1 T. Fornek 1 LUSI CXI FIDR June 3, 2009 Thomas Fornek Project Manager June 3, 2009 LUSI Coherent X-Ray Imaging Instrument Final.

Slides:



Advertisements
Similar presentations
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
Advertisements

Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science OECM Limited-External Independent.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
Tom Fornek LUSI 12 November 2008 SLAC National Accelerator Laboratory 1 LUSI Status Update Tom Fornek Project Manager.
Tom Fornek LUSI June 17, LUSI UPDATE – June, 2008.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
Jochen R. Schneider AMO Proposal June 2, LCLS User Access Policy Goals Scientific thrust areas - Instrument Teams.
John N. Galayda LCLS Facility Advisory November 11, LCLS Update November 11, 2008 Construction Status LCLS Instruments.
John Arthur X-ray November 11, 2008 SLAC National Accelerator Laboratory 1 X-ray Overview LCLS Directorate structure.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project The Instrument Readiness Review Process John Arthur LCLS Experimental Facilities Division.
J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 LUSI Overview J. B. Hastings January 2007 Lehman Review Response to Lehman Review.
Mark Reichanadter LCLS FAC October 29-31, 2007 Report to the LCLS Facilities Advisory Committee Project Management Project.
Diffraction studies of stimulated dynamics (pump-probe) Coherent-scattering studies of nanoscale fluctuations Atomic, molecular and optical science High.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
M. Reichanadter LCLS Project June 2008 FAC Meeting Report to the LCLS Facilities Advisory Committee Project Management.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
John N. Galayda LCLS Facility Advisory 29 October 2007 Linac Coherent Light Source Overview 29 October 2007  Project.
John Arthur PIXEL Project April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation.
1 T. Fornek 1 LUSI XCS FIDR June 17, 2009 Thomas Fornek Project Manager June 17, 2009 LUSI X-Ray Correlation Spectroscopy Instrument.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
1 Sébastien Boutet 1 Coherent X-ray Imaging Instrument FAC Meeting, June Coherent X-ray Imaging Instrument Sébastien Boutet.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
XCS Aymeric ROBERT 1 LUSI X-ray Correlation Spectroscopy Instrument Advanced Procurement Review : Large Offset Monochromator.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
1 E. Bong 1 XCS Final Instrument Design Review Engineering Status April 21, 2009 LUSI WBS 1.4 X-Ray Correlation Spectroscopy Final.
Introduction to FACET & Test Facilities and charge to SAREC committee Vitaly Yakimenko June 25, 2013.
John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 1 From construction project to operating facility Structure.
W.J. Foyt LUSI DOE Review July 23, 2007 Project Management 1 Project Management W. J. Foyt Project Scope Timeline Cost Estimate.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Felix B. Fernandez LUSI DOE Review August 20, 2008 PMCS Overview p. 1 LCLS Ultrafast Science Instruments (LUSI) Felix B. Fernandez.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
Mark Reichanadter LCLS October 9-11, 2007 LCLS BCR Overview and EIR LOIs Project Progress / Status Revised Project Baseline.
Tom Fornek LUSI DOE Review August 19, 2008 Management Overview p.1 LCLS Ultrafast Science Instruments (LUSI) T. Fornek – Project.
Nadine Kurita LUSI DOE Review July 23, 2007 PMCS 1 Project Management Cost and Schedule Nadine Kurita ANSI/EIA-748-A Standard.
OFFICE OF SCIENCE Closeout Report by the Review Committee for the LHC-CMS Detector Upgrade Project Fermi National Accelerator Laboratory August 27, 2013.
OFFICE OF SCIENCE DOE/SC CD-3c Review of the Muon to Electron Conversion Experiment (Mu2e) Project Fermi National Accelerator Laboratory June 14-16, 2016.
Project Management W. J. Foyt
LUSI Coordination with LCLS
Experimental Facilities Planning
Linac Ops Budget Review LCLS Overview / Org Structure / Legacies
Development of LCLS Far Experimental Hall Hutches
John N. Galayda – Director of LCLS Construction March 30, 2009
Thomas Fornek Project Manager July 15, 2009
John N. Galayda – Director, LCLS Construction May 13, 2009
LCLS Project Management
LUSI Controls and Data Systems W.B.S. 1.6
Tom Fornek Project Manager April 20-22, 2009
Details supporting the increase
LUSI MANAGEMENT OVERVIEW
Project Management Issues John N. Galayda, SLAC April 24, 2002
John Arthur – LCLS Experimental Operations
The Transition to User Operations
PIXEL Project Status John Arthur Photon Instrumentation for
Coherent X-ray Imaging Instrument WBS 1.3
X-ray Correlation Spectroscopy Instrument
Preliminary Project Execution Plan
LCLS Instrument MIE Project: Staffing, Schedule
LUSI Controls and Data Systems W.B.S. 1.6
Presentation transcript:

1 T. Fornek 1 LUSI CXI FIDR June 3, 2009 Thomas Fornek Project Manager June 3, 2009 LUSI Coherent X-Ray Imaging Instrument Final Instrument Design Review INTRODUCTION

2 T. Fornek 2 LUSI CXI FIDR June 3, 2009 LUSI WBS Organization WBSTITLE 1.1Project Management 1.2.X-ray Pump Probe Instrument (XPP) 1.3Coherent X-ray Imaging Instrument (CXI) 1.4X-ray Correlation Spectroscopy Instrument (XCS) 1.5Diagnostics and Common Optics (DCO) 1.6Controls and Data Acquisition (CDA)

3 T. Fornek 3 LUSI CXI FIDR June 3, LCLS LUSI H6 Offset Monochromator Exp. Chamber Detector Beam Transport Near Experimental Hall Far Experimental Hall XPP XCSCXI AMO H6 Part of LCLS FES ARRA Funds SXR Installation Part of LCLS Project description (1) XCS Mono X-ray Transport LUSI is Providing Instruments for Three of the Six LCLS Instrument Hutches

4 T. Fornek 4 LUSI CXI FIDR June 3, 2009 Project description (2) XPP WBS 1.2 LCLS AMO XCS Offset Monochromator WBS 1.5 X-ray transport tunnel (200 m) XCS WBS 1.4 H6 CXI WBS 1.3 LCLS SXR

5 T. Fornek 5 LUSI CXI FIDR June 3, 2009 Project Status (1) LUSI Baseline Performance (through Apr09) TPC = $60M (MIE = $55.1M, OPC = $4.9M) CD-4 = August 2012 TPC >26% Complete, TEC >18% Complete Contingency on MIE = $11.8M 33.2% on remaining work OPC is complete $50K remaining for close-out ARRA Funds ($33.6M) Received in April Part of the $60M TPC Most recent added scope to enhance LUSI science program Large Offset Monochromator for XPP Focusing lens for CXI

6 T. Fornek 6 LUSI CXI FIDR June 3, 2009 Project Status (2) Design Completion XPP Instrument Design through FIDR CD-3 Ready CXI Instrument FIDR in June 90% CD-3 Ready Now - Solid Instrument Configuration XCS Instrument FIDR in June 90% CD-3 Ready Now - Instrument configuration is solid Diagnostics and Common Optics Design 90% CD-3 Ready Now Harmonic Rejection Mirror PDR in June Controls and Data Acquisition 100% CD-3 Ready Now Inherited Designs from LCLS comprise many items

7 T. Fornek 7 LUSI CXI FIDR June 3, 2009 Project Status (3) Still waiting for the DOE-IPR Status Review Report Responses have been prepared to the close-out report recommendations Preparing for the July 15, 2009 CD-3 Review Held in Germantown LUSI PM, Instrument Scientists and Controls Rep to travel Working on the second part of the Baseline Change to incorporate ARRA effects into the baseline Still need to incorporate two L2 milestones into schedule and adjust schedules appropriately (Waiting on TCCC) First month of reporting on ARRA accounts has been completed Some corrections are needed to the baseline – These will be incorporated in May

8 T. Fornek 8 LUSI CXI FIDR June 3, 2009 April Milestone Status

9 T. Fornek 9 LUSI CXI FIDR June 3, 2009 Schedule Advancement XCS “Early Science” allows for a functioning XCS instrument one year earlier than original schedule MilestoneCurrent Baseline Advanced Baseline CD-3April 2010October 2009 XPP Early ScienceOctober 2010 CXI Early ScienceAugust 2011June 2011 XCS Early Science (New)NAAugust 2011 Project Ready for CD-4 (New)NAMarch 2012 CD-4August 2012

