GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 Martin Nordby1 Martin Nordby Stanford Linear Accelerator Center Stanford University.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.
Advertisements

GLAST LAT ProjectLAT Mgr’s meeting July 17-18, LAT Planning Meeting Mechanical Systems Marc Campell.
GLAST LAT ProjectQuarterly Review of the GLAST/LAT Project, August 14, 2001 Martin Nordby1 GLAST Large Area Telescope: Mechanical Systems Martin Nordby.
GLAST LAT ProjectLAT Face to Face, July 17-18, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Mechanical Systems Martin Nordby Stanford Linear Accelerator.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Schedule and Cost Electrical Ground Support Equipment Schedule and Cost Scott.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT Offline SoftwareWorkshop - SLAC, Jan , 2001 R.Dubois Lehman Review Feb Joint NASA/DoE review My understanding: –“The purpose of the.
GLAST LAT ProjectNovember 17, 2004 AntiCoincidnce Detector 1 GLAST Large Area Telescope: Face to Face Meeting November 17, 2004 AntiCoincidence Detector.
GLAST Large Area Telescope:
GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 1 GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 3 - Page 1 GLAST Large Area Telescope: I & T Peer.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom1 Elliott Bloom Integration and Test and Calibration Manager
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectMini-Review, 30 January 2003 LAT-PR-#####-## 1 I & T Responsibility LAT I&T, Verification, and Calibration Flow VibeRandom vibrate/sine.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
I&T&C Organization Chart
GLAST Large Area Telescope:
Peer Review Agenda (Suggested).
Electrical Ground Support Equipment Verification Test Support
Integration, Test, and Calibration
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
Integration and Test Organization Chart
1. Introduction and Overview
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration and Test Organization Chart
March ’05 Face to Face Meeting Introduction
LAT Environmental Test Planning and Design Review
Introduction and Overview
Overview Cost to Complete
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Martin Nordby Stanford Linear Accelerator Center Stanford University Integration and Test Manager Integration, Test, and Calibration

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby2 Integration, Test, and Calibration  I & T Work Breakdown and organization  I & T activity flow  Qualification & Verification testing  Calibration planning  Integration planning  I & T scheduling and milestones  I & T budget summary  Issues Outline

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby3 Integration and Test Subsystem Work Breakdown I & T Management –Coordinate I & T planning –Develop LAT I & T plan, to ensure flow of verification test activities Reliability and Quality Assurance –Collect subsystem verification test results –Manage LAT verification test assurance activities I & T Preparation –Prepare LAT I & T facilities –Develop calibration equipment Calibration Unit I & T –Prepare for and integrate Calibration flight modules –Prepare for and test Cal. Unit in electron, photon, and hadron beams Flight LAT I&T –Prepare for integration of flight LAT; fabricate and test all mechanical GSE –Mechanically integrate flight LAT –Plan for and execute environmental verification testing Mission I&T Support –Support planning and execution of Observatory I&T

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby4 Integration, Test, and Calibration Organization

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby5 Integration, Test, and Calibration Activities I & T “subsystem” is focal point of LAT integration activities –I & T team plans and manages activities –TKR, CAL, and ACD subsystem teams provide support for integration Total effort involves: –I & T Subsystem LAT integration planning and management Mechanical integration and GSE development Environmental test execution Calibration test equipment development –Mechanical Systems Environmental test planning LAT qualification testing –Electronics and Data Acquisition LAT electrical integration Performance test planning and execution Flight software verification testing Electrical GSE development, including calibration DAQ system –IOC LAT performance test planning GSE operations and support during LAT I & T –Science Analysis Software Calibration analysis software development

