Mounting arrangement for the Solid Absorber. This contains mounting arrangement for:- 1. Handling and lifting from manufacturer’s place to RAL; 2. For.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Cap Sewing with HCS-1201 Voyager
Front Suspension Dismantling
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
MER/SUP 1 DOOR EVAPERATOR DRAIN PAN REPLACEMENT 1. Remove the (4) screws that secure the evaporator coil, using a 5/16” socket.
You will be making a few new parts and re- drilling a few holes to size. READ ON,,,,, 3/8” bolt Brass bushingNylon bushing 2 reinforcement plates 2 Delrin.
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
TOUGHENED GLASS FIBER REINFORCED BODY TOUGHENED GLASS FIBER REINFORCED BODY ONE PIECE BODY FOR OPTIMUM INTEGRITY ONE PIECE BODY FOR OPTIMUM INTEGRITY STANDARD.
1 Grating Mount Requirements Weight:< 75 Lbs including grating (43.1 Lbs) Size:Fit within structural envelope. 1.5” for cell behind grating. Alignment:Adjust.
Steering Columns.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
A simple clamping device for the Solid absorber Wing Lau, Oxford.
Agreement on scope of supply and extent of interface among different suppliers of the AFC module This talk covers the scope of supply on the Absorber Focus.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
MICE Collaboration meeting at LBNL: 9 ~13 th Feb, 2005 Force reaction analysis Stephanie Yang Feb 10 th, 2005.
MTF SLIT COMPONENTS Adjusting Blocks and Mounting Plate Steel Blocks
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
Summary of the change request from KEK KEK suggested 4 changes to be made on the AFC. We have looked into the request carefully and discussed the implications.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
Chapter 11 Flange splice.
Old Main Members: KaLee Allen Mike Berry Jen Dronetti Greg Hofmann Charlie Miracola.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Lab Equipment. Beaker Beakers hold solids or liquids that will not release gases when reacted or are unlikely to splatter if stirred or heated. Does not.
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
Lesson No. 07 Week No. 04 Lesson Name Hacksaw Frame & Blade.
14.52 in Attach the Axle to the chassis using the four (4) bolts, washers, and nylon lock nuts. Mount the tires. Note: The wheel recess outside on the.
New design With fewer parts and easier manufacture degrees 20mm 245.
THS Automotive Technology Safety Lesson 3: Raising and Supporting Vehicles Safely Raising and Supporting Vehicles Safely.
Background: Used to generate a pressure gradient shock wave traveling down a closed tube.
Design Review RSXS - EndStation Review on Vacuum Chamber Stand and Supports Location Beamline Roll-up Endstation.
Frame Overview A36 Steel square tubing and plate Frame will rest on four wheels or two air skids 90” Long, 30” wide- outside CG envelope Two carts for.
LAB #10. Governor Control Arm Using a 10mm socket install the two bolts that hold the governor control arm. Finger tighten then torque to 100 “#
Moeller GmbH GB Leistungsschalter Protective note to rule DIN ISO is to be considered The new line of circuit breaker IZM ILS-P / W. Wagner July.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Side view of generator. Close up of unused grounding pad - gives provisions for mounting the absorber.
Lithium Hydride Absorber Program C. M. Lei March 17, 2008.
Design of Openings (Pipes & Manholes). Design of Neck: Design of Gasket: Choose gasket type according to T & P.
LARP Collaboration Meeting Racetrack Coil Fabrication
Vicon subsoiler - Terra PL Product Information 2013.
A simple clamping device for the Solid absorber Wing Lau, Oxford.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
Three Pin Coupling Assembly Grey – Upper Arm Red – Arm Interface Plate with Pins for Coupling Blue – Wrist Interface Plate with Receptacles Wrist – Not.
Jigs A Definition When manufacturing a product, a jig is a custom-made tool used to control the location and/or motion of another tool. Why do we use jigs?
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
The reading is 7.38 mm. The reading is 7.72 mm.
Section 2 Safety, Tools and Equipment, Shop Practices Unit 6: Fasteners.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Integration of the Spectrometer Solenoid Magnets
AO Series 10 Illuminator pattern
Baby-MIND Modules & Services
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
Sphere Option for Helical spring CF16 Bellows Adjustment bolts (horizontal plane) CF38.
Industrial Skills Fasteners & Hardware.
STEP 1: ASSEMBLE ANGLE PLATES
2000SS 2½”-12”.
T400 Motor Replacement.
Building a Nightstand Woods 1 Final Project Step #1
Product Model Vertical Flange Rod Hangers
LARP Phase II Secondary Collimator RC-1
774 DCDA 21/2”-12”.
2000SS 2½”-12”.
774 2½”-12”.
Braze Test.
Single Detector Design
SNS PPU Cryomodule Space Frame
SNS PPU Cryomodule Thermal Shield & MLI


Presentation transcript:

Mounting arrangement for the Solid Absorber. This contains mounting arrangement for:- 1. Handling and lifting from manufacturer’s place to RAL; 2. For hanging the solid absorber inside the spool piece; 3. For mounting the solid absorber inside the AFC.

Clamping arrangement for general handling and Lifting from Works to RAL

Once at RAL, the hanging frame (made of 2mm thick sheet plate) replaces the eye bolt and allows the solid absorber to be mounted underside of the Spool piece access hole cover plate 520 mm Max width 70mm

Mounting tube to secure Solid Absorber sub-assembly to the AFC Large End Flange (at the safety window mounting bolt holes)