RENO Electronics - QBEE - 장 지 승 ( 전남대학교 ) RENO Collaboration Meeting, 2008.10.10.

Slides:



Advertisements
Similar presentations
Test Setup for PHOBOS Hybrid/Module Testing at MIT Pradeep Sarin 31 July 98.
Advertisements

Trigger, DAQ, calibration Robert Sulej, październik 2007.
The Pierre-Auger PMT Test Stand Chris Jillings Feb 6, 2002.
MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
Overview of the current TDR system Introduction Electronics for instrumentation TDR core : Metronome, ADC, Merge Data Handling Pete Jones, University of.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
Calibration of the 10inch PMT for IceCube Experiment 03UM1106 Kazuhiro Fujimoto A thesis submitted in partial fulfillment of the requirements of the degree.
Feb 2006Jean-Sébastien Graulich PID Front End Electronics, Outlook after DAQ Workshop 02 Jean-Sebastien Graulich, Univ. Genève o Introduction o Tracker.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
DAQ for KEK beam test M.Yoshida (Osaka Univ.). Components VLPC readout –Stand Alone Sequencer (SASeq) Slow < 100Hz –Buffering VLPC data with VME interface.
Investigation for Readout Electronics of WAC in LHAASO Shubin Liu University of Science & Technology of China April 22nd, 2009.
Alfons Weber Towards Electronics for a Long Baseline Neutrino Detector Alfons Weber STFC & University of Oxford ν.
Sebastian Böser Acoustic test setup at south pole IceCube Collaboration Meeting, Berkeley, March 2005.
U niversity of S cience and T echnology of C hina Design for Distributed Scheme of WCDA Readout Electronics CAO Zhe University of Science and Technology.
Preliminary Design of Calorimeter Electronics Shudi Gu June 2002.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
The GANDALF Multi-Channel Time-to-Digital Converter (TDC)  GANDALF module  TDC concepts  TDC implementation in the FPGA  measurements.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
Detectors and read-out DetectorNo. of ch.Read-out method Device candidates CsI(Tl)768Flash ADCCOPPER + 65 MHz FADC FINESSE Active Polarimeter600 x 12 x.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
Online data format 2008 July 28. Event header Pedestal Hit data (Cable/T/Q) TRG info. Software Trig. info. Pedestal Event header Pedestal Hit data (Cable/T/Q)
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
06/09/2011TIPP Introduction Observational study of supernova explosion (SN) is important for understanding the mechanism of SN in detail. – Observation.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
The DRS2 Chip: A 4.5 GHz Waveform Digitizing Chip for the MEG Experiment Stefan Ritt Paul Scherrer Institute, Switzerland.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
PSROC, February 2, 2005 Sun Yat-San University Ching-Cheng Hsu National Taiwan University On behalf of NuTel Group Outline :  Overview of NuTel Experiment.
MoGURA New Backup Electronics for 11 C Tagging and MiniLAND Enomoto Sanshiro KamLAND Collaboration Bordeaux, Sep 2007 MoGURA Main Card.
7/28/2003DC/EC Review Aerogel Read out Electronics K. Ozawa, N. Kurihara, M. Inaba, H. Masui T. Sakaguchi, T. Matsumoto.
Design for Wide FOV Cherenkov telescope upgrading THE 2 nd WORKSHOP OF IHEP Shoushan Zhang Institute of High Energy Physics.
DOM MB Test Results at LBNL Main Board Readiness Status Review LBNL, July 2003 Azriel Goldschmidt.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Hardware Engineering Requirements Review June 5, 2002 LBNL David Nygren.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
CALO Meeting–September 2 nd 2015 Calorimeter Upgrade Electronics: June 2015 Test Beam E. Picatoste Universitat de Barcelona, Institut de Ciències del Cosmos.
A Brand new neutrino detector 「 SciBar 」 (2) Y. Takubo (Osaka) - Readout Electronics - Introduction Readout electronics Cosmic ray trigger modules Conclusion.
THE WaveDAQ SYSTEM FOR THE MEG II UPGRADE … read out by MIDAS Stefan Ritt, Paul Scherrer Institute, Switzerland 15 July 2015MIDAS Workshop, TRIUMF Paul.
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Development of new DAQ system at Super-Kamiokande for nearby supernova A.Orii T. Tomura, K. Okumura, M. Shiozawa, M. Nakahata, S. Nakayama, Y. Hayato for.
 13 Readout Electronics A First Look 28-Jan-2004.
Eric Hazen1 Ethernet Readout With: E. Kearns, J. Raaf, S.X. Wu, others... Eric Hazen Boston University.
The prototype string for the km3 scale Baikal neutrino telescope VLVnT April 2008 Vladimir Aynutdinov, INR RAS for the Baikal Collaboration for.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
Commissioning of the new electronics and
"North American" Electronics
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
Alternative FEE electronics for FIT.
Iwaki System Readout Board User’s Guide
Update of time measurement results with the USB WaveCatcher board & Electronics for the DIRC-like TOF prototype at SLAC D.Breton , L.Burmistov,
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
The WaveDAQ System for the MEG II Upgrade
Michael Lupberger Dorothea Pfeiffer
A First Look J. Pilcher 12-Mar-2004
Front-end electronic system for large area photomultipliers readout
Hellenic Open University
VELO readout On detector electronics Off detector electronics to DAQ
Status of n-XYTER read-out chain at GSI
BESIII EMC electronics
Stefan Ritt Paul Scherrer Institute, Switzerland
Development of hybrid photomultiplier for Hyper-Kamiokande
RPC Front End Electronics
MPPC for T2K Fine-Grained Detector
Presented by T. Suomijärvi
The Ohio State University USCMS EMU Meeting, FNAL, Oct. 29, 2004
Presentation transcript:

RENO Electronics - QBEE - 장 지 승 ( 전남대학교 ) RENO Collaboration Meeting,

Contents 1.QBEE 의 소개와 성능 2.DAQ 구성 - Master Clock 소개 - Online computer setup 3. 진행상황과 계획

QBEE - QTC Based Electronics with Ethernet - Super-Kamiokande 를 위해 동경대의 ICRR 에서 개발 개발목표 1.Stable DAQ system for next 10~20 years ATM (Analog Timing Module from KEK) was used for long time 2. Better data quality 1) Reflection signal and Temperature dependence A dead time for mu-decay detection (~us interval events) 2) Charge dynamic range and Energy resolution lower energy(~3MeV) solar neutrinos to multi-GeV or higher energy neutrinos 3. Recording every hit of PMT Anti-neutrino events for supernova relic neutrino search by detecting 200us delayed signal 4.High speed signal processing Nearby galactic supernova burst events Dead time free !! High sensitivity !! High speed !!

Overview of QBEE 12 PMTs ….…. ….…. 8QTC (Charge to Time converter) 4TDC (Time to Digital Converter) Power supply DC RJ45 Computer Master Clock 60MHz clock TDC reset TRG ID Event# 100Mbps Ethernet card FPGA

Hit timing Charge TDC (ATLAS Muon TDC) - Digitizes the each edge time FPGA (DSM, SIC etc) - Calculates the digitized hit timing and integrated charge QTC

Built-in Calibration pulser & Temperature sensor

Specification of QBEE based on IWATSU manual 1. The number of the ch. : 24ch 2. Charge dynamic range : pC (1250 p.e.), 3 gain range (Small ~51pC, Medium 51~357pC, Large 357~2500pC 3. Charge Linearity : +/- 1%

4. Charge resolution: ~0.1pC(.05p.e.), Timing resolution: ~0.15nsec 5. Temperature dependence (per degree) Gain variation : 0.4% Pedestal variation : less than 0.15pC Charge accuracy after pedestal subtraction : less than 0.15% Timing variation : less than 0.02nsec

6. Processing speed : 900ns/hit 7. Discriminator : 0 ~ -1.7mV, 0~3.4mV, mV 8. Noise level : Noise hit rate < -0.3mV DSC 9. Cross talk hit : less than 1/1000 between DSC PMTsignal -0.3mV

