GLAST LAT ProjectEGSE Peer Design Review, August 17, 2001 1 S. WilliamsEGSE Schedule and Cost Electrical Ground Support Equipment Schedule and Cost Scott.

Similar presentations


Presentation on theme: "GLAST LAT ProjectEGSE Peer Design Review, August 17, 2001 1 S. WilliamsEGSE Schedule and Cost Electrical Ground Support Equipment Schedule and Cost Scott."— Presentation transcript:

1 GLAST LAT ProjectEGSE Peer Design Review, August 17, 2001 1 S. WilliamsEGSE Schedule and Cost Electrical Ground Support Equipment Schedule and Cost Scott Williams Stanford University scott.williams@stanford.edu

2 GLAST LAT ProjectEGSE Peer Design Review, August 17, 2001 2 S. WilliamsEGSE Schedule and Cost Schedule The schedule is driven by the delivery of electronics hardware units. –EM1 –EM2 –FSW Testbed –Qualification Unit –Flight Unit Each provides increasing complexity and capability. Other major duties are –Support for FSW development –Support for T&DF development –Support for I&T activities

3 GLAST LAT ProjectEGSE Peer Design Review, August 17, 2001 3 S. WilliamsEGSE Schedule and Cost Evolutionary EGSE Development

4 GLAST LAT ProjectEGSE Peer Design Review, August 17, 2001 4 S. WilliamsEGSE Schedule and Cost T&DF Integration & Test, I&T

5 GLAST LAT ProjectEGSE Peer Design Review, August 17, 2001 5 S. WilliamsEGSE Schedule and Cost LAT I&T Plan

6 GLAST LAT ProjectEGSE Peer Design Review, August 17, 2001 6 S. WilliamsEGSE Schedule and Cost EGSE Development & Test

7 GLAST LAT ProjectEGSE Peer Design Review, August 17, 2001 7 S. WilliamsEGSE Schedule and Cost EGSE Deliverables Total Systems –Engineering Model 1 - 10 –Engineering Model 2/Qual Unit/Flight Unit - 4

8 GLAST LAT ProjectEGSE Peer Design Review, August 17, 2001 8 S. WilliamsEGSE Schedule and Cost Milestones EGSE PDR (Concept Review)08/17/01 LAT Instrument PDR10/24/01 DAQ Engineering Model 1 Development - EM1 EGSE Delivery11/01 Subsystem Development - EM1 EGSE deliveries03/02 LAT Instrument CDR 08/05/02 DAQ Engineering Model 2 Development - EM2 EGSE delivery09/02 Flight Software Testbed Development- FSTB EGSE Delivery12/02 Qualification Unit EGSE Delivery05/03 Flight Unit EGSE Delivery8/03 Transition to IOC Maintenance10/03 Calibration Unit Beam Test10/03 LAT Environmental Testing 05/04 MSI&T Support03/05

9 GLAST LAT ProjectEGSE Peer Design Review, August 17, 2001 9 S. WilliamsEGSE Schedule and Cost EGSE Schedule

10 GLAST LAT ProjectEGSE Peer Design Review, August 17, 2001 10 S. WilliamsEGSE Schedule and Cost EGSE Schedule

11 GLAST LAT ProjectEGSE Peer Design Review, August 17, 2001 11 S. WilliamsEGSE Schedule and Cost EGSE Schedule

12 GLAST LAT ProjectEGSE Peer Design Review, August 17, 2001 12 S. WilliamsEGSE Schedule and Cost EGSE Schedule

13 GLAST LAT ProjectEGSE Peer Design Review, August 17, 2001 13 S. WilliamsEGSE Schedule and Cost Labor Loading HEPL Staffing for IOC/EGSE includes hiring profile of 1 FTE staff in FY02, FY03 and FY04 until stabilizing at 5 FTEs in FY04. Total EGSE staffing is approximately 2 FTEs in FY02/03

14 GLAST LAT ProjectEGSE Peer Design Review, August 17, 2001 14 S. WilliamsEGSE Schedule and Cost Level 4 Budget by FY EGSE labor estimate is low and does not include configuring multiple systems

15 GLAST LAT ProjectEGSE Peer Design Review, August 17, 2001 15 S. WilliamsEGSE Schedule and Cost Issues & Mitigations Multiplicity of systems required to support parallel development efforts –Enforce commonality of basic infrastructure. –Provide data distribution over ethernet to support subsystem specific EGSE and engineering data displays. –Use COTS hardware and software as much as possible to control cost. KISS. –Leverage RTOS interface systems development off flight software development. –Leverage out-years EGSE maintenance from IOC. Initial need date of 11/01 is aggressive –Begin development immediately. –Leverage recent Balloon Flight EGSE development. –Obtain subsystem buy-in via IPT. Trade studies delayed by Balloon Flight –Perform in parallel to EM1 development


Download ppt "GLAST LAT ProjectEGSE Peer Design Review, August 17, 2001 1 S. WilliamsEGSE Schedule and Cost Electrical Ground Support Equipment Schedule and Cost Scott."