APQP - CP - QFD A dvanced P roduct Q uality P lanning C ontrol P lan Q uality F unction D eployment.

Slides:



Advertisements
Similar presentations
Facilitated by Joanne Fraser RiverSystems
Advertisements

BOPR 5301 – Operations Management Safitri Siswono Design of Goods & Services (chapter 5) March 26, 2010.
A DVANCE P RODUCT Q UALITY P LANNING by : Wahyu Epifanto.
Operations Management For Competitive Advantage 1 Product Design & Process Selection - Manufacturing Operations Management For Competitive Advantage Chapter.
Evaluating a Software Architecture By Desalegn Bekele.
Duke Energy Supplying power for a better tomorrow.
Business Plan Preparation Outline. Business Plan Preparation Guide  This summary was prepared to help its users put together a business plan (B.P.).
Quality Function Deployment
Class 6: Chapter 4 : Product/Process Innovation
IE673Session 4 - Customer Relationships1 Customer Relationships (The Voice of the Customer)
Multidisciplinary Engineering Senior Design Project xxxxx Project Name Preliminary Design Review mm/dd/yy Project Sponsor: Team Members: Team Mentor: Acknowledgements:
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 4 Product/Process Innovation McGraw-Hill/Irwin.
11. Purchasing, new product development and quality control
Production Preparation Process The SMS Technologies Quality Management System includes: ISO 9001, AS9100, ISO 13485, and ISO/TS  They All Include.
Large Automotive OEM – FMEA Managed Service
8-Aug-15 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work.
CHAPTER 10 Approaching the Customer with Adaptive Selling 1.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 28 Slide 1 Process Improvement 2.
Operational Excellence The Future?: …Process Management and Process Improvement.
Analyze Opportunity Part 1
Phillips Consulting & Sales LLC. Background 28+ years of Ford engineering/launch Project management Launch quality operating systems Chassis/powertrain.
Risk Management in the Built Environment Qualitative and Quantitative Risk Management By Professor Simon Burtonshaw-Gunn – licensed under the Creative.
Unit 14: Developing a Corrective Action Program Unit Introduction and Overview Unit objectives:  The purpose of a CAP  How a CAP benefits and supports.
1 Introducing the BSI IT Service Management (ITSM) Quick-Check Online tool.
Starting Comparing different projects that need to be done in the company Make project selection: Coding Performance Improvement Project.
Robotics & Engineering Design Projective Management Chin-Sung Lin Eleanor Roosevelt High School.
CPAS REVIEW MARKETING CHAPTER 1--MARKETING IS ALL AROUND US.
Including: PPAP. Advanced Quality Planning is a process to develop quality information in order to develop counter-measures for avoiding similar problems.
© 2001 Six Sigma Academy © 2003 Six Sigma Academy1 Champion Workshop Key Concepts.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
1 12 Chapter 12 Business Plans for Implementing Electronic Commerce.
Course Outline MAIL.PPT/1 © All Rights Reserved by TQMI TQMI, India's leading training and consultancy organisation, with its network of offices across.
Diploma in Procurement & Supply Business needs in Procurement & Supply Session 1 Business Needs and Procurement Decisions.
TARGET COSTING** LIFE CYCLE COSTS CROSS FUNCTIONAL CUSTOMER FOCUSED
Product/Process Innovation CHAPTER FOUR McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Test/Support Synergy Forest Weld Director of Quality Assurance and Support Arxan Technologies, Inc.
© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved.
Phase 3: DEVELOPMENT & VALIDATION
M ULTI -S TATE A DVANCED M ANUFACTURING C ONSORTIUM _v001_msamc_courseware_quality_ppt _v001_msamc_courseware_quality_ppt7 found in Resources.
Mahindra Satyam Confidential Quality Management System Software Defect Prevention.
Preliminary Questions Why should Honda devote so much time and resources to supplier development? Which suppliers to select? Nature of BP (philosophy,
Chapter 3 Needs Assessment. Objectives 1.Discuss the role of organization analysis, person analysis, and task analysis in needs assessment. 2.Identify.
Diploma in Procurement & Supply
Manufacturing Management Prayash Neupane. Manufacturing Management MM refers to all aspects of the product manufacturing process. From assembly design.
T HE E FFECTIVE P ROJECT M ANAGEMENT O FFICE Strategies For Building, Selling & Setting Up PMOs Mark E. Mullaly, PMP.
Process engineering Quality controls.
How to apply APQP APQP is comprised of one pre-planning stage and five concurrent phases. Once begun, the process never ends and is often illustrated in.
Practical Assessment Project Template – DMADV
Integrating QS9000 Requirements
Product and Service Design
Name of the Business…. The product is….
BUSINESS PROCESSES MAP
Software Quality Assurance
جمهورية مصر العربية المركز القومي للبحوث التربوية والتنمية مركز معلومات و التوثيق و دعم اتخاذا القرار.
Raytheon Parts Management
The Define Phase Templates and Worksheets
GE 6757 TOTAL QUALITY MANAGEMENT
Retail Enterprise Orgnaizational Chart
XG Sciences – Quality Management System ISO9001:2008 Certified
APQP Quality Planning in ISO 9000/ QS-9000 or ISO/ TS or .....
APQP PROCESS FLOW Prepare for APQP Plan and Define Program
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
Product and Process Validation JAN ROOVERS ASSOCIATES, INC.
Integrating TS Requirements
QFD & FMEA Linkage Requirements & Specifications
APQP Jan ("Yon") Roovers President JAN ROOVERS ASSOCIATES, INC.
Managing Employee Performance and Reward
1 ADVANCED PRODUCT QUALITY PLANNING Prepared By: Mr. Prashant S. Kshirsagar (Sr.Manager-QA dept.)
Project Planning Charter
PRODUCT QUALITY PLANNING CYCLE
Presentation transcript:

APQP - CP - QFD A dvanced P roduct Q uality P lanning C ontrol P lan Q uality F unction D eployment

A dvanced P roduct Q uality P lanning Benefits To direct resources to satisfy customer To promote early identification of required changes To avoid late changes To promote a quality product on time at the lowest price

A dvanced P roduct Q uality P lanning Stages Organize the team Define the scope Team to Team Training Customer and supplier involvement Simultaneous engineering Control plans Concern resolution Product quality timing plan Plans relative to the timing chart

APQP - Product Quality Timing PLan Plan and Define the Program Product Design and Development Process Design and Development Product and Process Validation Feedback, Assessment and Corrective Action

Plan and Define the Program- Input Voice of Customer Business Plan/Marketing Strategy Product/Process Assumptions Product reliability Studies

Product Design and Development - Input Design Goals Reliability and Quality Goals Preliminary BOM Preliminary