Geoff Pile FAC Review - Undulator 17 June 2008 LCLS Undulator System Status and Schedule Geoff Pile.

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
January 24, 2008 Heinz-Dieter Nuhn, SLAC / LCLS Undulator BLM PDR Review 1 Undulator BLM PDR Review Heinz-Dieter Nuhn, SLAC / LCLS.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Geoff Pile FAC Review - Undulator 12 November 2008 LCLS Undulator System Overview and Fabrication Geoff Pile.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
1 Arturo Alarcon 1 Undulator Controls Status FAC Undulator Controls Status Arturo Alarcon June 9, 2009.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
October 30, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
Marion White Magnets & Supports April 16, 2007 Undulator Magnets and Supports Status.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Bob Lill LCLS FAC June 16-18, 2008 RF BPM Status and Production Test Results.
Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector –Linac System Overview E. Bong LCLS FAC October 27, 2005.
Josh Stein Beam Loss Monitor Control LCLS Undulator Systems Beam Loss Monitor Control Interface Josh Stein LCLS Undulator Controls.
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Geoff Pile LCLS Und. System FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Update FAC Review October 29 th (30 th.
William Berg Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor William Berg ANL/APS Diagnostics Group.
Jose Chan FAC Review- LTU-DUMP Installation Status & 11/11/08 1 LTU-Dump Installation Status & Schedule.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zack Wolf BFW Fiducialization October 20, Beam Finder Wire (BFW) Fiducialization Zack Wolf, Dean Walters, James.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Joshua Stein LCLS Undulator 20 Feb 06 LCLS Undulator Controls ANL LCLS All-Hands Meeting February 20, 2006 Josh Stein Argonne.
D Walters Undulator Systems – BFW April 30, 2008 Production Status of the Quad Spool J Morgan – Engineer Bellows Module Soon-Hong.
Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters.
Josh Stein 29-Apr-08 Undulator Controls Undulator Controls Status Update Josh Stein LCLS Undulator Controls CAM/TL.
Notes from Tom’s visit 1. Controls is under-staffed 2. Common Diagnostics platforms (BPM, FCT, DCCT, BLM,…) 3. Where possible, ‘Smart’ Diagnostics, running.
January 22-24, LCLS Week 2 The Extruded Aluminum vacuum chamber…
LCLS Extruded Vacuum Chamber Status
LTU/Undulator Installation Status
A Cold SCU Phase-Shifter
LCLS Undulator System Detailed Report
Beam-Based Alignment Results
Undulator Scope, Management, and Organization
Electron Beam Systems ETC and Methodology
Undulator System Components Status Dean Walters
LCLS Undulator System Status and Schedule
Undulator Cavity BPM System Status
LCLS Undulator System Production Management
LCLS Undulator System Status
Heinz-Dieter Nuhn – LCLS Undulator Group Leader May 14, 2009
LTU/Undulator Installation Status
LCLS Undulator System Status and Schedule
Undulator Integration Test Status
Fixed Support Design & Testing
ThomX – Commissioning Meeting – 25/01/2018
Electron Beam Systems ETC and Methodology
LCLS Undulator System Detailed Report
Alignment Diagnostic System Status
LCLS Control System Personnel Linac & BC2 Controls progress
Undulator Systems Integration
LCLS e- Beams Systems Manager
Presentation transcript:

Geoff Pile FAC Review - Undulator 17 June 2008 LCLS Undulator System Status and Schedule Geoff Pile

FAC Review - Undulator 17 June 2008 Safety Minute Two really important statements – 1. Never Underestimate the Power of Co-incidence (There could be more safety issues less obvious than the one you are trying to negate) 2. ISM – Do what you say you do! Define the scope Analyze (ALL) hazards Develop/implement controls Perform the work within controls Feedback & improvement Even though you wear your PPE you’re not always as safe as you might think. This guy is wearing his face mask while arc welding. In this case, it’s almost as useful as an ashtray on a motorbike.

Geoff Pile FAC Review - Undulator 17 June 2008 All Argonne girder components are planned to be available at least 1 month before the P3 “Early Start” of Girder Assembly Schedule Considerations

Geoff Pile FAC Review - Undulator 17 June 2008 Controls Status and Schedule Controls – Work Remaining Undulator In-tunnel Rack (UIR) Intra Undulator Cables Electronic Interface Assembly (EIA)

Geoff Pile FAC Review - Undulator 17 June Controls Ongoing Work Completed

Geoff Pile FAC Review - Undulator 17 June 2008 Undulator In-tunnel Rack (UIR)

Geoff Pile FAC Review - Undulator 17 June 2008 Undulator In-tunnel Rack (UIR)

Geoff Pile FAC Review - Undulator 17 June 2008 Electronic Interface Assembly (EIA) ~1800 Intra Undulator Cables (pre-made/pre-tested)

