Tomasz Ladzinski GS/ASE. LASS Annual Maintenance & Tests General Principles Each winter shutdown preventive maintenance of EIS takes place. It is followed.

Slides:



Advertisements
Similar presentations
Tomasz Ladzinski GS/ASE Credits to S. Di Luca, F. Havart, F. Schmitt & G. Godineau.
Advertisements

Commissioning the access system M. Gruwé Machine checkout workshop November 8 th 2007.
SPS Access Project PL, EMP Chamonix XV, EDMS: SPS Access Safety System Patrick Lienard, Elena Manola-Poggioli on behalf of the SPS Access.
MEF - Machines & Experimental Facilities Technical Stop #4 29 th August - 2 nd September 2011 Summary Julie Coupard Schedule and Coordination LHC-TS4 -
Injection test? Mike Lamont For initial discussion.
Consolidation program SPS Main Power Converters (Dipole & Quadrupole) K. Kahle / Q. King / G. Le Godec (TE-EPC) IEFC Workshop, 9 March 2012.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Tomasz Ladzinski, Didier Vaxelaire. Current Access Configuration 18/06/2015T.Ladzinski GS/ASE2.
Status of the Roman Pot Movement System and the Interlocks Mario Deile
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
SPS RESTARTING AFTER LS1 05/03/2015 Stéphane Cettour Cavé.
LHC ACCESS SYSTEM 1 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Access Control and Safety System for the LHC Experiments P. Ninin L. Scibile.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
1 Safety and Database Subsection ADO - PO - SA Safety achievement and future activitiesSafety achievement and future activities Database (see K. Pommes.
LHC ACCESS SYSTEM 1 Authors: P, Ninin, L. Scibile T, Ladzinski EDMS: The LHC Access System Where do we stand ? P. Ninin, T. Ladzinski, L. Scibile,
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
Access system M. Gruwé (AB/OP) Thanks to TS/ASE group Extended LTC meeting March 3 rd 2008.
TS Workshop, Archamps 4 May 2004 SAFETY AND ACCESS CONTROL Where do we stand ? P. Ninin & the Access project team TS/CSE,
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
For more info:
GS activities during LS1 Christophe Delamare GS-ASE EDMS
Schedule IT General Schedule 9 th, September 09 Today.
Access System – LASS/LACS L. Ponce On behalf of the OP team.
LHC Machine Checkout & Dry Runs Strategy Acknowledgements: R.Alemany, R.Giachino M. Albert LHC Beam Operation Workshop June 2014.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Dry runs and cold checkout Markus Albert, Reyes Alemany, Rossano Giachino, Delphine Jacquet, Verena Kain, Belen Salvachua Ferrando, Matteo Solfaroli Camillocci.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
LHC ACCESS SYSTEM 1 EDMS: January 2008 Global Tests of the LHC Access system Outcome P. Ninin, T. Petterson, S Grau, T. Ladzinski 18 th January.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Access system global tests M. Gruwé LHCCWG January 15 th 2007.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
MPP Workshop Status of Powering Interlocks I. Romera on behalf of MPE-MS MPP Workshop, 12 June 2015, I. Romera (TE-MPE)1.
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Access Safety Systems Modifications & tests in 2006 Presented by Rui Nunes TS-CSE-AAS.
HiRadMat status report Adrian Fabich HiRadMat EAM, 4. March 2016 EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
Access system LHC-SPS M. Gruwé and J. Ridewood OP days March 18 th 2008.
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
Access system and radiation monitors session (session 5) Topics and subjects discussed Main issues Magali Gruwé and Tomasz Ladzinski 5 th February 2010.
Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2.
(Access system for HWC)
SPS Personnel Protection System Renovation Project
Beam Interlock System SPS CIBU Connection Review
BE-ICS Activities during the LS2 Period (15 min)
CENF – Personnel Protection System Preliminary Study
CENF – Personnel Protection System Preliminary Study
AD consolidation activities in LS2
Helium spill in LHC tunnel
B.Todd, M. Zerlauth, I. Romera, A. Castaneda
LAAWG Status Report – 15th May 2007
LV Safe Powering from UPS to Clients
J. Uythoven for the MPE-MI & MS Teams
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
Commissioning and Testing the LHC Beam Interlock System
Monday 11/07: Recovery Plenty of accesses.
Powering and Safety day Underground access during powering tests
Presentation transcript:

Tomasz Ladzinski GS/ASE

LASS Annual Maintenance & Tests General Principles Each winter shutdown preventive maintenance of EIS takes place. It is followed by an annual proof test of the correct acquisition/distribution of all I/O signals from/to EIS-access - normative requirement to detect latent errors DSO Test is the final stage of the access safety system validation before the beam permit is signed. No more interventions in the LASS racks until the next shutdown. Organisational Constraints In the LHC during winter shutdowns the DSO Test is the only moment when the full sensor-logic-actuator chain can be tested. During the DSO Tests all EIS-beam/machine are tested, but only a representative sample of EIS-access is used. On average around 15 intrusions are triggered in 1 day. 22/05/ Sector Test Meeting T.Ladzinski GS/ASE - edms:

Overview of major LS1 Modifications 22/05/ Sector Test Meeting T.Ladzinski GS/ASE - edms: Task NameWhereDescriptionECR Sectorisation Changes TI2Displacement of Door PPG2145 separating the LHC and the SPS in TI2 tunnel LHC1Displacement of PADs from UJ14/16 to UL14/ LHC4Displacement of PAD UX USC55Creation End-of-Zone Door for Material Transfer Between USC55 and the Bypass Interlocking PM32PM/TZ32Creation of an Interlocked Service Zone PM Access Point Maintenance Doors LHCLACS/LASS Top of the Pit Maintenance Doors New Radiation VetoLHC2,6,8New Radiation Vetoes for the Injection Lines and Beam Dump Transfer Galleries Monitoring of Helium Conf. Doors in LASS TI2/TI8Interlocking of Injection Tunnel Upstream Areas with LHC Powering LHCMonitoring of pressure resistant doors in LASS Access – Powering Interlock CCR, LHCChange of the Interlocking of Powering and Access systems Monitoring of Doors Important for Control of Activated Air US32/US76Add the following ventilation doors to LASS: YCPV01=US32, YCPV01=US UP53Add the following ventilation door to LASS: YCPV01=UP53 LHC2,4,6,8Monitor the ventilation doors between Service and Tunnel areas in even points Point 7 CollimationLHC7LHC Point-7 Collimator Region Enclosure and Ventilation Bypass Upgrade of LASS IT Infrastructure CCC/CCRExchange of LASS servers and client computers, upgrade of Siemens PCS7 LACSCCCNew tool for video, TIM views replace Evolynx LASS ones, upgrade from XP

LS1 Testing Strategy For the non-modified parts of the system, the general testing strategy is the same as for a standard winter shutdown. New safety functions, new EIS etc. require systematic sensor-logic-actuator tests, as was the case in Validating the modifications related to securing the Powering Phase II (major modification that needs to be operational in August 2014): 1. All software tested in the lab prior to deployment 2. Sensor-Logic chain tested on site (annual proof test) 3. 5 days allocated to the test of the safety functions Conducting this series of tests will made yet another round of EIS-a position signal acquisition tests. 22/05/ Sector Test Meeting T.Ladzinski GS/ASE - edms:

Access Powering Interlock Test Objective In access mode verify that: 1. a sign of human presence as detected by EIS-access (patrol lost, door opened, restricted key taken); 2. opening of a pressure resistant door; sends a signal to the PIC controller. Schedule 22/05/ Sector Test Meeting T.Ladzinski GS/ASE - edms: Friday 6 June LHC8-LHC1-TI8 (ECX4,TAG42) powering of sector 8-1 Friday 13 June LHC6-LHC7-LHC8 powering of sectors 6-7 & 7-8 Friday 20 June LHC1/1.8-LHC2-TI2 (SPS also) powering of sector 1-2 Friday 4 July LHC2-LHC3-LHC4 powering of sectors 2-3 & 3-4 Friday 25 July LHC4-LHC5-LHC6 powering of sectors 4-5 & 5-6 Access only for GS/ASE to Tunnel and Service Zones Will be patrolled the evening before – restricted mode! Partial DSO Tests

Testing Remaining New Functionalities Local access constraints: Functional Test of Collimation Region Doors in LHC7 (needs nominal ventilation) Functional Test of new interlocked access zone PM32 Functional Tests LHC4 Tunnel - Electron Stoppers ‘out-of-chain’ enhancements Apply/remove new Radiation Vetoes in Injection and Beam Dump Tunnels LHC-wide access constraints (NO ACCESS / BEAM mode): Intrusion in beam mode for all EIS-access that have been moved or introduced (UL14/16 AP; UX451 AP+ EoZ door; Ventilation doors in US32, US76, UP53; EoZ doors USC55, UJ561, TI2) Maintenance Door Tests Interlocked barrier at the maintenance door level PLC and Cabled Loop (including the staircase doors) Check the functionality of the door Simulate access point maintenance in Beam mode SPS Shutdown Key (additional constraint – SPS Chain 1 interlocked) Connection/disconnection of LHC BIW – exhaustive tests of ‘interlock barrier degradation’ (access blocked & BIW sirens) SPS Magnet Patrol signal acquisition by LASS Latch of the cabled loop 22/05/ Sector Test Meeting T.Ladzinski GS/ASE - edms:

LASS Modification Cycle – Full V&V 22/05/ Sector Test Meeting T.Ladzinski GS/ASE - edms: June-July, LHC Access Blocked 2-3/8 EIS-access put back in chain EIS-beam/machine in chain in September Weekend 4-5 Oct., LHC Access Blocked EIS-beam/machine in chain Weekend 4-5 Oct, LHC Access Blocked LASS in nominal configuration Weekend Oct, LHC Access Blocked LASS in nominal configuration

Conclusions Many access modifications during LS1 – implementation well on track. Powering-Interlock Tests in June-July to: 1. validate the correct functioning of the access-powering interlock 2. validate the patrol and EIS-access position signals DSO Test dates requested in March: Weekend 4/5 October Weekend 11/12 October - backup Both dates should in principle be free in the schedule and after analysis of the validation needs the plan is to use them as follows: Weekend 4/5 October – Beam Mode Tests by GS/ASE (exhaustive test for new equipment/functions) Weekend 11/12 October – the DSO Test (sampling) 22/05/ Sector Test Meeting T.Ladzinski GS/ASE - edms: