Route 364 (Page Ave. Extension) The Missouri Department of Transportation.

Slides:



Advertisements
Similar presentations
Dulles Corridor Metrorail Project Status Update Fairfax County Transportation Advisory Commission November 16, 2010 Richard Stevens Fairfax County Department.
Advertisements

Third Avenue Skip-Stop Operations Now a Rainbow of Frequent, Efficient Service Owen Kehoe, PE, PTOE King County Metro Transit, Transportation Engineer.
14th Ave. S. at the South Park Bridge
Bicycle & Pedestrian Bridge Accommodations. On all recent MoDOT bridges on Missouri/Mississippi Rivers Dozens of Interstate and Interstate-equivalent.
Titusville to Edgewater Bike Loop PD&E Study
Border to Border Transportation Conference 2014 November 19, 2014.
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
Gilbert Road Light Rail Extension Transportation Project Advancement Agreement City Council Study Session December 4, 2014.
Center Grove High School Addition & Remodeling Schematic Design Phase Faculty Presentation August 27, 2008.
Dulles Corridor Metrorail Project 23-mile new Metrorail line branching off the Orange Line after East Falls Church 11 new stations 5 in Phase 1: East Falls.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
CHARLENE FITZGERALD APRIL 3, 2012 ROADS AND STREETS Yuma Metropolitan Planning Organization.
NTTA Expansion Program ASCE January Luncheon Meeting Delivering Mobility Gerry Carrigan Assistant Executive Director of Project Delivery North Texas Tollway.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
DRAFT 2009 Long Range Transportation Plan Highway Projects August 11, 2009.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
New Mississippi River Bridge EWGCOG Presentation New Mississippi River Bridge EWGCOG Presentation January 8, 2007.
North Metro Rail Line FasTracks Citizens Advisory Committee September 18, 2013.
The New I-64 Design-Build Project October Three Design-Build Contracts Legislative authorization in 2004 I-64, St. Louis –Awarded November 2006.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Route CC bridge replacement over Caulk’s Creek. What is the problem? Large debris consistently collects on the upstream end of the bridge. This causes.
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
Charlie Zelle, Commissioner Minnesota Department of Transportation February 18, 2014.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Current Construction Projects Major Projects Pinellas County.
BORDER-TO-BORDER TRANSPORTATION CONFERENCE 2007 POTENTIAL PUBLIC & PRIVATE PARTNERSHIPS.
Transit Service Detours during Confederation Line Construction Transit Commission December 9, 2013.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Councilmember Dave Richins Mesa, Arizona.  The Central Mesa Extension of the Light Rail is a 3.1 mile extension that will run from the Sycamore Station.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
Texas Transportation Commission October 25, 2012.
February 24, “Moving Transit Forward”  A fiscally responsible, community-driven vision for restoring, enhancing, and expanding the Metro Transit.
INTRODUCTION THIS IS AN EXHIBITION OF THE “CAMBORNE POOL REDRUTH TRANSPORT STRATEGY STAGE 1” PLANNING CONSENTS WERE GRANTED IN NOVEMBER 2008 AND JANUARY.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Project History and Background. Senate Bill Directed UDOT to Implement Traffic Traffic Signal Coordination Systems Established a Traffic Signal.
Southern Bridge Project Brown County Executive
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
La Grange Reservoir Turlock Lake Eastside Reservoir or Optional Canal West Satellite Reservoir Cattle Reservoir Turlock Lake South Pump Station Northwest.
The Missouri Department of Transportation 2007 Update.
Grand Canalscape Phase I and II General Update October 30, 2015.
San Diego Trolley. Current Current/future expansion Propose extension.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
c One North Pavilion Ave MLS # Listed $1,500, Riverside, Burlington County, N.J Acres Cellular Leases Excluded.
Los Angeles County Metropolitan Transportation Authority FY16 Budget Development: Preliminary Capital Program Board Staff Briefing February 12, 2015 The.
Transportation System Comments Santolina Level ‘A’ Master Plan.
FY 2006 MID-PHASE INPUT OPPPORTUNITY Regional Council April 26, 2006.
I-225 Rail Line Chuck Culig, Project Manager Tuesday, April 2, 2013 RTD Board of Directors Update.
1. 2 February Alliance Workshop St. Louis Regonal Freightway Alliance Needs Analysis and Freight Development Committee Terminal Rail Association.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
2014 Annual Program Evaluation (APE) Status Update April 1, 2014.
2015 Annual Program Evaluation (APE) Status Update July 14, 2015.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
City of Oceanside Melrose Drive Extension Public Scoping Meeting March 13, p.m.
Preliminary Estimated Cost
Stage 2 Light Rail Transit Program “In the ground ready”
City of Johnston East of Merle Hay Road Infrastructure Improvements
Jeffrey Keirn Illinois Department of Transportation
Highway 14 – Owatonna to Dodge Center District 6 Update
STREETS & STORMWATER DEPARTMENT
Southern Bridge Project Brown County Executive
Identification of Access Management Problem Corridors With
2014 Annual Program Evaluation (APE) Status Update
Harbour Island Force Main Replacement
North Augusta High School – Phase 2A and 2B
2020 RTP Update - Proposed Changes to Transit Projects
City of Edinburgh Council Transport & Environment Convener
Dakota County Regional Railroad Authority
Greater Pittsburgh Airport Area Property
Presentation transcript:

Route 364 (Page Ave. Extension) The Missouri Department of Transportation

Route 364 history Project started in 1997, opened in 2003 Phase 1 from Route 270 to Jung Station Road, St. Charles – Completed Phase 2 from Jung Station Road to Mid Rivers Mall Drive – In progress Phase 3 from Mid Rivers Mall Drive to Route 40 (near Route N) – Planned Regional Priority for East-West Gateway Council of Governments, St. Charles County

What’s going on now? Constructing Phase 2 between Jung Station Road and east of Jungermann Road: $19.7 million Crews have built new north and south outer roads (one-way) Built two-way bypass to construct Harvester Road bridge Bridge completed later this fall Originally scheduled to open winter-spring 2010

What’s going on now? Green = current construction

What’s on the horizon? Economic stimulus project completes Route 364 from Jungermann to west of Central School Road: about $44 million Work starts in October – completed by 2012 Crews will construct outer roads, then Route 364 Traffic flow may postpone reopening of Route 364 by Harvester Road

What’s on the horizon? Yellow = under contract

What’s in the future? MoDOT and St. Charles County are working on an agreement to finish Phase 2 between Central School Road and Mid Rivers Mall Drive. MoDOT is expecting to start preliminary bridge or outer road work near Mid Rivers Mall Drive in 2010 Currently, it will cost about $40 million to complete the rest of Phase 2.

What’s in the future? Light Green = proposed Red = Phase 3

Overall view of Phase 2 of Rte 364

What about Phase 3? Phase 3 runs between Mid Rivers Mall Drive and Route 40/Route N No money is available for Phase 3 yet Estimated costs to complete Phase 3: $140 million Legislature has authorized MoDOT to use design-build on Route 364 project – if used, must start design-build by 2013 May consider construction in two financially manageable segments – Mid Rivers to K, K to Route 40

What’s in the future?

Route 364 (Page Avenue Extension) The Missouri Department of Transportation