Christophe Delamare EDMS 13119912 Accelerator Consolidation Workshop 2013-09-12 GS/ASE activities.

Slides:



Advertisements
Similar presentations
Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
Advertisements

CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. W. Zeuner, W. Riegler, R. Lindner, B. Di Girolamo, G. Corti, C. Schaeffer,
BUILDING SECURITY ALARM SYSTEM. BUILDING SECURITY ALARM SYSTEM Any electrical or mechanical device which is designed or used for the detection of an unauthorized.
Tomasz Ladzinski GS/ASE. LASS Annual Maintenance & Tests General Principles Each winter shutdown preventive maintenance of EIS takes place. It is followed.
INFRASTRUCTURE SYSTEMS & RADIATION EFFECTS J.P. Saraiva (CERN R2E Project) October 14, 2014 R2E & Availability Workshop.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.
IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Maintenance Specificities in the CERN Cooling and Ventilation Group Asset and Maintenance Management Workshop CERN, November 2013 I. El Hardouz,
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
PLC NANO MANAGING SAFETY FUNCTIONS acting on electrical power for MEY/NA Experiments/Barracks.
Active Safety Systems + EHN1: Draft EN/EL proposal for replacement of Nano PLC 1.Current situation 2.Requirements definition 3.Current solutions (Atlas/CMS)
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
LHC Fire & Gas Detection Rui Nunes ST/AA/AS. Rui Nunes ST/AA/AS - STTC 21 Feb 2000 Project Goals Install in LHC –Fire Detection –Flammable Gas Detection.
GS Department: Main Activities Lluís Miralles GS Department.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson 17 September 2015.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
ATC/ABOC Days, 22 January 2007 The safety electrical networks at CERN Anne Funken, TS-EL.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
Functional/Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson EN/MEF 4 November 2015.
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
ATC/ABOC 23 January 2008Session 5 / MTTR & Spare parts 1 MTTR and Spare Parts in TS/ASE Rui NUNES TS-ASE.
INFRASTRUCTURE CHANGES AND UPGRADES Presented by: Fernando Baltasar dos Santos Pedrosa in the name of the four LHC experiments.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2.
YETS & LS2 Works EN-EL / Power distribution
SPS Personnel Protection System Renovation Project
Linac4-PSB 160 MeV connection readiness review
MEDICIS Safety Alarms Systems
CONS and HL-LHC day Analysis of needs from BE-CO
BE-ICS Activities during the LS2 Period (15 min)
CENF – Personnel Protection System Preliminary Study
Budget specification EHN1 Extension: Infrastructure (WG2)
BE-ICS activities for LIU Project
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
HL Consolidation Day Analysis of needs from BE-ICS
2016.
YETS & LS2 Works EN-EL / Power distribution
BE-ICS work for SPS Safety Systems
Experimental Areas – LS2 planning
North Area Safety Review 2019
North Area Safety Review 2019
Access Control for CERN Experimental Areas
ATS Consolidation Day 22nd May 2019 Beam Instrumentation
East Hall under construction
Presentation transcript:

Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities

Agenda Access Systems SPS Access LHC Public Address LHC Access Experimental Areas Access LHC and SPS Sites Protection Safety Systems Linear smoke detectors replacement SPS Beam Imminent Warning & Evacuation SPS Fire Detection PVC tubes replacement LHC Alarm Transmission Consolidation Items to be analyzed further 3EDMS Accelerator Consolidation Workshop GS/ASE activities

SPS Access Scope Replacement of the obsolete system For both access control and access safety functions Primary zones From risk assessment to installation & validation (+dismantling) 16 Access Points; > 200 doors Time scale From 2012 to LS2 Installation centered on the LS2 Risk assessment, specification (sectorisation), contract, test lab, etc. before LS2 Budget 14.5 MCHF, planned until 2018 Support from other groups BE: Controls, Operation, RF, Safety TE: Beam Transfer, Power Converters, Machine Protection, Vacuum EN: Electricity (cabling/fiber; AUG), Handling, Maintenance & Installation, Dumps, Ventilation GS: Access & Alarm systems, Fire brigade, Civil Engineering, AIS IT: Communication systems, Database FP: Procurement PHExperimental areas Safety: Radio Protection, General safety Risk if not done Reliability; Availability (spare parts) Nuclear Authorities 4EDMS Accelerator Consolidation Workshop GS/ASE activities