10. Reflection coefficient : less than 1/ inch PMT and 70m coaxial cable 11. FIFO memory size : 1.5MB 12. Power consumption (Maximum) +5.2V/1.6A, -5.4V/0.7A, +8/0.81A, -8V/0.3A, +15V/0.1A(DB) less than 24W

DAQ 구성 Master Clock Module TRG module Sync. Out Distributer RENO requirement – 18 QBEEs per 1 SuperK Computer Flat cable 60KHz Serial signal ( TRG ID & Event # etc. ) 60MHz clock TRG ID, event# QBEE output 100Mbps 100Mbps

MCLK output specification  Output via 100Mbps Ethernet cable (1,2) pair : 60 MHz clock (5,6) pair : TDC reset + Trigger ID + 32 bit event # (3,4) and (7,8) pairs : not used  Spec. of serial signal [ 1 bit = 1 clock, total 38 clocks = 633 nsec ] Header (always 1) Trigger on/off + TDC reset on/off Trigger w/o TDC reset(10) Trigger w/ TDC reset(11) TDC reset only (No Trigger)(01) Trigger (Narrow/Wide + Pedestal + Split) 32 bit event # 60 MHz clock Serial signal Start at a negative edge of the clock

KHz Serialized signal 633nsec 60MHz clock Example of Master Clock Output Header (always 1) Trigger on/off + TDC reset on/off Trigger (Narrow/Wide + Pedestal + Split) 32 bit event # Serial signal

Storage 100Mbps/QBEE x 18 LAN SWITCH SISCO SYSTEM Catalyst 2960G Series 1Gbps x 3 …… Computer Fujitsu PGR10317L-D QBEE 24 PMTs LAN SWITCH Computer. Merger Software trig. Computer VME- TRG Module collector sender Bit3 1Gbps(?) collector sorter sender Computer Data flow manager Computer Organizer Online computer setup with QBEE based on SuperK online system Master Clock Module Distributor Flat cable Sync. Out …… 18 output Each computer has 4 core  is Ethernet cable Front End Computer

24PMTs QBEE Fast Ethernet 18 QBEEs QBEE Sender Collector Sorter Front end computer 1.5MB/sec/QBEE 27MB/sec Merger Schematic view of data flow in front end computer based on SuperK online system  Software for this process was provided by Iwatsu and SuperK online group.

Storage 100Mbps/QBEE x 18 LAN SWITCH SISCO SYSTEM Catalyst 2960G Series 1Gbps x 3 …… Computer Fujitsu PGR10317L-D QBEE 24 PMTs LAN SWITCH Computer. Merger Software trig. Computer VME- TRG Module collector sender Bit3 1Gbps(?) collector sorter sender Computer Data flow manager Computer Organizer Online computer setup with QBEE Master Clock Module Distributor Flat cable Sync. Out …… 18 output Each computer has 4 core  is Ethernet cable Front End Computer

Data from the front-end PC Merger Combine the data from each FEPC by using the HW trigger number. The software trigger system HW trig. no Event no. The Merger system #of events

MCLK & Distributor Power Supply for TKO LAN switch 18 QBEEs in TKO FAN VME w/ TRG Electronics setup for 1 detector 6 PC 10 HV splitter FAN PMT HV supply NIM

개수구입처진행상황 QBEE50IWATSU 전량 서울대 도착 Ethernet card50Boston Univ. 5 개 -11 월 초 SuperK 에서 나머지 - 차후 보스톤에서 Master Clock4IWATSU 10 월 말 도착예정 TRG Module4IWATSU 10 월 말 도착예정 Distributer4IWATSU 10 월 말 도착예정 TKO crate6KEK REPIC ( 수리 ) 3 개 수리요청, 수리 후 도착예정 부족분은 KEK 에 문의중 TKO power supply 4KEK 전량 확보, 수리 문의중 Pulse Gen. FI/FO – 24ch. 11 월 중 QBEE test 시작을 목표로 하고 있음 진행상황과 계획