10 T. Fornek 10 LUSI CXI FIDR June 3, 2009 April Status

11 T. Fornek 11 LUSI CXI FIDR June 3, 2009 Project Risks and Mitigation LUSI Follows the LCLS Risk Management Plan and uses the LCLS Risk Registry LCLS Project Management Document Risk Registry Updated May, 2009 Major Risks Do something to cause loss or suspension of ARRA funds Annual funding - Continuing Resolutions (Retired) Foreign procurements – Dollar fluctuation, sole source Loss and/or availability of critical personnel (Exercised) Ability to place procurements in a timely manner CXI mirror delivery, performance XPP, XCS Monochromator delivery, performance XPP, XCS Detector delivery, performance

12 T. Fornek 12 LUSI CXI FIDR June 3, 2009 Part of an Advance Procurement Review

13 T. Fornek 13 LUSI CXI FIDR June 3, 2009 LCLS Directorate – Detail 1/2009 LCLS Directorate Dale Knutson Mark Reichanadter, Deputy Business Office Cindy Lowe TBD - Deputy Accelerator Systems Division John Seeman TBD - Deputy P. Miller, Accelerator Safety Officer Engineering & Physics Division Dave Schultz James Krebs, Deputy TBD – ES&H Coordinator Experimental Facilities Division Jochen Schneider TBD - Chief Operating Officer TBD – Beam Line Safety Officer Strategic Projects Division John Galayda M. Scharfenstein – Construction Safety ESH / Work Planning & Control Michael Scharfenstein Richard Hislop Special Projects Richard M. Boyce Uli Wienands Administration Helen O’Donnell, LA De Wan, B. Espiritu, D. Ford, S. Matni, R. Matter, D. Mitchell, P. Tank

14 T. Fornek 14 LUSI CXI FIDR June 3, 2009 Strategic Projects Division (SPD) John Galayda M. Scharfenstein, Construction Safety LCLS Construction Project J. Galayda M. Reichanadter, Deputy J. Albino, AD, Civil Const. Project Org = 83 FTEs LUSI MIE Project T. Fornek TBD, Deputy Project Org = 27 FTEs RSB J. Albino G. Herman, K. Chan-Hui Project Org = 7 FTEs PULSE D. Rich Project Org = 10 FTEs Future Upgrades J. Galayda

15 T. Fornek 15 LUSI CXI FIDR June 3, 2009 LUSI Project’s Integrated Project Team DOE-HQ Harriet Kung, Acquisition Executive T.E. Kiess, Program Manager DOE-SSO H. Joma DOE Federal Project Director SLAC T. Fornek LUSI Project Manager RM Boyce - Deputy WBS 1.2 XPP IIT D. Fritz (Instr. Scientist) WBS 1.3 CXI IIT S. Boutet (Instr. Scientist) WBS 1.4 XCS IIT A. Robert (Instr. Scientist) WBS 1.5 Diagnostics & Common Optics Y. Feng (Lead Scientist) Instrument Team Leaders DOE-SSO Support WBS 1.6 Data Acquisition & Controls G. Haller (Lead) LCLS Directorate Support Engineering, Procurement, QA, ES&H, Finance & Budget, PMCS Technical Configuration Control Committee. Installation Manager B. Poling

16 T. Fornek 16 LUSI CXI FIDR June 3, 2009 Schedule Advancement XCS “Early Science” allows for a functioning XCS instrument one year earlier than original schedule MilestoneCurrent Baseline Advanced Baseline CD-3April 2010October 2009 XPP Early ScienceOctober 2010 CXI Early ScienceAugust 2011June 2011 XCS Early Science (New)NAAugust 2011 Project Ready for CD-4 (New)NAMarch 2012 CD-4August 2012

17 T. Fornek 17 LUSI CXI FIDR June 3, 2009 CHARGE - 1 Technical Scope Is the design of the partial instrument mature and technically sound to enable early scientific experiments at LCLS? Have all of the major interfaces been identified and incorporated in the design? Have design reviews been performed? Is the design likely to meet performance expectations? Management Is the instrument team organized and staffed to successfully achieve the milestone? Have all the major risks been identified and effectively managed? Are procurements appropriately planned for the partial instrument?

18 T. Fornek 18 LUSI CXI FIDR June 3, 2009 CHARGE - 2 Cost and Schedule Are the cost and schedule reasonable to achieve the planned scope? Have the CXI cost and schedule been recently updated? Is there sufficient cost and schedule contingency to ensure successful completion of the partial instrument on schedule? ES&H Are all related ES&H aspects being properly addressed? Overall Readiness Is CXI ready to begin fabrication and installation at LCLS to begin conducting early scientific experiments?