Project Cycle Management (PCM)

Slides:



Advertisements
Similar presentations
Il Project Cycle Management :A Technical Guide The Logical Framework Approach 1 1.
Advertisements

Methodologies of monitoring and evaluating capacity development Makoto Kato Japan 1 UNFCCC Expert Workshop on Monitoring and Evaluating.
THE LOGICAL FRAMEWORK APPROACH
PROJECT CYCLE MANAGEMENT (PCM)
Results-Based Management: Logical Framework Approach
Project Cycle Management for International Development Cooperation Logical Framework approach Teacher Pietro Celotti Università degli Studi di Macerata.
Training on Project Development and Management
Action Logic Modelling Logic Models communicate a vision for an intervention as a solution to a public health nutrition (PHN) problem to:  funding agencies,
Results-Based Management: Logical Framework Approach
Results-Based Management: Logical Framework Approach
CASE STUDIES IN PROJECT MANAGEMENT
Monitoring Evaluation Impact Assessment Objectives Be able to n explain basic monitoring and evaluation theory in relation to accountability n Identify.
Proposal Writing for Competitive Grant Systems
Objective- and Strategic Analysis
1 CASE STUDIES IN PROJECT MANAGEMENT Lecture 3 Project management methodologies.
INTRODUCTION TO PROJECT PLANNING AND APPRAISAL SWOT ANALYSIS.
CONCEPT PAPER RESULT BASED PLANNING. RESULT-ORIENTED PLANNING Overall Objective/ Goal Specific Objective/ Purposes Expected Result/ Output Activities.
TEMPUS IV- THIRD CALL FOR PROPOSALS Recommendation on how to make a good proposal TEMPUS INFORMATION DAYS Podgorica, MONTENEGRO 18 th December 2009.
This project is funded by the EUAnd implemented by a consortium led by MWH Logical Framework and Indicators.
Lesson 5 – Logical Framework Approach (LFA)
Objective-Oriented Project Planning (ZOPP)
Evaluation in the GEF and Training Module on Terminal Evaluations
 Summary Presentation of Haiti  Norway’s Evaluation: Basic Information  Challenges Leading to Policy Level Findings  Lessons from the Norwegian Portfolio.
1 RBM Background Development aid is often provided on a point to point basis with no consistency with countries priorities. Development efforts are often.
Monitoring and Evaluation in MCH Programs and Projects MCH in Developing Countries Feb 10, 2011.
IPA Funds Programme Management sept Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına.
Developing Indicators
Project design & Planning The Logical Framework Approach An Over View Icelandic International Development Agency (ICEIDA) Iceland United Nations University.
INTRODUCTION TO PROJECT PLANNING AND APPRAISAL LOGICAL FRAME WORK PREPARED BY GEORGE BOTCHIE.
IPA Funds Programme Management sept Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına.
Pilot Project IEC Materials for Child Friendly City Endah Sri Rejeki INDONESIA.
Mothers unwilling to go to clinics Low staff skills Inadequate number of clinics Shortage of drugs High infant mortality rates Commercial pressure for.
MOD 6050 PROJECT MANAGEMENT AND FUND RAISING TOPIC – PROPOSAL WRITING AND FUNDRAISING (WK 6 &8) LECTURER: DR. G. O. K’AOL.
LOGICAL FRAMEWORK by Lorelyn T. Dumaug.
UNDAF M&E Systems Purpose Can explain the importance of functioning M&E system for the UNDAF Can support formulation and implementation of UNDAF M&E plans.
1 PROJECT CYCLE MANAGEMENT Gilles Ceralli TR Methodology – HI Luxembourg 06/2008.
Aaron Zazueta Chief Evaluation Officer 2013 EVALUATION IN THE GEF.
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Participatory Planning Project Cycle Management (PCM)
SUB-MODULE 1. INTRODUCTION TO THE RESULTS BASED LOGICAL FRAMEWORK RESULTS BASED LOG-FRAME TRAINING Quality Assurance and Results Department (ORQR.2 )
Project Management Learning Program July 2008, Mekong Institute, Khon Kaen, Thailand Project Design and Planning Sequence of Systematic Project Design.
Senior Evaluation Officer GEF Independent Evaluation Office Minsk, Belarus September 2015 Evaluation in the GEF and Training Module on Terminal Evaluations.
Screen 1 of 22 Food Security Policies – Formulation and Implementation Policy Monitoring and Evaluation LEARNING OBJECTIVES Define the purpose of a monitoring.
Scheduling and risk Icelandic International Development Agency (ICEIDA) Iceland United Nations University Fisheries Training Programme (UNU-FTP) Iceland.
Project Management Learning Program 23 Mar – 3 Aprl 2009, Mekong Institute, Khon Kaen, Thailand Managing for Development Results Results-Oriented Monitoring.
1 Tempus Tempus Workshop Sarajevo 7 June 2006 « Good practice in Preparing an Application » Anne Collette European Training Foundation Tempus Department.
Monitoring and Evaluation in MCH Programs and Projects MCH in Developing Countries Feb 9, 2012.
Logical Framework Approach 1. Approaches to Activity Design Logical Framework Approach (LFA) – Originally developed in the 1970s, this planning process.
1 Excerpts from the Presentation of Prof. Nihal Amerasinghe of AIM For the 1 st International Conference on Reproductive Health Management Developing Winning.
Logical Framework Approach An Evaluation Toolbox Presentation
Folie 1 Sarajevo, October 2009 Stefan Friedrichs Managing Partner Public One // Governance Consulting Project Management in the Public Sector Monitoring.
Developing a Monitoring & Evaluation Plan MEASURE Evaluation.
WORKSHOP ON PROJECT CYCLE MANAGEMENT (PCM) Bruxelles 22 – 24 May 2013 Workshop supported by TAIEX.
Marelize Gorgens The World Bank An M&E strategy Monitoring & Evaluation strategy Master & Execute Money and Energy is a waste of M&E that we do not M&E.
Building an ENI CBC project
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 3. Session 9. Periodic data collection methods.
Impact-Oriented Project Planning
The Logical Framework Approach
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 2. Session 6. Developing indicators.
Day 2 The LogFrame.
Dileep K Adhikary, PhD /PRAM Associates
Evaluation in the GEF and Training Module on Terminal Evaluations
Session 9 Recap on LFM and IL.
Helene Skikos DG Education and Culture
Good practice in preparing an application
Civil Society Facility and Media Programme Call for proposals: EuropeAid/162473/DH/ACT/Multi Webinar no. 3: Preparing effective Concept Note.
Integrating Gender into Rural Development M&E in Projects and Programs
How is an M & E framework derived from the logframe?
Gender Training Workshop Name of Institution Place Date
Presentation transcript:

Project Cycle Management (PCM)

Contents of this Presentation Mission What is the Project? What is the Project Cycle Management (PCM)? Why the PCM?, its history ? Project Design Matrix (PDM) 8 Steps for PDM in PCM

Our Mission and Promise in 6 Sessions “We will get SKILLs to develop a Project Design Matrix (PDM) by Project Cycle Management (PCM) approach”

What is Project? Objective Activities ⇒ Outputs Duration Budget(Input) Resources (Input) An Undertaking for the purpose of achieving established objectives, within a given budget and time period.

What is Project Cycle ? Project identification Project formation Appraisal Implementation Monitoring Plan revision Evaluation Feedback

Project Cycle Management Evaluation (See) Plan (Idea) Implementation (Do) PDM

Why Project Cycle Management ? Results-oriented – not activity driven Consistency Logically sets objectives and actions Participatory stakeholder involvement Transparency Shows whether objectives have been achieved: Indicators (for M&E) Framework for assessing relevance, feasibility and sustainability Describes external factors that influence the project’s success: assumptions and risks

History of PCM Method Late 1960s Logical Framework (USAID) ➢ International Agencies introduce the Logframe Early 1980s ZOPP (GTZ)  Objectives-Oriented Project Planning ➢ European countries adapt the ZOPP Early 1990s PCM(FASID/EC)

Project Design Matrix(PDM) Narrative Summary Objectively Verifiable Indicators Means of Verification Important Assumptions Overall Goal Project Purpose Outputs Activities Inputs Pre-conditions

PDM Vertical Logic Overall Goal Project Purpose Outputs Activities Direction that the project should take next Project Purpose  Objectives that the project should achieve within the project duration Outputs Strategies for achieving the Project Purpose Activities Specific actions taken to produce Outputs Important Assumptions Conditions important for project success, but that cannot be controlled by the projects. Whether these conditions develop or not is uncertain.

PDM Horizontal Logic Objectively Verifiable Indicators Standards for measuring project achievement. Means of Verification Data sources from which indicators are derived. Inputs human resource, materials, equipments, facilities and funds required by the project. Preconditions Conditions that must be fulfilled before a project gets underway

8 Steps for PDM in PCM Stakeholder Analysis SWOT Analysis Problem Analysis Objective Analysis Project Selection Project Design Matrix (PDM) Workplan Monitoring and Evaluation

STEP1 Stakeholders Analysis Stakeholder is any individual, group or organization, community, with an interest in the outcome of a programme/project. Key Question Whose problems or opportunities are we analyzing? Who will benefit or loose-out, and how, from a potential project intervention?

STEP2 SWOT Analysis SWOT analysis is a tool for institutional appraisal and a brainstorming exercise in which the representatives of the organization participate fully. This is to Assess the performance and capacity of the units or divisions of a organization

STEP3 Problems Analysis Problems Analysis visually shows the causes and effects of existing problems in the project area, in the form of a Problem Tree. It clarifies the relationships among the identified problems.

STEP4 Objectives Analysis Objective Analysis clarifies the means-ends relationship between the desirable situation that would be attained and the solution for attaining it. This stage also requires an Objective Tree.

STEP5 Project Selection Project Selection is a process in which specific project strategies are selected from among the objectives and means raised in Objectives Analysis, based upon selection criteria.

STEP6 Formation of the PDM The project design Matrix (PDM) is formed through elaborating the major project components and plans based on the approach selected. The format of PDM is similar to that of the Logical Framework, and therefore can be commonly used worldwide. Narrative Summary Objectively Verifiable Indicators Means of Verification Important Assumptions Overall Goal Project Purpose Outputs Activities Inputs Pre-conditions

STEP7 Workplan / Plan of Operations The Plan of Operation is prepared by the project implementers, based on the PDM and other information. It is an effective tool for project implementation and management, and provides important data for monitoring and evaluation of the project.

STEP 8 Monitoring and Evaluation WHY DO WE HAVE TO DO THIS? Strengthens accountability and transparency Provides information for effective management Helps determine what works well and what requires improvement Builds knowledge