STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 SEP Integration and Test Alan Cummings 626-395-6708

Slides:



Advertisements
Similar presentations
Ray Lundquist, NASA GSFC
Advertisements

STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 Low Energy Telescope (LET) Overview Alan Cummings
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
IMPACT Report SSMO Receiving Review– January 23, 2007.
Critical Design Review 2002 November 20,21,22 STEREO IMPACT 1 SEP Central, LET, and SEPT Flight Software Presenter: Andrew Davis
GLAST LAT Project – Cost and Schedule ReviewNovember 3, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review November 3, 2004.
GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 1 GLAST Large Area Telescope: Calorimeter (CAL) Subsystem.
GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 1 GLAST Large Area Telescope: ACD Integration & Test Jim La/ACD I&T Lead.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 LET Performance Requirements Presenter: Richard Mewaldt
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 SEP and LET GSE Software Presenter: Andrew Davis Contact:
STEREO IMPACT Preliminary Design Review 2001-September 11,12 David Curtis1 IMPACT Project Overview.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
1 TIPS 4/18/2013 Status of JWST/ISIM Test Program Scott Friedman TIPS/JIM April 18, 2013.
SS Space Science MO&DA Programs - November Page 1 Cosmic-Ray Isotope Abundances Compared with Solar System Cosmic-ray source abundance have been.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
1 PFP MSR, 11/17/2009 Particles and Fields Package Monthly Status Review (MSR) November 17, 2009 Dave Curtis, PFP PM.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
THEMIS Instrument Suite PERSuite T-V- 1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Peter Walpole, UMd1 SUPRATHERMAL ION TELESCOPE SIT.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
THEMIS peer Instrument CDR 1 CETP, Paris, April 8, 2004 THEMIS Mission Status at Peer UCB Instrument Critical Design Review UCB, April 19/20, 2004 Vassilis.
Presented by A.B. Galvin STEREO SWG NOAA Boulder, Co 22 March 2004 PLASTIC Activities.
ECE445: The Design Review Sept 2, Documentation Roadmap Request for Approval Proposal Design Review Final Paper &Presentation Sept 10Sept 16Sept.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Critical Design Review May , 2011 Integration and Test Dave Curtis PFP Package Manager Mars.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration and Test 2011 March 29 Dave Mitchell.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
STEREO SWG May PLASTIC Status Report to the STEREO SWG 2 May 2005 Hamburg Planetarium UNH: A.B. Galvin (PI), E. Moebius (Lead CoI), L. Kistler, M.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
FGM peer CDR GSE - 1 Berlin, April 6, 2004 Ground Support Equipment Concept (GSE) Werner Magnes Institut für Weltraumforschung (IWF) Austrian Academy of.
FGM peer PDR GSE - 1 Braunschweig, October 8-9, 2003 Ground Support Equipment Concept (GSE) Werner Magnes Institut für Weltraumforschung (IWF) Austrian.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
THEMIS MRRI&T − 1GSFC, January 5, 2007 Integration and Test.
C osmic R Ay T elescope for the E ffects of R adiation June 27, 2005Larry Kepko - Data ProcessingPage 1 CRaTER Characterization Data Products & Production.
STEREO IMPACT Preliminary Design Review 2001-September 11,12 Rick Cook1 LET Electronics.
PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: Time History of Events.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
4-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Verification Dave Curtis, PFP Package Manager.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
STEREO IMPACT Critical Design Review 2002 November 20,21,22 P.Berg1 STEREO IMPACT POWER SUPPLIES Peter Berg, UC Berkeley Space Sciences Lab,
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Low Energy Telescope (LET) Overview Alan Cummings caltech
SPF MAG Quarterly Report – Feb 2015
LET Performance Requirements Presenter: Richard Mewaldt
WP-X XFEL Project Progress Report (2016-3)
Dave McComas on behalf of the ISʘIS Team
SEP and LET GSE Software Presenter: Andrew Davis caltech
THEMIS INSTRUMENT SUITE
High Energy Telescope (HET) GSFC Caltech JPL
0.0 Instrument Suite Name Presenter’s name
Peer Review Agenda (Suggested).
Integration, Test, and Calibration
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
Integration and Test Organization Chart
GLAST Large Area Telescope
Integration and Test Organization Chart
Presentation transcript:

STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 SEP Integration and Test Alan Cummings

STEREO IMPACT Critical Design Review 2002 November 20,21,22 2 SEP Integration and Test Flow Four instruments tested separately to the extent possible –LET at Caltech/JPL –HET at GSFC –SIT at UMd/GSFC, includes acoustics and vibration –SEPT at Kiel, includes acoustics, vibration, and thermal vacuum SEP Central integrated & tested at Caltech –Low Voltage Power Supply from UCB –Detector bias supply from Space Instruments –Analog/post-reg board from Space Instruments –Logic board from Caltech –Mechanical parts from GSFC SEP Central simulator will be provided to GSFC to aide in HET & SIT testing ETU systems will be integrated & tested first at Caltech SEP Central/IDPU interface test at UCB and/or Caltech Integrate into SEP flight system at Caltech Test SEP at Caltech Accelerator test of LET, HET, and SEP Central Vibration, acoustics, and thermal vac at JPL for LET/HET/SEP Central Thermal vac for SIT at JPL EMI/EMC for all of SEP at UCB

STEREO IMPACT Critical Design Review 2002 November 20,21,22 3 End-to-End Test of LET & HET at a Heavy Ion Accelerator Equipment: LET, HET, SEP Central, GSE Location: MSU/NSCL or LBL 88” Cyclotron Beams: H, He, O, Si, Ar, Ni, etc. (and range of fragments) Energies: ~2 to ~100 MeV/nuc Intensities: ~1 to ~10 5 /s Objectives: –End-to-end functional test –Verify species/energy algorithms –Verify element, isotope resolution –Verify event priority and formatting –Check for unexpected anomalies

STEREO IMPACT Critical Design Review 2002 November 20,21,22 4 LET Verification Matrix

STEREO IMPACT Critical Design Review 2002 November 20,21,22 5 HET Verification Matrix

STEREO IMPACT Critical Design Review 2002 November 20,21,22 6 SIT Verification Matrix

STEREO IMPACT Critical Design Review 2002 November 20,21,22 7 SEPT Verification Matrix

STEREO IMPACT Critical Design Review 2002 November 20,21,22 8 SEP Central Verification Matrix

STEREO IMPACT Critical Design Review 2002 November 20,21,22 9 SEP Integration and Test Flow Chart

STEREO IMPACT Critical Design Review 2002 November 20,21,22 10

STEREO IMPACT Critical Design Review 2002 November 20,21,22 11

STEREO IMPACT Critical Design Review 2002 November 20,21,22 12

STEREO IMPACT Critical Design Review 2002 November 20,21,22 13 Schedule Comment Insufficient slack in “Ready to Deliver to JHU/APL” milestone Caltech schedule shows 50 days of slack but Project integrated schedule shows only about 15 days of slack First block on SEP I&T Flowchart, “EM Systems I&T”, is showing a 5-month slip, moves flight work out (but not by 5 months) Actions taken to recover that slip are shown on next slide Conclude that we can meet original 5/12/03 date to start EM Systems I&T Need to review, edit, and re-baseline Project integrated schedule

STEREO IMPACT Critical Design Review 2002 November 20,21,22 14 Schedule Comment (continued)

STEREO IMPACT Critical Design Review 2002 November 20,21,22 15 SEP Intergroup Deliverables List