early –Minimize risk of price inflation, lack of materials –Just in time delivery minimizes space required.
Global Manufacturing and Materials Management
1 Facility Layout. 2 What Is Layout Planning Layout planning is determining the best physical arrangement of resources within a facility Two broad categories.
Layout Strategy. Introduction What – Layout Decisions Where – For efficiency or customer appeal Why – Improve Profitability.
Cloud Computing Economics Ville Volanen
Services and Capabilities We keep your customers maintained.
Welcome To The 1 st Choice Electrical Estimating System #1 in Estimating software Click To Start Click F5 to open the program then Start to run.
What type of house will you live in?
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Source One Network Solutions with Corporate Headquarters based in Fitchburg, Wisconsin specializes in providing multi- location clients, with nationwide.
Getting Green Building Automation. Why is Building Automation a Green Technology? There are programs starting all over the nation that focus on alternative.
CPS ® and CAP ® Examination Review OFFICE SYTEMS AND TECHNOLOGY, Fifth Edition By Schroeder and Graf ©2005 Pearson Education, Inc. Pearson Prentice Hall.
Leaders in Technology & Innovation ISO 9001:2000 & AS9100 Certified.
A Brief Overview Midwest COOLING TOWERS, INC. A Full Checklist of Products & Services for Your Cooling Tower Project Quality Service Integrity Value Quality.
Designing Goods and Services and Process Selection
INTRUSION ALARM TECHNOLOGY
Improving Safety through Efficiency in the Construction Industry – Is it a Fallacy? Presented by: Todd Hohn Brian Roberts.
Services and Capabilities We keep your customers maintained.
Chapter 6 Production Processes.
From Research Prototype to Production
Sales & margin.  Midwest Steel Fittings EMT, IMC, GRC couplings & Connectors. Ground Bushings, Liquidtight, Flex, Armored, Cord & Cable, Conduit Bodies,
Experts in Chem-Feed and Water Treatment Pre-Engineered Systems 1.
Ind – Acquire the foundational knowledge of channel management
Introduction to Materials Management
Manufacturing is the changing of raw or processed materials into usable products. Manufacturing occurs in manufacturing plants, or factories.
©2014 Honsa Ergonomic Technologies, Inc. Made in the USA.
ERP. What is ERP?  ERP stands for: Enterprise Resource Planning systems  This is what it does: attempts to integrate all data and processes of an organization.
© 2005 Right90, Inc. All rights reserved. Manufacturing 101 For Salesforce.com.
MANUFACTURING VOCATS 7.O5. MANUFACTURING is A system or group of systems used in the manufacturing process to make products for an end user.
SAFETY Laborers Suffering & Pain Amputation Loss of Life Wages Lost Supervisor Loss of prestige Loss of employee Loss of moral More supervision Management.
1 Air Conditioning Breaker Panels and Disconnects.
Speed-Mount™ Switch Boxes Crouse-Hinds Training Module.
The EnergyMizer Power Reduction & Conditioning System ®
Goods and Services NEXT. Section 1: American Production American systems of mass production have made it possible to produce goods more efficiently, which.
PROJECT MANAGEMENT Bedrock Learning, Inc Hemlock Drive Holland, MI USA Office: Facsimile:
SJDAdvisory Committee May Production & Maintenance Steven J. Durand May 2006.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
HOLT, RINEHART AND WINSTON1 CIVICS IN PRACTICE HOLT Chapter 18 Goods and Services Section 1:American Production American ProductionAmerican Production.
Production and Marketing Management Discuss the development, manufacturing, and marketing of products/services.
Designing for Manufacturability ELEC 422 Spring 2003.
CAD CAM. 2 and 3 Dimensional CAD: Using 2-dimensional CAD software, designers can create accurate, scaled drawings of parts and assemblies for designs.
A Global fully incorporated Virtual ecommerce Software Solution.
Tools and equipment are an essential part of many industries, providing the means for individuals to do their jobs accurately and proficiently across.
Definition: The physical positioning of processes, departments, equipment and work areas to optimize an organization’s effectiveness in achieving its operating.
Av-Tech Industries- Quality, Service and Precision Kitting
Chapter 7: Manufacturing Processes
POWERLINC A flexible, reconfigurable power distribution system designed specifically for control rooms. 1.
Process Layout Chapter #6.
Common Learning Blocks
Table of Contents Slug-Out Knock-out Driver Product introduction
AFCI Protection: AFCI Receptacles and the NEC
an initiative developed for a trend.
Building Competitive advantage through functional level strategies
ARCH 435 PROJECT MANAGEMENT
Building Competitive advantage through functional level strategies
Autodesk Building Systems 2007 Top 10 Features A Better Faster AutoCAD for Mechanical/Electrical/Plumbing engineering for buildings AMS | CAD Consulting.
Building Competitive Advantage Through Functional-Level Strategies
Presentation transcript:

PRE-formance™

22  PRE-formance“Basic”  PRE-formance “Basic” Standard Pre-fabricated Assemblies  PRE-formance “Custom” Assembled to Order PreFab products for both AC/MC & EMT applications  PRE-formance™ “Complete” A complete engineered solution – take offs & drawings, patented products, customized markings & shipping, each engineered and manufactured to job specific requirements

3  PRE-formance“Basic”  PRE-formance “Basic” Standard cataloged & inventoried CCHStandard cataloged & inventoried CCH boxes with pigtail & ground-screw. - e.g. TP404-PF - e.g.TP403-PF PF adder available with ANY CCH box by adding PF to part number.PF adder available with ANY CCH box by adding PF to part number. Stranded Fork Terminal Pigtails available by adding PFAStranded Fork Terminal Pigtails available by adding PFA Net Price adder for either PF or PFANet Price adder for either PF or PFA 3 PRE-formance™

44 PRE-formance“Basic” PRE-formance “Basic” Patented Uni-mount™cover combines plaster ring & mounting methodPatented Uni-mount™cover combines plaster ring & mounting method Available with the most popular drawn & welded boxes with ground screw and pigtail lead already installedAvailable with the most popular drawn & welded boxes with ground screw and pigtail lead already installed Available from stockAvailable from stock Less expensive & more secure alternative to traditional box mounting methodsLess expensive & more secure alternative to traditional box mounting methods PRE-formance™

55  PRE-formance“Custom”  PRE-formance “Custom” Cafeteria Style Selection of CCH’s extensive line of mounting brackets, boxes, plaster rings, wiring devices, Wago’s, and all associated branch wiring accessoriesCafeteria Style Selection of CCH’s extensive line of mounting brackets, boxes, plaster rings, wiring devices, Wago’s, and all associated branch wiring accessories Includes ground screw and stranded fork pigtail or solid pigtail installed into the boxIncludes ground screw and stranded fork pigtail or solid pigtail installed into the box Can be provided with devices, cable leads & fittings or connectors and/or plaster ring or wiring device protect plateCan be provided with devices, cable leads & fittings or connectors and/or plaster ring or wiring device protect plate Assembled from stock components to meet tight job requirementsAssembled from stock components to meet tight job requirements PRE-formance™

6 PRE-formance Custom Cataloged Items™ Most common assembly types with the Open Back Box cataloged and assembled from stocked components to meet tight project timelines! Telescoping Slider and Universal horizontal mount assembles Traditional Floor Mount and Universal floor mount assemblies Uni-mount™ and Direct Mount assemblies

7 PRE-formance Custom™ Telescoping Slider with GFCI and hospital grade whip With connectors Installed per customer specification Multiple box mount assemblies with 25FT 1 ¼” flex whips

88 PRE-Formance“Custom”  PRE-Formance “Custom” With Wago’s Special Packaging PRE-formance™

99  PRE-formance “Complete” The most complete turn key solution for commercial construction projectsThe most complete turn key solution for commercial construction projects Utilizing customers CAD drawings “complete” systems are engineered and manufactured to meet project specific requirements for ease of field installationsUtilizing customers CAD drawings “complete” systems are engineered and manufactured to meet project specific requirements for ease of field installations Material is engineered, manufactured and kitted to match your exact job and location requirements. We will give you what you need, when you need it, where you want it!Material is engineered, manufactured and kitted to match your exact job and location requirements. We will give you what you need, when you need it, where you want it! PRE-formance™

10  PRE-formance “Complete” Only Patented process including installation brackets & open back boxes that are designed with pre-fabrication, productivity & job site speed in mindOnly Patented process including installation brackets & open back boxes that are designed with pre-fabrication, productivity & job site speed in mind Innovative PRE-formance Products are designed by contractors for contractors to give you the ease of wiring & job site flexibility to get the job done right & on- time!Innovative PRE-formance Products are designed by contractors for contractors to give you the ease of wiring & job site flexibility to get the job done right & on- time! PRE-formance™

11 PRE-formance™

12 HomeRunner™  The HomeRunner junction/pull box is another innovative addition that will change the way contractors think about wiring their projects. –HomeRunner is an 8 x 8 junction/pull box with a patented external clamping system that gives contractors all the features they need to save time, labor and money at the job site! –Innovative, patented, labor-saving integral clamping system eliminates the need for contractors to punch holes in the enclosure and install fittings. –Suitable for use in high-rise hotels and in condominiums, where two large suites or condos can be fed from one HomeRunner box using a single large MC, MCI-A, or conduit home run. HomeRunner is truly an engineered solution! Contractors will appreciate its flexibility and its features.

13  PRE-formanceBenefits  PRE-formance Benefits Labor Savings & Associated ImpactLabor Savings & Associated Impact Material ConsiderationsMaterial Considerations Other (often overlooked) Considerations & AdvantagesOther (often overlooked) Considerations & Advantages PRE-formance™

14  PRE-formance Benefits Labor Savings & Impact Labor Savings & Impact BasicCustomComplete Direct Labor Savings 25% to 50% Savings versus stick built. Contractor can run leaner with less employees. Less time to install allows more time for other items. XXX Lower Skill Level Req'd Less skilled labor (lower cost) since layout & circuiting have been engineered and labeled X Re-Assignment of Skill Sets Pre-engineering allows installation with lower skill sets and experience. More experienced & skilled electricians can be reassigned to more complex systems such as distribution, special systems etc XXX Reduction of labor hours not accounted for during estimating process Published NECA labor units, and those included in many commercially available estimating programs, typically do not include costs for non-productive labor such as field planning and layout. Pre-engineering reduces that need. X X PRE-formance™

15  PRE-formance Benefits Material Considerations Material Considerations BasicCustomComplete Elimination of Spot Buying & Inefficient Buying Practices Pre-engineered system results in more accurate assessed needs, reducing bulk buys of commodities including boxes, fittings, brackets XXX Reduction In Cable & Wire Purchases Pre-engineering system result in more accurate planning & purchasing, reducing on site storage and risk of theft. XX Reduction of Scrap Pre-engineering eliminates costly wire cuts, and duplicate purchases of materials not readily accessible or “found” because of job site stock piles. Since Prefab comes to the project essentially a complete system the vast stockpiles of basic branch wiring components do not need to be ordered separately and handled again and again. XXX Elimination of Material Stock Piles Custom fabrication, kitting and marking ensures materials are delivered to the right spot on the job site. Eliminates inefficient, unproductive time spent by crews hunting down required pieces and parts. X PRE-formance™

16  PRE-formance™ Economic Advantages Cost for commodities (cable/wire) can be locked in well in advance of actual project delivery requirementsCost for commodities (cable/wire) can be locked in well in advance of actual project delivery requirements Prefab systems can be purchased and stored similar to lighting packages & distribution equipment which allows contractor to receive payment long before systems are ever installedPrefab systems can be purchased and stored similar to lighting packages & distribution equipment which allows contractor to receive payment long before systems are ever installed CCH design engineers can ID potential problems & conflicts long before field install is performed. CCH will issue RFI’s (on Pre-formance Complete) to resolve problems prior to fabrication of the system. This eases some of the burden on the contractor project managers and foreman allowing them to focus on other tasksCCH design engineers can ID potential problems & conflicts long before field install is performed. CCH will issue RFI’s (on Pre-formance Complete) to resolve problems prior to fabrication of the system. This eases some of the burden on the contractor project managers and foreman allowing them to focus on other tasks 16 PRE-formance™

17 PRE-formance™ Economic AdvantagesPRE-formance™ Economic Advantages Thorough and accurate engineering minimizes circuiting and related problems which reduce costly punch-list items and warranty callsThorough and accurate engineering minimizes circuiting and related problems which reduce costly punch-list items and warranty calls Higher productivity means that schedules can be more readily adhered toHigher productivity means that schedules can be more readily adhered to Single greatest advantage for the Electrical Sub to control the pace of the jobSingle greatest advantage for the Electrical Sub to control the pace of the job 17 PRE-formance™

18 PRE-formance™ Successes  PRE-formanceMarkets Served  PRE-formance Markets Served –Hotels/Motels –Assisted Living Centers & Medical Facilities –Educational Facilities –Condominiums –Military Installations 18

19 –New Comprehensive Catalog Pages –PowerPoint Presentation –Distributor Price Sheets –Samples! PRE-formance™ Selling Support Tools

20 PRE-formance™ Questions? Thank You!