LHC Access Scope Readiness to perform the requested (and approved) evolutions of the LHC Access System for both access control and access safety functions Example: 16 evolutions in progress for the LS1 Use cases PZ65 Access Point Better integration with IMPACT & DMC dosimeters Time scale From 2015 to LS2 Budget 3.3 MCHF planned until 2018 Support from other groups Will depend on the requests EN/EL and EN/HE often heavily involved Risk if not done Safety Reliability; Availability 5EDMS Accelerator Consolidation Workshop GS/ASE activities

LHC Public Address Scope The PS project and the feedback from the people in the field show the LHC Public Address could be a plus To be compared with TETRA functions Time scale LS2 Budget Raw estimation 4MCHF; not approved Support from other groups EN/EL Risk if not done Usability «Safety» (public address is not a safety system) Nota: same question about the SPS 6EDMS Accelerator Consolidation Workshop GS/ASE activities

Experimental Areas Access Scope Several recent examples show the traditional border between Primary zones and Secondary zones is no longer sufficient in order to define the Access needs GIF++ High intensity Ion/Proton extraction to north area Access Control to EHN1 Access to galleries under EHN1 The Experimental Areas are more and more complex with a large set of risks (higher intensity radiation from beam, sources, laser, etc.) We would like to set up a real test platform which would be able to validate the future zones such as the ones in the North Area Time scale In principle, not linked to LS2; from 2014 to 2018 Budget Raw estimation 1.5MCHF; not approved Support from other groups limited Risk if not done Safety Usability 7EDMS Accelerator Consolidation Workshop GS/ASE activities

LHC and SPS Sites Protection Scope Review the Access Control of the surface buildings & Site entries Time scale 2015 to 2018 ? Budget No estimation yet Support from other groups EN/HE Risk if not done Usability due to obsolescence Thefts of critical material; Planning Reputation 8EDMS Accelerator Consolidation Workshop GS/ASE activities

Linear smoke detectors replacement Scope Linear smoke detection should be replaced by air sampling detection To ease the maintenance To improve the early detection In large Halls, SD, SDX. Time scale Budget kCHF; not approved Support from other groups EN/MEF Risk if not done Maintenance; Availability; Reliability EDMS Accelerator Consolidation Workshop GS/ASE activities

SPS BIW & Evacuation Scope The SPS access project implies major works on the SPS Beam Imminent Warning & Evacuation system This is the right time to replace the current obsolete system Time scale 2016 (centrals); LS2 (buttons & sirens); LS2 (cabling) Budget 1MCHF to 1.3MCHF; not approved Support from other groups EN/EL Risk if not done Maintenance; Availability; Reliability EDMS Accelerator Consolidation Workshop GS/ASE activities

SPS Fire Detection PVC tubes Scope Large part of the SPS Fire detection is made with air sampling network built with PVC tubes (20km) These aging tubes have to be replaced, especially because of the radiations Time scale Mainly during the LS2 Emergency interventions could be necessary before Budget 600 kCHF; not approved Support from other groups EN/MEF Risk if not done Availability; Reliability Impact on other equipment (remember TDC2 issue) Nota: a smaller PS network has to be replaced EDMS Accelerator Consolidation Workshop GS/ASE activities

LHC Alarm Transmission Scope The current alarm transmission between underground equipment (centrals) and surface (CSAM) is not made with fire- resistant cables We believe it could be appropriate in order to get a longer data transmission in case of major incident Time scale LS2 Budget 1 MCHF; not approved Support from other groups EN/EL Risk if not done Safety EDMS Accelerator Consolidation Workshop GS/ASE activities

To be analyzed further Future of SPS Sprinklers Site Information Panel (SIP) PS & SPS Future of the CTF zone Recent breakdowns of some MMD Multi-purpose Monitoring Device LHC Fire detection, gas detection, evacuation after LS2 EDMS Accelerator Consolidation Workshop GS/ASE activities