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby6 Integration, Test, and Calibration Activity Flow Assemble, integrate, test subsystem Qual Modules TKR, CAL Integrate LAT I&T, Elec Assemble, test subsystem EM modules TKR, CAL, ACD Assemble, integrate, test subsystem Flt Modules TKR, CAL, ACD Environmental and performance test LAT I&T, Elec, Mech, (IOC) Integrate and test GLAST Observatory I&T, IOC, (Mech), (Elec) Upgrade EM2 TEM’s into E-GSE for subsystem I&T Elec Develop, test EM2 Tower Electronics Modules (TEM’s)Elec Develop, test Qual TEM, SIU for Cal. Unit E-GSE Elec Develop, test Flt TEM’s, SIU’s Elec Develop, fab M-GSE for structural, thermal env. testingMech Develop, fab mechanical interface gauges Mech Develop, fab structural, thermal Qual units Mech Env. Test Therm-Mech Qual Unit (struc, thermal) Mech Upgrade M-GSE and plans for flight LAT env. testingMech GSEGround support equip. M-GSEMechanical GSE E-GSEElectrical GSE Cal.Calibration Unit EMEngineering Model Subsysteml I&T activities Calibration activities Electronics activities Mechanical Systems activities IOC pre-operations activities Science Analysis Software Prototype calibration equipment I&T, Sci Test calibration equipment and plans I&T, Sci, Elec Develop LAT calibration equipment and plans I&T, Sci, Elec Integrate Calibration Unit I&T, Sci, Elec Beam-Test Calibration Unit I&T, Sci, (IOC) Develop calibration analysis software SAS Develop Operations Software and E-GSE IOC

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby7 Qualification and Verification Test Planning Validation and Qualification –Incrementally validating models and qualifying processes –We are in-process on this plan Prototypes: electrical/mechanical prototypes being built and tested now, to validate analysis and develop fab. processes Engineering Models: CAL, TKR, ACD, Elec and Mech plan high- fidelity models which use processes planned for flight units Qual Units: actual flight qualification will be done bottom-up Verification and Acceptance Testing –Subsystem performance verified as part of the assembly process Provides immediate feedback for production line process control With world-wide production effort, this clarifies responsibilities Minimizes schedule and shipping risk if re-work is needed –Test as you build Uses modularity to our advantage, reducing risk of high-level failure/non-compliance

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby8 Subsystem Test Flow VibeRandom vibrate/sine sweepAccAcceptance test level AcAcousticPFQProto-flight qual test level T-CThermal-cycle at 1 atmosphereQualPrototype qual test level T-VThermal-vacuum cycle testProof.Load test at proof level EMIElectro-magnetic interference testEMEngineering Model Engineering model testsTMThermal model Qualification unit testsMMMass model Flight unit/spare testsGSEGround support equip. TKR: Vibe, T-V EM Module Qual TKR: Vibe, T-C EM Tray Qual TKR: Vibe, Ac, T-V Qual Tray PFQ TKR: Vibe, T-V Q1 Qual Module PFQ TKR: Q1 Module to Cal. Unit I&T TKR: Vibe, T-C All Flight Trays Acc TKR: Vibe, T-V F1-16 Modules Acc TKR: F3-16 to LAT I&T TKR: F1-2 to Cal. Unit I&T Tracker CAL: Vibe, T-V EM Module Qual CAL: Vibe, T-C F1-16 Modules Acc CAL: F3-16 to LAT I&T CAL: F1-2 to LAT I&T CAL: Vibe, T-V Q1 Qual Module PFQ CAL: Q1 Module to Cal. Unit I&T Calorimeter ACD: Vibe, Ac, T-C EM ACD Qual ACD: Vibe, Ac, T-V ACD/Shield Acc ACD: ACD to LAT I&T ACD: Vibe, T-V ACD/Shield TM PFQ ACD: ACD TM to Grid Qual Test Anticoincidence Detector

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby9 LAT System Test Flow Mech: Vibe Qual Grid + MM PFQ ACD: ACD TM from ACD build Mech: Flt Rad’s to Obs. I&T Mech: T-B Qual Grid,Flt Rads,TM PFQ VibeRandom vibrate/sine sweepAccAcceptance test level AcAcousticPFQProto-flight qual test level T-CThermal-cycle at 1 atmosphereQualPrototype qual test level T-VThermal-vacuum cycle testProof.Load test at proof level EMIElectro-magnetic interference testEMEngineering Model Engineering model testsTMThermal model Qualification unit testsMMMass model Flight unit/spare testsGSEGround support equip. Elec: Perf, EMI EM1 TEM, SIU Perf Elec: Vibe, T-V, EMI Qual TEM’s, SIU’s PFQ Elec: Flt TEM’s, to CAL fab Elec: Vibe, T-V, EMI Flt TEM’s, SIU’sPFQ Elec: EM2 TEM to TKR, CAL Elec: Qual TEM, SIU Cal. Unit I&T Elec: Qual SIU to Obs. I&T Elec: Flt SIU’s to LAT I&T Elec: Perf, EMI EM2 Test Bed, Flt SWPerf Electronics Mech: T-V EM Grid + Radiators Qual Mech: Vibe, Ac, Flt Radiators PFQ Mech: T-V Flt Radiators PFQ Mech: Proof test Flt Grid Proof Mech: Flt Grid to LAT I&T Mechanical Systems

