Jo Beth Folger MMF Site and October 14, 2004 1 Conventional Facilities – MMF Presentation Outline Facility Design.

Similar presentations


Presentation on theme: "Jo Beth Folger MMF Site and October 14, 2004 1 Conventional Facilities – MMF Presentation Outline Facility Design."— Presentation transcript:

1 Jo Beth Folger MMF Site and Constructionjbfolger@slac.stanford.edu October 14, 2004 1 Conventional Facilities – MMF Presentation Outline Facility Design Criteria Site Location Facility Design Schedule

2 Jo Beth Folger MMF Site and Constructionjbfolger@slac.stanford.edu October 14, 2004 2 Facility Design Criteria Facility Use Space Requirements Environmental Stability Temperature +/- 0.1 deg. C. Humidity Vibration <0.5 microns Utility Requirements Electrical Other

3 Jo Beth Folger MMF Site and Constructionjbfolger@slac.stanford.edu October 14, 2004 3 MMF Facility Uses Undulator magnet tuning – 2 magnet measuring machine test stands Aligned with same orientation to Earth’s magnetic field as LCLS Undulator Hall. Undulator fiducialization – large coordinate measuring machine Cradle assembly area Magnet storage/temperature acclimation Work desks in lab and office space for 2 employees

4 Jo Beth Folger MMF Site and Constructionjbfolger@slac.stanford.edu October 14, 2004 4 Resultant Building Criteria ~4800 sq. ft. floor space (inc. ~3000 laboratory space) + mezzanine Locate within an existing building to aid in temperature control Adequate ceiling height for overhead cranes Accessible for magnet delivery using trucks and forklifts Availability of required utilities, esp. electrical service – 600A, 480v 3f

5 Jo Beth Folger MMF Site and Constructionjbfolger@slac.stanford.edu October 14, 2004 5 Building 081 Location LCLS Undulator Hall Research Yard PEP Ring Road

6 Jo Beth Folger MMF Site and Constructionjbfolger@slac.stanford.edu October 14, 2004 6 Building 081 Site Layout

7 Jo Beth Folger MMF Site and Constructionjbfolger@slac.stanford.edu October 14, 2004 7 Building 081 Current Uses

8 Jo Beth Folger MMF Site and Constructionjbfolger@slac.stanford.edu October 14, 2004 8 New Space Allocation for Bldg. 081 SHIPPING & RECEIVING EQUIPMENT REPAIR VEHICLE SHOP Offices

9 Jo Beth Folger MMF Site and Constructionjbfolger@slac.stanford.edu October 14, 2004 9 MMF Ground Floor Plan

10 Jo Beth Folger MMF Site and Constructionjbfolger@slac.stanford.edu October 14, 2004 10 MMF Ground Floor Plan Magnet Measuring Lab ~1600 ft. sq.

11 Jo Beth Folger MMF Site and Constructionjbfolger@slac.stanford.edu October 14, 2004 11 MMF Ground Floor Plan Coordinate Measuring Area ~ 1000 ft. sq.

12 Jo Beth Folger MMF Site and Constructionjbfolger@slac.stanford.edu October 14, 2004 12 MMF Ground Floor Plan Cradle Assembly Area ~325 ft. sq.

13 Jo Beth Folger MMF Site and Constructionjbfolger@slac.stanford.edu October 14, 2004 13 MMF Ground Floor Plan Magnet Loading and Storage ~850 ft. sq.

14 Jo Beth Folger MMF Site and Constructionjbfolger@slac.stanford.edu October 14, 2004 14 Mezzanine Floor Plan Mezzanine for Mechanical Equipment

15 Jo Beth Folger MMF Site and Constructionjbfolger@slac.stanford.edu October 14, 2004 15 Cross Sections

16 Jo Beth Folger MMF Site and Constructionjbfolger@slac.stanford.edu October 14, 2004 16 Rear Elevation Roll up door for magnet delivery Mechanical Access Staff Access

17 Jo Beth Folger MMF Site and Constructionjbfolger@slac.stanford.edu October 14, 2004 17 Schedule Completion of Title II drawings December 2004 Bid and contract with general contractor January – April 2005 Construction May – November 2005 (Early Finish) February 2006 (Beneficial Occupancy)