Status of the digital readout electronics Mauro Raggi and F. Gonnella LNF Photon Veto WG CERN 13/12/2011.

Slides:



Advertisements
Similar presentations
LAV front-end board test Francesco Gonnella, Mauro Raggi Photo Veto Working Group 1 April Francesco Gonnella - Laboratori Nazionali di Frascati.
Advertisements

LAV trigger primitives Francesco Gonnella Photon-Veto Working Group CERN – 09/12/2014.
On the development of the final optical multiplexer board prototype for the TileCal experiment V. González Dep. of Electronic Engineering University of.
TEL62 firmware live kick-off meeting Mainz September 2011.
Status of the LAV electronics G. Corradi, C. Paglia, D. Tagnani F. Gonnella, M. Raggi INFN LNF F. Gonnella, M. Raggi INFN LNF Photon Veto WG CERN 13/12/2011.
LAV firmware status Francesco Gonnella Mauro Raggi 10 th October 2012 TDAQ Working Group Meeting.
LAV contribution to the NA62 trigger Mauro Raggi, LNF ONLINE WG CERN 9/2/2011.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
1 Project supervised by: Dr Michael Gandelsman Project performed by: Roman Paleria, Avi Yona 12/5/2003 Multi-channel Data Acquisition System Mid-Term Presentation.
LAV firmware status Francesco Gonnella Mauro Raggi 23 rd May 2012 TDAQ Working Group Meeting.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
Inter TEL62 communication M. Raggi, M. Piccini, F. Gonnella 16 th October 2013 TDAQ Working Group Meeting.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Local Trigger Unit (LTU) status T. Blažek, V. Černý, M. Kovaľ, R. Lietava Comenius University, Bratislava M. Krivda University of Birmingham 30/08/2012.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Control software M. Sozzi Pisa - January 30/31, 2014.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
Xiangming Sun1PXL Sensor and RDO review – 06/23/2010 STAR XIANGMING SUN LAWRENCE BERKELEY NATIONAL LAB Firmware and Software Architecture for PIXEL L.
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
TALK, LKr readout and the rest… R. Fantechi, G. Lamanna 15/12/2010.
Status of NA62 straw electronics Webs Covers Services Readout.
24/03/2010 TDAQ WG - CERN 1 LKr L0 trigger status report V. Bonaiuto, G. Carboni, L. Cesaroni, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti,
Overview, remarks, lamentations, hope and despair M. Sozzi TDAQ WG meeting CERN - 4 June 2013 Introduction, news and appetizer.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
NA62 straw tracker readout status Georgios Konstantinou
Update on CHANTI F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università degli Studi di Napoli «Federico.
TELL1 high rate Birmingham Karim Massri University of Birmingham CEDAR WG Meeting – CERN – 26/03/2012.
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
TEL62 status and plans Elena Pedreschi INFN-Pisa Thursday 08 September 2011 TDAQ WG Meeting at Mainz University.
Tools for NA62 firmware development Franco Spinella TEL62 Workshop Pisa January 30, 2014.
The FPGA based Trigger and Data Acquisition system for the CERN NA62 experiment Bruno Angelucci Physics Department University of Pisa INFN Pisa on behalf.
The Patti Board Gianluca Lamanna (INFNPisa) TEL62 workshop – Pisa –
TEL62 AND TDCB UPDATE JACOPO PINZINO ROBERTO PIANDANI CERN ON BEHALF OF PISA GROUP 14/10/2015.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
LAV firmware status Francesco Gonnella Mauro Raggi 28 th March 2012 TDAQ Working Group Meeting.
FW and HW Status TDAQ WG 10/6/2015. Hardware MPOD: ◦ HV was NOT floating   Sensibility of current limit to external devices  Particularly for chamber.
Mu2e NA62 TEL62 & TDCB repairs Radiation effects in TEL62 Franco Spinella 16/12/2015.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
TDAQ news and miscellaneous reports M. Sozzi NA62 TDAQ WG meeting CERN – 13/7/2011.
09/09/2010 TDAQ WG - Louvain 1 LKr L0 trigger status report V. Bonaiuto, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti, F. Sargeni, F. Scarfi’
TDAQ Working group meeting Mainz – 8/9/2011 Where do we stand? Where do we go?
TELL1 readout in RICH test: status report Gianluca Lamanna on behalf of TDAQ Pisa Group (B.Angelucci, C.Avanzini, G.Collazuol, S.Galeotti, G.L., G.Magazzu’,
TDC/TEL62 update M. Sozzi NA62 TDAQ WG meeting Bruxelles – 9/9/2010.
Many LAV stations in digital trigger Francesco Gonnella Photon-Veto Working Group CERN – 03/02/2015.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
X SuperB Workshop - SLAC Oct 06 to Oct 09, 2009 A.Cotta Ramusino, INFN Ferrara 1 SuperB IFR: outline of the IFR prototype electronics A.C.R
LAV electronics status report Mauro Raggi and Francesco Gonnella TDAQ meeting NA62 Collboration Meeting 1-5 September 2014 Ferrara.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
V.Duk, INFN Perugia1 CHOD/NHOD status Viacheslav Duk, INFN Perugia Ferrara,
MobiDick4 progress report Carlos Solans. Introduction MobiDICK is a complete test bench for super-drawers Will be used during the maintenance in the long.
Firmware and Software for the PPM DU S. Anvar, H. Le Provost, Y.Moudden, F. Louis, E.Zonca – CEA Saclay IRFU – Amsterdam/NIKHEF, 2011 March 30.
J.Maalmi, D.Breton – SuperB Workshop – Frascati – September 2010 Electronics for the two-bar test. D.Breton & J.Maalmi (LAL Orsay)
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
A. Salamon - TDAQ WG Pisa 27/03/ Lkr/L0 Trigger V. Bonaiuto, N. De Simone, L. Federici, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti,
Status of the ECL DAQ subsystems
Status of NA62 straw readout
LKr status R. Fantechi.
LAV front-end and readout status
Baby-Mind SiPM Front End Electronics
VME Pixel ROD Setup in UW Pixel Lab B050
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
TDCB status Jacopo Pinzino, Stefano Venditti
Presentation transcript:

Status of the digital readout electronics Mauro Raggi and F. Gonnella LNF Photon Veto WG CERN 13/12/2011

OUTLINE New lab, a new collaborator, a new paper! New lab, a new collaborator, a new paper! The wiener crate LAV FEE The wiener crate LAV FEE Basic tests of the crates Basic tests of the crates Reprogramming crate voltages Reprogramming crate voltages The status of the TELL1 readout system in Frascati The status of the TELL1 readout system in Frascati

New LAV electronic lab at LNF The lab is equipped with: A NIM and CAMAC crates A commercial VME 6U Daq system (based on HPTDC) A custom LAV FEE 9U crate + 1TELL1 and 2 TDCb V5 A LAV FEE 9U prototype board Proceedings of twepp available on ArXiv We have a new 2 year post doc collaborator: F. Gonnella

LAV readout chain Each LAV FEE boards Get 32 analog inputs and produce 64 LVDS outputs The output is sent to the TDC using 2 custom SCSI2  HDCI cables

The LAV 9U FEE board Operating voltage ±12V reduced to ±7.5V by onboard voltage regulators

Test of the NA62 FEE TEL62 crates

The LAV 9U crate With respect to standard TELL1 crates 46A of a voltage in the range 7-16 has been added. The current Wiener setting we have the voltage set to ±12V for the LAV line. Being the only user of the line we are free to change the value in the range 7-16V.