Geoff Pile FAC Review - Undulator 17 June 2008 Undulator Magnets and Supports Undulators SLAC 7/2007) Support & Motion System - girder, cam movers & fixed supports 3/2008) X translation issue Quads and Correctors 4/2008)

Geoff Pile FAC Review - Undulator 17 June Magnets and Supports Ongoing Work Completed

Geoff Pile FAC Review - Undulator 17 June 2008 All 40 undulators were completed by July 2007

Geoff Pile FAC Review - Undulator 17 June 2008 Girder Manufacture at Metalex Critical Engineering and QA Oversight by Argonne Girders Assembled and Packed at Hi-Tech

Geoff Pile FAC Review - Undulator 17 June 2008 X Translation Stage, Limit Switches, and Adjustable Switch Actuator

Geoff Pile FAC Review - Undulator 17 June 2008 Obtaining X Translation Limits & Stops

Geoff Pile FAC Review - Undulator 17 June 2008 Tuning block modification

Geoff Pile FAC Review - Undulator 17 June Quads and Correctors 37 magnets and 2 sets of spare coils completed 4/08

Geoff Pile FAC Review - Undulator 17 June 2008 Vacuum Systems Vacuum Chambers produced Manufacture started September 2007 & ended May required 7 spares 1 LTT 5 sacrificed for surface finish measurements Monumental task, huge effort, successful ending. Interest has already been expressed in this technology by other projects around the world.

Geoff Pile FAC Review - Undulator 17 June Vacuum

Geoff Pile FAC Review - Undulator 17 June 2008 Inspection and correction of the LCLS VC end flange perpendicularity Inspection of the total length of the LCLS Vacuum Chamber

Geoff Pile FAC Review - Undulator 17 June 2008 Surface Finish Data of 46 Chambers… 33 required (7 spare – 5 sacrificed – 1 LTT) Desirable Acceptable Not Desirable Should Avoid Slope Criteria from H-D Nuhn adjusted for the oval shape Longitudinal: Transverse: The transverse rms slope tolerance is 60 mrad Extrusion #h (mm)rms transverse slope (mrad)rms longitudinal slope (mrad) Totals (rms)

Geoff Pile FAC Review - Undulator 17 June 2008 Diagnostic Systems BPM – BFW – BLM –

Geoff Pile FAC Review - Undulator 17 June Diagnostics - BPM

Geoff Pile FAC Review - Undulator 17 June 2008 BPM Testing at Argonne

Geoff Pile FAC Review - Undulator 17 June 2008 Beam Position Monitor Large effort- solved serious production problems Many brazing issues (differential thermal expansion) Window QA problems Multi-step Process now understood 8 now delivered to SLAC -remainder on track Promising World Class Diagnostic

Geoff Pile FAC Review - Undulator 17 June Diagnostics – BFW & BLM

Geoff Pile FAC Review - Undulator 17 June 2008 Beam Finder Wire All production problems are resolved at this point, but we were somewhat delayed due to issues with repeatability, chamber coating, and electronic modules. Two units that should have shipped last week are on the way to SLAC at this time. Details in Dean Walters’ talk

Geoff Pile FAC Review - Undulator 17 June 2008 Beam Loss Monitor Five production BLMs will be used to protect the undulators by inhibiting beam bunches following an “above-threshold” radiation event. A joint R&D effort is aimed at enhancing these 5 units to enable LCLS to track each undulator’s accumulated radiation dose. Undulator protection is the highest priority. The BLM will be integrated into the Machine Protection System (MPS) and requires only limited dynamic range from the detectors. Dose tracking will enable long-term magnet damage to be characterized, but requires a radiation detector with large dynamic range (order of 10 6 ) and sophisticated diagnostics hardware and software. 30 production BLMs may be built in FY09 if R&D is successful

Geoff Pile FAC Review - Undulator 17 June 2008 BLM in Inserted Position (Can be easily made to track out with Undulator) Interface Module Beam Loss Monitor

Geoff Pile FAC Review - Undulator 17 June 2008 Long Term Test

Geoff Pile FAC Review - Undulator 17 June 2008 Long Term Test

Geoff Pile FAC Review - Undulator 17 June 2008 Long Term Test

Geoff Pile FAC Review - Undulator 17 June 2008 Status and Schedule Undulator System Management and Integration CPR & Costs to go – Generally in good shape. Some unplanned effort has been required in the last two months to solve problems and meet production schedules. Most spares costs were moved to OPC. Final spares costs will be recalculated using actuals and any required adjustments will be made. Green Sheet System A Web-based, almost real time, method of managing Argonne- APS cross- matrixed effort – (up to 60 staff  18FTE’s/year) ASK System A Web-based method of managing deliveries and technical documentation. A dictionary/index style look-up system.

Geoff Pile FAC Review - Undulator 17 June 2008 Summary Almost all deliveries complete by July 2008! Production BLMs? TBD (2009) Argonne Construction team rolls off the project in July Argonne Management team drops to half- time in mid-July, and rolls off the project in September. FY09 – a small budget is included for installation and commissioning support