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby10 LAT I&T Verification Test Flow I&T: Beam test Cal. Unit Cal Elec: Qual TEM, SIU from Elec TKR: Q1 from TKR fab CAL: F1-2 from CAL fab CAL: Q1 from CAL fab TKR: F1-2 from TKR fab TKR/CAL: F1,2 from Cal. Unit VibeRandom vibrate/sine sweepAccAcceptance test level AcAcousticPFQProto-flight qual test level T-CThermal-cycle at 1 atmosphereQualPrototype qual test level T-VThermal-vacuum cycle testProof.Load test at proof level EMIElectro-magnetic interference testEMEngineering Model Engineering model testsTMThermal model Qualification unit testsMMMass model Flight unit/spare testsGSEGround support equip. Calibration Unit I&T: T-V, EMI LAT Acc Elec: Qual SIU for elec GSE Elec: Flt SIU’s to LAT I&T CAL: F3-16 from CAL fab TKR: F3-16 from TKR fab Mech: Flt Grid from Mech ACD: ACD to LAT I&T I&T: LAT Calibration Cal I&T: Vibe/Ac LAT Acc Obs: Vibe/Ac Observatory Acc Obs: T-V Observatory Acc Obs: EMI Observatory Acc Mech: Flt Rad’s from Mech Flight LAT

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby11 Environmental Test Matrix Rev date: 26 Jan 01

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby12 Performance Test Matrix Rev date: 26 Jan 01

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby13 Calibration Planning “Calibration” means –Determining the fundamental response of detector elements –Determining the performance of the instrument Characterizing variations over range of operations environments Characterizing variations over time Calibration plan flows from the requirements: ground and on-orbit – integrated approach. Ground-based calibration effort is tightly coupled to the I&T plan: –sea-level muons and sources for detector elements –sea-level muons for LAT testing during environmental testing –beam tests in photon, electron, and hadron beams I&T and Calibration Planning Committee formed to: –develop systematic flow of requirements to detailed tests –develop Calibration Plan and I&T Plan –evaluate personnel needs, baseline schedule and budget –assess the facilities, equipment, and resources needed

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby14 Integration Planning Activities LAT integration planning –Planning for subsystem integration has been included in development of interfaces and LAT design integration –Started developing concepts for integration GSE LAT integration facilities –New clean room facilities being built at SLAC for GLAST –Facilities include I&T infrastructure Clean room with high bay Storage for flight hardware Environmental chambers for thermal-cycle testing Observatory integration support –LAT team has been involved in investigating options for Observatory integrating –LAT and Observatory require combined GSE and coordinated plans Concept of LAT Integration Frame

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby I & T Schedule Currently developing I&T schedule Scoping work Identifying key I&T milestones oEstablishing linkages to other subsystems oIdentifying key hand-offs with other subsystems

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby16 I&T Milestones Verification Test Plan Review06/15/01 TKR & CAL Modules A & B Ready for Integration into Calibration Unit05/15/03 TKR & CAL Modules 1 & 2 Ready for Integration into Calibration Unit08/01/03 Calibration Unit Beam Test Complete01/17/04 Flight Grid Ready for Integration10/01/03 Flight TKR & CAL Modules 3 & 4 Ready for Integration10/01/03 Flight TKR & CAL Modules 15 & 16 Ready for Integration12/24/03 Flight TKR & CAL Modules 1 & 2 Ready for Integration01/26/04 Flight ACD Ready for Integration01/26/04 LAT Instrument Ready for Environmental Testing04/09/04 LAT Instrument Pre- ship Review10/07/04 LAT Instrument Ready for Integration with Observatory12/22/04 GLAST Launch 9/05

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby17 Interim Integration & Test Cost Estimate* Escalated k$ *DOE/NASA funding Interim estimate based on Proposal cost estimate Currently developing and checking I&T cost estimate

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby18 Issues Integration schedule is tight –Integration plans are for just-in-time delivery of subsystem modules –Early and incremental verification testing assures high probability of performance when integrating the LAT –Subsystem delivery milestones are visible at the project level to ensure close tracking of progress leading up to LAT integration LAT and Observatory verification activities require close coordination –We have been working on coordinated test plans with mission office –Expect to advance this work during the upcoming accommodation study