PIP Update Aug 15 th 2012. Agenda Summary Update – Current Activities Dennis Barak / Kiyomi Seiya - High-Power Ferrite Testing Ryan Crawford - Linac and.

Slides:



Advertisements
Similar presentations
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Advertisements

PIP Update Oct Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken Domann.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Fermilab New Tuner J. Reid M. Slabaugh August 6, 2014 J. Reid 1.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
PIP Update July Agenda Summary Update – Budget/RLS – Current Activities – Upcoming Activities/ Changes Update Slides High-Power Ferrite TestingDennis.
PIP Update June 26 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
PIP Update June 25 th Agenda Summary Update – Current Activities/Updates – Ryan Crawford: Anode Supply Update – Peter Prieto: BPM Update – CY Tan:
PIP Update Aug 22 th Agenda Summary Update – Current Activities Updates/Talks: – Elmie Peoples-Evans - Schedule Reports – Rene Padilla - Booster.
Proton Improvement Plan (FY13 PMG Q4). William Pellico, Fermilab PMG, Nov PIP FY13 Q4 Summary Task Highlights Budget and Labor Review Summary.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
Fermilab Booster Cavity Temperature Measurements – 15Hz Operation January 28, 2015 J. Reid 1.
PIP Update Aug 6 th Agenda Summary Update – Current Activities/Updates – New Tuner Test Result: Reid & Slabaugh – Anode Supplies: Crawford.
Proton Improvement Plan (FY12 PMG Q4). William Pellico, Fermilab PMG,October FY12 Summary Q4 Task(s) Summary – Highlights RFQ Injector Budget.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Proton Improvement Plan (FY13 PMG Q1). William Pellico, Fermilab PMG, January FY13 Summary Q1 Task Summary – Highlights RFQ Injector Budget.
All Experimenters Meeting PIP Report William Pellico on behalf of PIP team 4/7/2013.
PIP Update Feb 11 th Agenda Summary Update – Current Activities – Updates (Tom Kubicki) – Additional Meetings/Notes.
PIP Update Jan Agenda Summary Update – Current Activities – Updates (Ken, Pat and John) – Additional Meetings/Notes.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 11/04/2013.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
PIP Update June 3 rd Agenda Summary Update – Current Activities – Updates Ken Domann – Budget & Schedule Ryan Crawford – Anode Supply Update – Additional.
PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.
PIP PMG Project Controls Elmie Evans-Peoples PIP PMG Oct 25, 2012.
PIP Wednesday April 10 th, /4/12 Agenda Project Update(s) Pellico - PIP Status Talk(s) 1.None –(Review Status Report Effort)
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
PIP Update Sept. 18 th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Pat.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken.
PIP Update Oct Agenda Summary Update – Current Activities Updates/Talks: Dave Johnson – Linac Notching (laser)
PIP FY15 PMG W. Pellico PIP PMG March 5 th PIP FY15 Year to Date Outline –FY15 activities PIP quarterly milestones Linac Booster Project Controls.
Refurbished Booster RF John Reid October 24, 2012.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
PIP Update July 30 th Agenda Summary Update – Current Activities/Updates – Project Controls Update: K. Domann – Linac Lattice – Valeriy Kapin.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (V. Kapin: Booster Collimator) – Additional Meetings/Notes.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (Joe Compton - shutdown) – Additional Meetings/Notes.
PIP FY15 Q4 Report W. Pellico PIP PMG November 5 th 2015.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 07/01/2013.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Proton Improvement Plan Overview Bob Webber July 13, 2011.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Alexander Valishev - Simplified Modeling of Space Charge Losses in Booster.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
Proton Improvement Plan (FY13 PMG Q3). William Pellico, Fermilab PMG, Aug PIP FY13 Q3 Summary Task Highlights Budget and Labor Review Summary.
PIP Wednesday March 21, /21/12 Agenda Project Update(s) Pellico - PIP Status Talk(s) 1.Ryan Crawford: Linac Power Distribution - Shutdown 2012 activities.
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
PIP Update Aug. 21 st Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
Proton Improvement Plan (PIP) William Pellico Fermilab Annual Science and Technology Review September 5-7, 2012.
PIP Update April 3 rd Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
PIP Update Dec 17 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
PIP Update Jan. 16 th Agenda Summary Update – Current Activities/Updates – Shutdown ScheduleHighlights – Upcoming Talks, Reports, Meetings Updates/Talks:
PIP Update Oct 29 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
PIP Update August 12 th Agenda Summary Update Current Activities Update – Ryan Crawford - Booster Anode Power Supplies – Dave Johnson - Laser Notcher.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
PIP Update May 28 th Agenda Summary Update – Current Activities/Updates – Ken Domann.
PIP Update Sept Agenda Summary Update – Current Activities Updates/Talks: Ken Domann - Schedule Update and Statusing Ryan Crawford - Linac MCC/Transformer,
Booster High Power RF at PIP-II Era John Reid February 18, 2014.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Matt – Cavity Refurbishment) – Additional Meetings/Notes.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
Recent high-gradient testing results from the CLIC XBoxes
Presentation transcript:

