Presentation is loading. Please wait.

Presentation is loading. Please wait.

Jeffrey Keirn Illinois Department of Transportation

Similar presentations


Presentation on theme: "Jeffrey Keirn Illinois Department of Transportation"— Presentation transcript:

1 Jeffrey Keirn Illinois Department of Transportation
Deputy Director Region 5 Engineer District 8

2 District 8

3 Improvements in East St. Louis Area

4 Relocated IL Route 3 St. Clair Ave. to River Park Dr. Cost: $30 mil
85% Complete Anticipated Completion – Summer 2016

5 Relocated IL Route 3 St. Clair Ave. to River Park Dr.

6 Martin Luther King Connector Ramp
MLK EB to I-55/64 WB Cost: $27.7 mil 25% Complete Anticipated Completion – Fall 2017

7 Overall Plan of the Martin Luther King Connector Ramp

8 Access from New Mississippi River Bridge to IL Route 3 South

9 Poplar Street Bridge Improvements
Cost Estimate: $78 million Connection to Depressed Area Dual Lanes to I-55/44 WB Deck Rehab Future Dual Lanes to PSB Future 5th Lane on PSB (EB) Future EB Deck Rehab

10 Improvements in East St. Louis Area

11 Questions ???

12

13 Overall Relocated IL Route 3
North of Broadway Ave. in Venice to North of Monsanto Ave. in Sauget


Download ppt "Jeffrey Keirn Illinois Department of Transportation"

Similar presentations


Ads by Google