LCLS Transition to Science DOE Status Review of the LUSI MIE Project The Instrument Readiness Review Process John Arthur LCLS Experimental Facilities Division.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Authorization Basis Steve Hoey, NSLS-II ESH Manager Project Advisory Committee February 8-9, 2011.
Advertisements

LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
FAC 4/20/06 D. Schultz 1 The SAD and ARR for Commissioning The Status of the SAD Being written as a part of the SLAC Linac SAD The Status of the ARR Design.
David Schultz Accelerator Nov. 12, ‘08 SLAC National Accelerator Laboratory 1 Accelerator Readiness ARR scheduled for Dec.
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
Jochen R. Schneider AMO Proposal June 2, LCLS User Access Policy Goals Scientific thrust areas - Instrument Teams.
John N. Galayda LCLS Facility Advisory November 11, LCLS Update November 11, 2008 Construction Status LCLS Instruments.
John Arthur X-ray November 11, 2008 SLAC National Accelerator Laboratory 1 X-ray Overview LCLS Directorate structure.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
John Arthur LCLS September 26, 2005 John Arthur SLAC LCLS Construction and Science.
J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 LUSI Overview J. B. Hastings January 2007 Lehman Review Response to Lehman Review.
John Arthur X-ray June 17, X-ray Overview XTOD current status XES current status Schedule to first experiments.
Diffraction studies of stimulated dynamics (pump-probe) Coherent-scattering studies of nanoscale fluctuations Atomic, molecular and optical science High.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
August 4, 2009Radiation Safety Committee Operational Radiation Safety Program for the NEH A.A. Prinz, J.C. Liu and J. Vollaire.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
John Arthur Photon October 18, 2005 LCLS Photon Systems Status John Arthur SLAC.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
John Arthur X-Ray Endstation April 29, 2004 X-Ray Endstations Overview John Arthur.
1 T. Fornek 1 LUSI CXI FIDR June 3, 2009 Thomas Fornek Project Manager June 3, 2009 LUSI Coherent X-Ray Imaging Instrument Final.
John Arthur PIXEL Project April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation.
1 T. Fornek 1 LUSI XCS FIDR June 17, 2009 Thomas Fornek Project Manager June 17, 2009 LUSI X-Ray Correlation Spectroscopy Instrument.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project Near term opportunities for LCLS 'upgrades' J. Hastings for the LCLS Experimental.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
1 Sébastien Boutet 1 Coherent X-ray Imaging Instrument FAC Meeting, June Coherent X-ray Imaging Instrument Sébastien Boutet.
Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.
LCLS NEH Operational and User Safety Programs
1 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Plans F. Willeke 9 th ASAC Meeting for NSLS-II Project February 1-2, 2012.
Status of LCLS A. Brachmann, SLAC National Accelerator Laboratory.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
John Seeman LCLS December 2, Conduct of LCLS Accelerator Operations John Seeman Assistant Director LCLS Directorate.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 1 From construction project to operating facility Structure.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Conduct of Operations Administrative Controls Ray Karol May 2010.
Workshop Overview, Charge and Deliverables Joachim Stöhr.
LCLS Facility Planning for LCLS-II. 2 LCLS vs. LCLS-II NowHXU - CuSXU - CuHXU - SCSXU - SC Photon Energy Range (eV)
James C. Liu 1 and Lawrence S. Walker 2 1. SLAC National Accelerator Laboratory, CA, USA 2. Brookhaven National Laboratory, NY, USA 1. Introduction ANSI.
1 David Schultz 1 SLAC Self-Assessment Programs meeting ASO Requirements David Schultz LCLS Program Division Director SLAC National.
Nadine Kurita LUSI DOE Review July 23, 2007 PMCS 1 Project Management Cost and Schedule Nadine Kurita ANSI/EIA-748-A Standard.
Mike Scharfenstein LUSI DOE Review August 19, 2008 ES&H Overview p. 1 LCLS Ultrafast Science Instruments (LUSI) M. Scharfenstein.
Audits & DOE Walkthroughs ISO and OHSAS surveillance audits August 18 th – 20 th –CD, ESH&Q, and FESS organizations to be audited Software.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
Planning for Succession
LUSI Coordination with LCLS
Experimental Facilities Planning
LCLS Ultrafast Science Instruments
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Linac Ops Budget Review LCLS Overview / Org Structure / Legacies
Stefan Moeller – XES Manager May 14, 2009
Thomas Fornek Project Manager July 15, 2009
John N. Galayda – Director, LCLS Construction May 13, 2009
Integrated Safety and Environmental Management
John Arthur – LCLS Experimental Operations
The Transition to User Operations
Linac Coherent Light Source Transition to Operations 11 July 2007
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Safety Program for LCLS Experiments
X-Ray Endstation Systems (XES) 2006 Schedule
Presentation transcript:

LCLS Transition to Science DOE Status Review of the LUSI MIE Project The Instrument Readiness Review Process John Arthur LCLS Experimental Facilities Division June 30, 2009

2 J. Arthur 2 IRR Process NEH ARR – June 30, 2009 An IRR is… Part of a layered approach for assuring safe, reliable, and efficient operation of LCLS Consistent with SLAC Guidelines for Operations Chap. 23, Accelerator Safety Reviews and Unreviewed Safety Issues Described in XFD document Motivated by plans to add 6 major instruments for x-ray experiments at LCLS over 3-year period A way to assure that all USI associated with new LCLS instruments have been identified and mitigated before starting commissioning of the instrument A tool that will also be used for reviewing major changes to instruments after they are operational

3 J. Arthur 3 IRR Process NEH ARR – June 30, 2009 An IRR is not… A replacement for normal SLAC WPC A replacement for the SLAC USI process Appropriate for minor repairs or changes to LCLS instruments Appropriate for review of each LCLS experiment

4 J. Arthur 4 IRR Process NEH ARR – June 30, 2009 IRR Process What is reviewed Documentation Physical inspection of instrument Qualifications of staff Product of review List of documents reviewed Record of presentations, interviews List of review participants Pre-start and post-start findings of review

5 J. Arthur 5 IRR Process NEH ARR – June 30, 2009 How IRR process is used Coordinated by Instrument Scientist Takes place when instrument is nearly complete, but allows time to address pre-start issues May require modification of SAD and/or ASE Modified SAD must be approved by SLAC Director Modified ASE must be approved by DOE SSO After all IRR pre-start issues are closed, LCLS Director authorizes start of commissioning

6 J. Arthur 6 IRR Process NEH ARR – June 30, 2009 Who is involved in IRR Instrument Scientist coordinates Radiation Physics group reviews shielding, beam containment issues SLAC safety committees review issues in their areas IRR committee has formal meeting to assess status of reviews, identify pre-start and post-start issues Committee composed of experts from SLAC and other DOE labs Invited by LCLS Director

7 J. Arthur 7 IRR Process NEH ARR – June 30, 2009 Tentative schedule for LCLS IRR’s AMO instrumentmid-July, 2009 SXR instrumentMarch, 2010 XPP instrumentJuly 2010 CXI instrumentJanuary 2011 XCS instrumentMay 2011 MEC instrument2012 IRR for early test phase of instrument may occur earlier

8 J. Arthur 8 IRR Process NEH ARR – June 30, 2009 Hutch 2 Hutch 3 soft x-ray lines hard x-ray line 10m Hutch 1 NEH lower level X-ray hutches and control rooms IRR for the AMO instrument AMO instrument

9 J. Arthur 9 IRR Process NEH ARR – June 30, 2009 AMO instrument Designed to focus LCLS x-ray beam, and study interactions between intense x-ray pulses and atoms or small clusters

10 J. Arthur 10 IRR Process NEH ARR – June 30, 2009 AMO IRR status Installation nearly finished Working with safety committees Collecting memos from committee chairs Tentative date for IRR: July 15 Choosing committee, organizing review

11 J. Arthur 11 IRR Process NEH ARR – June 30, 2009 End of Presentation