PIP Update Aug 15 th 2012

Agenda Summary Update – Current Activities Dennis Barak / Kiyomi Seiya - High-Power Ferrite Testing Ryan Crawford - Linac and Booster Transformers Salah Chaurize/ Vladimir Sidorov- L13 Absorber

Update General Info Current Work – Booster RF cavity 5 – Tuners installed then removed due to spacing issues….. Aug 10 Log Entry – Linac Transformer – Slides – Booster Transformer – Could we order another one? – LCW – Work continues still on schedule? – RFQ – beam tests continue finishing up – meeting today to set schedule – REPORT for High Power – Preparing for submission/Meeting today to review – High Power Ferrite Testing - Progress - – Booster Absorber – Progress – see slides – Linac Modulator – Testing at 7 for DTI continuing – any comments – Modulator – SLAC / Continental will be here next week to present their plans – Booster Modulators – Aug. schedule says we should see half of Mods completed? – Cogging – working on hardware/frontend/code – Booster penetrations will be filled again soon – all cables pulled (SS) ? – RLS – Elmie Comments Shutdown - comments (Fernanda, Todd, Mary) PIP PMG August 2 nd – Went well – a lot of details – TOPICPresenterTimeDescription – Introduction/ManagementPellico20 MinutesHistory, goals and guidelines – LinacFernanda20 MinutesLinac (tasks, milestones/goals) – BoosterKeith20 MinutesBooster (tasks, milestones/ goals) – RLS/Project ControlsElmie15 MinutesRLS schedule – base line/update(s) – Budget ConstraintsBob15 MinutesBudget and targeted goals issu es

Upcoming Schedule/Events Linac HLRF meeting today to review JS report – Next Week will try to meet with management to present RFQ Injector looks to be ready – Meeting today to summarize recent studies – Approve Installation – Discuss near term plans Linac Modulator – Vendors visit next week to discuss their plans PIP Quarterly report over due – Turn in on Friday? Linac Transformer installation schedule completed

FY12 Budget (~84% of FY) Look at Task funds – make sure you as managers know what the balance is!! Ferrites Booster 2 nd Transformer Vacuum Components Klystron

Last week No bias current Resonant Frequency: MHz Forward power: 5.04 kW Reverse power: 729 W Cavity voltage: V (p-p) Q = 64.6 at ~5 kW No high loss effect observed John Reid, Kiyomi Seiya, and Dennis Barak

Plan of attack Try another Toshiba core (these are the lossiest cores that we have) Make high power measurements of the fixture without any cores inserted – Including Q Introduce a bias current and make high power measurements Try a new core? John Reid, Kiyomi Seiya, Dennis Barak

TOS 0979 core No bias current The high loss effect was not observed even with 6.57 kW of forward power. Q measurements – Q = 67.4 at about 5 kW (SG set to +7.1 dBm) – Q = 87.5 at lower power (SG set to 0 dBm) – Very similar to the other Toshiba core (TOS 9070) John Reid, Kiyomi Seiya, Dennis Barak

Measurements of unloaded structure Forward power: 4 kW Reverse power: 389 W Resonant frequency: MHz Cavity voltage: V Q measurements – Q = 669 (SG set to +7.1 dBm) – Q = (SG set to 0 dBm) – Q did not change too drastically compared to the loaded structure John Reid, Kiyomi Seiya, Dennis Barak

Try biasing the core Slowly increased the bias current while finding the resonant frequency with each change in bias current The high loss effect was observed with a bias current of 1500 A TOS 0979 core Forward power: kW Reverse power: 328 W Cavity pickup voltage: – 6.2 V before high loss effect – About 5 V after high loss effect John Reid, Kiyomi Seiya, Dennis Barak

High loss effect – cavity pickup John Reid, Kiyomi Seiya, Dennis Barak

Follow-on burst John Reid, Kiyomi Seiya, Dennis Barak

High loss at maximum bias current? Bias current: 10,000 A Forward power: 4.22 kW Reverse power: 243 W Cavity pickup voltage: V (p-p) SG setting: +9 dBm Q: 655 No high loss effect John Reid, Kiyomi Seiya, Dennis Barak

Next steps Compare these measurements to older data Place a stackpole core inside the structure and make the same measurements Try a new core Continue to characterize our measurements Possible issue: – The return bus bar was getting hot at 10,000 A. – The current was dropping by about 5 A every single pulse while components were warming up. Testing of new ferrites will start once we understand the results that we are getting John Reid, Kiyomi Seiya, Dennis Barak