Jess Albino Session 5 Conventional November 11, 2008 1 Facility Advisory Committee LINAC Coherent Light Source Project.

Slides:



Advertisements
Similar presentations
David Saenz Space Conversion to June 17, Space Conversion to Offices Scope Schedule Budget.
Advertisements

MENDOCINO COLLEGE MASTER PLAN Mendocino College Faculty and Staff Presentation December 10, 2008.
Information Technology Development Center FLAGLER COUNTY FLORIDA ENGAGING IN THE WORLD WIDE ECONOMY.
810 Mission Avenue 3 rd Floor Refurbishment October 17, 2013 Related to Agenda Item 14.
Jess Albino CF – Breakout Session June 17, Facility Advisory Committee LINAC Coherent Light Source Project Conventional.
Finance and Administration Advisory Group June 30, 2010.
David Saenz FAC CF April 20, 06 Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities D. Saenz.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science OECM Limited-External Independent.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
Jess Albino Session 5 Conventional November 11, Facility Advisory Committee LINAC Coherent Light Source Project.
David Saenz FAC CF April 07, 2005 Conventional Facilities Overview SLAC Site Plan Systems Description Construction Schedule.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
Javier A. Sevilla MMF FAC Review October 27, Magnetic Measuring Facility (MMF) Outline Summary of Facility Requirements.
David Saenz Far Experimental Hall - June 17, Far Experimental Hall - Hutches Scope Budget Schedule.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
1 Jess Albino 1 Conventional Facilities Status FAC Review – Breakout Session CONVENTIONAL FACILITIES STATUS Jess Albino – Associate.
David Saenz FAC CF Oct 12-13, 2004 Conventional Facilities Overview SLAC Site Plan Systems Description Construction Schedule.
David Saenz CF Oct 30, CF MEP Commissioning.
John N. Galayda LCLS FAC October Linac Coherent Light Source Overview and Charge Facility Advisory Committee.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
Opening Comments and Charge 19 January 2004 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear.
David Saenz FAC November 11, 2008 SLAC National Accelerator Laboratory 1 Far Experimental Hutches David Saenz Project Manager.
Javier A. Sevilla April 5, Magnetic Measuring Facility (MMF) Outline Organizational Chart Facility Design Criteria,
Facilities Advisory Committee Preliminary Feasibility and Cost Study April 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 Lori Plummer 1 LCLS Office Space FAC Review – Breakout Session CONVENTIONAL FACILITIES LCLS Office Space Lori Plummer, PMP,
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities CFAC Cost Review May 9, 2007.
Project Title: CONSTRUCTION OF SCIENCE & TECHNOLOGY BLDG. (Ph. 1) Approved Budget for the Contract (ABC): Php 26,102, (Ph. 1) Source of Funds:Fund.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
California State University, Sacramento Facilities Services May 19, 2008.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
David Saenz EIR Review Oct 9-11, Conventional Facilities (CF) WBS 1.9 ETC and Methodology David Saenz CF Systems Manager.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
DAVIS SR. HIGH SCHOOL ALL-STUDENT CENTER (MULTIPURPOSE BUILDING) PROGRAMMING OPTIONS August 6, 2015.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
Lincoln Public Schools Lincoln, Nebraska Lincoln Public Schools Work Session 10-Year Facility and Infrastructure Plan Update October 22, 2013.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District March 3, 2010 EDUCATE  ENGAGE  EMPOWER 1.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
Betsy Kerrison Property Acquisition
Building Services Summer 2016 Update
PROJECT COST MODEL 2 – NEW DRIGGS AND VICTOR K-3 SCHOOLS AND RENOVATE EXISTING FACILITIES 1Construction costs based on most recent national and regional.
Facilities Update November 17, 2017
CF Organization & Schedule
Meeting of the LCLS Facilities Advisory Committee
Lockeford Elementary School Kindergarten Construction
CONVENTIONAL FACILITIES STATUS
Sandy Grove Middle School
PULSE Building Renovation
CONVENTIONAL FACILITIES LCLS Office Space
Conventional Facilities (WBS 1
CONVENTIONAL FACILITIES LCLS Office Space Procurement
Far Experimental Hall - Hutches
Conventional Facilities WBS 1.9
North Augusta High School – Phase 2A and 2B
Presentation Overview
CONVENTIONAL FACILITIES
Linac Coherent Light Source Transition to Operations 11 July 2007
Department Of Energy Review Linac Coherent Light Source Project
Conventional Facilities
AE Title III Status Introduction
CF Scope, Management & Organization
EAST PENNSBORO AREA SCHOOL DISTRICT
JLEIC Accelerator R&D Meeting
CMGC Overview SLAC Site Plan Systems Description Construction Schedule
Unit 47, Rosemount Park Drive, Rosemount Business Park, Ballycoolin, Dublin 15 To Let 25,006 sq. ft 2,323 sq. m High spec logistics facility with 11 meters.
Presentation transcript:

Jess Albino Session 5 Conventional November 11, Facility Advisory Committee LINAC Coherent Light Source Project Conventional Facilities Project Office Space

Jess Albino Session 5 Conventional November 11, SLAC Site Plan SLAC Main Gate MMF Research Yard Pep Ring Road LCLS General Work Boundary Sector 25 Sector 20 Upstream B028 B751

Jess Albino Session 5 Conventional November 11, Existing space - 38 occupants BUILDING #28 Phase II – 45 occupants Phase I - not part of LCLS

Jess Albino Session 5 Conventional November 11, Ground Floor Second Floor Third Floor Existing offices to remain – 25 occupants Office space for 24 occupants Office space for 14 occupants

Jess Albino Session 5 Conventional November 11, Two story CLOC provided for 176 occupants First floor (18,800 sf) Offices - 56 Conf/work area – 8 Laser labs - 2 Second floor (30,250 sf) Offices Conf/work area – 12 Laser labs – 1 Wet lab - 1 Project Office Space Lab infrastructure renovation provides for 146 occupants Building #28 - Phase II (8,500 sf) – 45 occupants Offices – 36 Conf/work area – 3 Building #28 – existing space – 38 occupants Offices – 27 Conf/work area – 3 CEH (11,785 sf) – 63 occupants Offices – 27 Conf/work area – 1 Existing NEH offices to accommodate 15 occupants (already included as part of NEH)

Jess Albino Session 5 Conventional November 11, WBS for B028 and B751 have a combined TPC of $4.94M B751TPC $3.09M EDI at $.49M Independent cost estimate Title I/II design Construction at $2.6M Title III B028 TPC $1.85M EDI at $.25M Independent cost estimate Title I/II design Construction at $1.6M Title III Budget

Jess Albino Session 5 Conventional November 11, CEH (second floor) office space improvement, including chiller (for second floor) and boiler (for all CEH) upgrades:$190 per sf. turnkey cost. Project period: 2QFY05 - 1QFY06 ISOC (in B084, first floor) office space conversion to GLAST Operations Center and electronics lab expansion: $250 per sf turnkey cost. Project period: 1QFY06 - 1QFY07 Directorate Office expansion with all new hard walled offices (in B040 first floor): $270 per sf turnkey cost. Project period: 1QFY06 - 2QFY07 Similar Projects

Jess Albino Session 5 Conventional November 11, Project Office Space Develop Alternate Plan for Project Office Space. Building 751 – first and second floor Ground floor – build 24 offices Second floor – update 25 existing offices Delete scope for third floor. New Building B751 Annex New Structure

Jess Albino Session 5 Conventional November 11, Project Office Space Alternatives Modular office modules Single story office and lab building Renovation of existing space

Jess Albino Session 5 Conventional November 11, Modular Concept – Jacobs ,500 sq. ft. Unit cell: Office Module Lab/Office Cluster Utility Core Elevator WC Electric/telephone $5.6M/Unit Cell Design/build contract for 2007

Jess Albino Session 5 Conventional November 11, Project Office Space

Jess Albino Session 5 Conventional November 11, Project Office Space

Jess Albino Session 5 Conventional November 11, Project Office Space

Jess Albino Session 5 Conventional November 11, CLOC First Floor – Jacobs sf 256 sf 1344 sf 3800 sf 2294 sf 2702 sf Total square footage = 10,776

Jess Albino Session 5 Conventional November 11, CLOC Second Floor – Jacobs 2006

Jess Albino Session 5 Conventional November 11, Project Office Space Single Floor Office Building 19,000 Sq. ft. (approx. first floor of CLOC) New Building Cost $ /sf = $6.65M - $7.6M Building Renovation Budget - $4.9M B751 - $3.09M B028 - $1.85M High Estimate for B751 and New Building $7.6 + $3.09 = $10.69M Potential Draw on Project Contingency: $7.6 - $1.85 = $5.75M 1: Estimated cost based on recent SLAC/LBNL/LLNL costs for similar buildings

Jess Albino Session 5 Conventional November 11, Project Office Space Schedule (Design / Build) Start Design: January 2009 Start Construction: May 2009 Substantial Completion: May 2010 CD-4 July 2010.

Jess Albino Session 5 Conventional November 11, End of presentation