The TELL1 into LAV crate BUG Crate Power supply TELL1 J1 connectorTELL1 J1 TEL62 J1

Basics tests We performed very basic set of tests on the FEE TEL62 crates. 1)Mechanical test is ok 2)Electrical test of power supply is ok for both the TELL1 and FEE boards 3)Preliminary noise tests: 1)we checked that there is no noise transfer between TELL1 and the FEE A.Same level of noise in the FEE with or without TELL1 in the crate B.No additional noise when accessing the TELL1 using CCPC connection 2)We checked that the noise in the FEE depends on the crates power supply A.Increase the current load to the crate power supply B.Try a new test with V = ±7.5 V to increase the drop on linear regulators External power supply Wiener crate power supply 1,7  s 2mV 0.5  s 7mV

Hacking the LAV crate To save power the LAV FEE can be operated at ±7V instead of the ±12V just removing the regulators and reprogramming the LAV crate to provide ±7V. Reprogramming LAV crate by steps Construct dongle Connect to WINXP Pc with an RS232 port Enable rom access Download PC program UEP6000.exe Restart Crate Set new voltage and new defaults using wiener program Crate is protected against the use of non standard power supply voltage need to reprogram a ROM inside the crate

First LAV readout cell! Connection of LAV FEE to TDC just like it will be at the experiment! Doing the full readout is only adding more FEE and TDCb and routing cables Cable routing studied has to start to validate cable length before final production DAQ test is planned for January next year: Pulse 32 ch FEE inputs read them out with Tell1

TELL1 CCPC server installation A FC11 based pc has been setup as server for the TELL1 A FC11 based pc has been setup as server for the TELL1 Different from standard version with SL4 - SL5 Different from standard version with SL4 - SL5 Few problems with setup of the CCPC due to DHCP settings sitting in different directory in FC11 wrt scientific linux Few problems with setup of the CCPC due to DHCP settings sitting in different directory in FC11 wrt scientific linux The CCPC now boots successfully The CCPC now boots successfully The TDSPY program is running on the CCPC The TDSPY program is running on the CCPC TDSPY scripts currently interacting well with the TELL1 FPGA and TDCb: TDSPY scripts currently interacting well with the TELL1 FPGA and TDCb: FPGA status read and write are all OK FPGA status read and write are all OK TDCb Mezzanine on/off TDCb Mezzanine on/off TDCb tested successfully TDCb tested successfully Clock provided successfully with AGILENT 81110A Clock provided successfully with AGILENT 81110A Clock frequency used MHz Clock frequency used MHz

LAV firmware 2 persons involved in preparing a firmware for the LAV 2 persons involved in preparing a firmware for the LAV Mauro Raggi (LNF) Mauro Raggi (LNF) Francesco Gonnella (LNF, brand new postdoc) Francesco Gonnella (LNF, brand new postdoc) A computer (dual core, XEON 3.1GHz, 2Gbyte RAM) running WIN7 has been setup for firmware development A computer (dual core, XEON 3.1GHz, 2Gbyte RAM) running WIN7 has been setup for firmware development The last version of the TELL1 firmware has been setup, compiled, synthesized The last version of the TELL1 firmware has been setup, compiled, synthesized The firmware (.pof file) has been uploaded to the TELL1 using the ROM The firmware (.pof file) has been uploaded to the TELL1 using the ROM

Run under Windows seven Still to install SVN in local PC. Only works from LXPLUS Mentor Graphics HDL Designer All tools are installed: Altera Quartus II v. 11 Software installed

DDR control Data formatter and writer Data extraction Trigger handling Trigger primitive generator Core services & monitoring Inter-PP communication TDCb comm TDCb DDR II memory Prev PPNext PP From SL FPGA PP-FPGA firmware Data correction LAV specific

QDR control Data formatter and writer Gbit handling TTCrx & trigger handling Core services & monitoring AUX board communication PP0 PP1 PP2 PP3 QDR From TTCrx SL-FPGA Firmware Data merger Trigger primitive merger Trigger primitive handling To Gbit Eth Prev TEL62Next TEL62 LAV specific

Plans Try do run data acquisition with present tell1 firmware Try do run data acquisition with present tell1 firmware Still need some study of the daq software Still need some study of the daq software Start developing a stand alone version of the LAV firmware Start developing a stand alone version of the LAV firmware Start with the development of the data correction module Start with the development of the data correction module Produce an independent test bench with proper simulated inputs Produce an independent test bench with proper simulated inputs Decide in which FPGA we want to set the module Decide in which FPGA we want to set the module