3 May 2005Claudio Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last two weeks Reporting for: Dan Callahan Susanne Kyre Stephen.

Slides:



Advertisements
Similar presentations
14 June 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz.
Advertisements

GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
US Tracker Production Meeting, March 8, 2005 J. Incandela 1 Slides for the US Si Tracker Weekly Production Meeting J. Incandela March 8, 2005.
Rods Schedule and Issues J. Incandela University of California Santa Barbara for the TOB Rod Group Tracker Integration Meeting October 27, 2005 Slides.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.
Slide 1 Anthony Affolder US Module LT meeting June 17, 2004 UCSB Module LT Testing.
1 Hybrid & Module Testing Status Week of 4/25-4/29.
Recent TOB Developments First LT failure and Stereo Module Status J. Incandela With slides provided by E. Chabalina, A. Affolder, Dean White.
24 May 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
1 Hybrid & Module Testing Status Week of 6/6-6/10.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
Production Monitoring and QC FCal1 Production Advancement Review February 20, Peter Loch University of Arizona Tucson, Arizona FCal1 Production.
6/23/2005 Claudio Campagnari, weekly US rod meeting 1 New Development: Tentative Plan for Rod Production As relayed to me by Joe, following the discussion.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Slide 1Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Module Testing at UCSB: Simulated Production Derek Barge On behalf.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
28 June 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz.
Slide 1 Electrical Testing at UCSB -Anthony AffolderDOE review, January 18, 2005 Electrical Testing at UCSB: Hybrids & Modules Anthony Affolder On behalf.
CMX Production Status Presented to the L1Calo Meeting on Monday 22-Sept-2014 by Dan Edmunds for the CMX Group.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
A Few Pointers from the Linac4 Beam Commissioning of Warm Linac Yngve Levinsen Beam Physics Section 05/02/16.
17 May 2005Jim Lamb (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz Puneeth.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
The Calendar.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
APRIL MORNING MESSAGES. WEDNESDAY, APRIL 27 DAY 9, PHYS. ED.  Good Morning!  Come in and copy down your assignments and begin LA (pink book) number.
10/month is the present production rate 2 FTE + sporadic contributions
UCSB Testing Status Anthony Affolder
Hybrid & Module Testing Status
Update of US Testing Status
Results from module testing
Unexpected Failures of Modules on Rods
Vienna Module Production
On behalf of the US TOB testing group
First Assembled Rod in US
Module production in Italy
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
Electrical Testing at UCSB: Hybrids & Modules
US Module Testing Progress Report
Operations/Failure Analysis
Operations/Failure Analysis
Electrical Testing at UCSB: Hybrids, Modules, & Rods
Isolated Bad-CAC Strip at UCSB
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Recent TOB Developments
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Recent TOB Developments
Module Testing Status Week of 3/14-3/18.
Hybrid & Module Testing Status
Hybrid & Module Testing Status
US Module Testing Progress Report
Operations/Failure Analysis
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
Presentation transcript:

3 May 2005Claudio Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last two weeks Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz Puneeth Kalavase Jim Lamb assembly testing

3 May 2005Claudio Campagnari (UCSB)2 Status of Rod Production at UCSB Rod production delayed by recall of rods for PCB cleaning at CERN (end of March) First batch of cleaned rods arrived on Wednesday, April 20 First two production rods assembled on Thursday, April 21 First tests of these rods showed a few bad channels not expected from module testing

3 May 2005Claudio Campagnari (UCSB)3 UCSB Rod Production (cont.) The appearance of bad channels after rod assembly had also been seen on a few rods built in March (before CERN recall) Problem had been traced to scratches caused by the rod assembly tool Similar issue also at FNAL (same tool) Steps were taken to try to keep the tool clean, also inspect before use Apparently this is not enough

3 May 2005Claudio Campagnari (UCSB)4 UCSB Rod Production (cont.) Rod production was stopped immediately Modified tool. No more contact with silicon New tool picks up module from CF frame

3 May 2005Claudio Campagnari (UCSB)5 UCSB Rod Production (cont.) New fixture was used to remove five modules with new bad channels and replace them with fresh set of modules Assembly/Disassembly with new tool went well Rods were re-tested: no bad channels were introduced in assembly Resumed rod production Tuesday April 26 –Comfortably built 2 rods/day. Yesterday we built 4 –New tool works well Total of 14 rods have been built

3 May 2005Claudio Campagnari (UCSB)6 UCSB Rod Testing Teststands are operational –FNAL has seen occasional header errors that UCSB has reproduced when rod with header error was shipped to UCSB –Also concerned about I2C errors (next slide) –One outstanding bug in Lt analysis of pulse-shape, experts contacted Last details of long term scenario under discussion with FNAL Tuning of cuts for bad channel tagging will be done after test of a few more rods –FNAL results in this area very encouraging

3 May 2005Claudio Campagnari (UCSB)7 UCSB Rod Testing (cont.) Of the 14 built rods, 7 have been tested on single rod teststand –More will be tested today –One has "solid" I2C errors –Two have "sporadic" I2C errors It is a concern –FNAL has seen similar problems in recently built rods Discussing with CERN how to proceed

3 May 2005Claudio Campagnari (UCSB)8 UCSB Rod Testing (cont.) Was hoping to do first cold-cycle of load of 6 rods over the week-end. –Short developed in one of the control cables, took a while to find Started cold-cycle Monday May 2 (morning) – Aborted Monday evening due to Lt seg-fault Not sure why –Restarted it Monday evening. Failed during the night Thermistor used for interlock "came off" cooling circuit Now repaired, restarted cold-cycle this morning

3 May 2005Claudio Campagnari (UCSB)9 Summary Rod production started 1 week ago 14 rods built 7 rods tested on Single Rod stand – 3 with I2C errors  concern First Multi Rod testing (cold-cycle) in progress – clearly still a few teething problems Algorithm for tagging bad channels, rod- grading, etc, still needs some work