Venkat Srinivasan FAC: BFW Test Update 06/17/2008 1 Facility Advisory Committee BFW Calibration Test Results on behalf of: Jim.

Slides:



Advertisements
Similar presentations
Introduction to Pneumatic Components Build a Working Pneumatic Circuit
Advertisements

Evaporator Carbon coating. Evaporator Step 1 Check that all switches on control console are to OFF position. Automatic Vacuum Control knob should be.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
3” BACKWASH VALVE WITH SUPERSTAR ACTUATOR BASIC SERVICE MANUAL Does not apply to PLC-MP version SUPERSTARS.
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
New Mexico FFA Agricultural Mechanics Career Development Event Engine Power.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
October 30, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Geoff Pile, Dean R. Walters, Soon-Hong Lee,
Cryo Capture Cavity II Progress Mike McGee April 13, 2005.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
Zack Wolf BFW Fiducialization October 20, Beam Finder Wire (BFW) Fiducialization Zack Wolf, Dean Walters, James.
Air Operated Valve Calibration NMV21
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
Facility Upgrade Status at SSL, UCB Small Prototype Systems – 33mm Demountable Detector Body Parts arrived, cleaned. – 33mm Demountable Detector Test Flange.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Apex Target Marco Oriunno, April 23, Design and fabrication by: Marco Oriunno, Dieter Walz, Jim McDonald, Clive Field, Douglas Higginbotham, and.
Blade Tuner assembly Instruction for tuner assembly on a cryomodule May
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
MERLIN RIXS Endstation Design Review
Oct. 12, 2006 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
D Walters Undulator Systems – BFW April 30, 2008 Production Status of the Quad Spool J Morgan – Engineer Bellows Module Soon-Hong.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Alignment Tools Used To Locate A Wire And A Laser Beam In The VISA Undulator Project Wire Finder CALIBRATION A special fixture was constructed to calibrate.
Design Review RSXS - EndStation Review on Vacuum Chamber Stand and Supports Location Beamline Roll-up Endstation.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables) 19/03/2014Mathieu Therasse BE/RF/SRF1 Special Linac WG meeting:
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
A. Faus-Golfe, J.V. Civera, C. Blanch and J.J. García-Garrigós whit the help of the CTF3 Collaboration 1 CTF3 meeting Jan-09.
Josh Stein 29-Apr-08 Undulator Controls Undulator Controls Status Update Josh Stein LCLS Undulator Controls CAM/TL.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Status on behalf of: Keith Caban.
Mu2e Protection Collimator, PC Andy Stefanik January 19, 2016.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
new straw end plug: D=10.6 mm straws support frame Levan option
F.E.T.S. Mechanical Engineering Update
EBTF Design Review Technical Meeting Group
Sphere Option for Helical spring CF16 Bellows Adjustment bolts (horizontal plane) CF38.
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Beam Finder Wire Assembly Undulator System
XFEL Collimation and Beam Switchyard Vacuum Issues
XFEL Bunch Compressor BC1 and BC2 Vacuum Issues
Cryomodule Assembly Plan
Undulator System Components Status Dean Walters
BGC Collaboration Meeting –
Beam Finder Wire (BFW) Status
SNS PPU Cryomodule Space Frame
Presentation transcript:

Venkat Srinivasan FAC: BFW Test Update 06/17/ Facility Advisory Committee BFW Calibration Test Results on behalf of: Jim Bailey Keith Caban Clive Field Geovanni Gordon Tom Nakashima Danny Peterswright Reggie Rogers Donald Schafer Yung-Yung Sung

Venkat Srinivasan FAC: BFW Test Update 06/17/ BFW Assembly Mounted on Adjustable Support Adjustable Mounting Support (Modified since) Vacuum Pump Connector (2.75” Conflat Flange) Card Position Monitor (Limit switches) Air Supply Shut Off Valve Pneumatic Solenoid Valve Precision Screw Electrical Connectors for Wire Signals Vacuum Chamber Connection Flange (NW-50 CeFix w/Clamp) Beam Port Pneumatic Cylinder Alignment Fiducials Frame Compression Spring Positioner Potentiometer Housing Assembly model courtesy: J. Bailey, ANL

Venkat Srinivasan FAC: BFW Test Update 06/17/ BFW Card: Physics Overview (PRD r1) ParameterValueStatus Wires per BFW device22 Wire perpendicularity10 mrad~1 mrad (early microscope test on prototype) Wire diameter mm mm Carbon wires. Vertical position of Y-wire from Girder Axis (GA)0.20 mm mm [Sample average, BFW #7] Horizontal position of X-wire from GA0.40 mm0.412 mm [Sample average, BFW #7] Vacuum hardware clearance radius at target>2 mm Two independent methods to measure beam intensity at wire location: (1) beam induced wire current (2) Scattered particles NAOnly scattered particle detection in plan Y-wire vertical insertion reproducibility30 µm1 µm [Sample RMS, BFW #7] X-wire horizontal insertion reproducibility65 µm19 µm [Sample RMS, BFW #7]

Venkat Srinivasan FAC: BFW Test Update 06/17/ TaskStatus/Dates (6/17/08) Delivery of BFW assemblies from ANL 11 revised design BFWs received at SLAC (+2 old design). 2 more shipped as of 6/9/08 Fabrication of Bench Assembly for SLAC Alignment of BFWUsed for alignment of BFWs BFW electrical connectionsElectrical connections, ground connectors and RF shields: All RFI Fabrication of 40 BFW cards (Macor)RFI BFW Card Coating – Kovar (40 pieces)RFI BFW Card Wiring – Carbon wire, 40 piecesRFI BFW Card Installation and alignmentRFI BFW Assembly Pneumatics BoxesPut in system by P. Cutino for 33 BFW 90 psi airlinePut in system by P. Cutino for 33 BFW BFW Additional non-wired cards 7 BFW cards fabricated, cleaned and coated. Waiting to be wired if needed. BFW: Alignment & Assembly Status

Venkat Srinivasan FAC: BFW Test Update 06/17/ BFW: Alignment & Assembly Status Shipped from Argonne Total Received at SLAC In Transit RFIQC Testing in process Awaiting QC Awaiting retesting Old design BFWs (#16,17) 7 (#4,5,6,9,7,12,29) 1 (#24) 2 (#15,32) 1 (#13) 2 (#1,2)

Venkat Srinivasan FAC: BFW Test Update 06/17/ BFW Card Prototype Drawing Prototype material: Al-6061 Actual material: Macor Thickness: 3/16” (4.8 mm) Coating: Kovar [tooling in progress] X-wire end point: mm Beam center: 40 mm Gap between beam and X-wire: mm Y-wire end point: mm Beam center: 37.2 mm Gap between beam and Y-wire: mm Courtesy: C. Field, R. Rogers

Venkat Srinivasan FAC: BFW Test Update 06/17/ BFW Card Wiring: Tooling Copper Tabs Rods for hanging BFW wire with weights Micrometer stage BFW Card Card holder ‘Carbon wire & weight’ Wires soldered to copper tabs Wires from copper tabs connect to BFW feedthrough Feedthrough to be grounded and RF shielded Courtesy: C. Field, Y.Sung

Venkat Srinivasan FAC: BFW Test Update 06/17/ BFW Alignment Procedure at SLAC (outside Vacuum) Coordinate system definition Wire card positioning and alignment Transformation Factor from BFW tooling balls  wire card QC Instruction List

Venkat Srinivasan FAC: BFW Test Update 06/17/ BFW Alignment Procedure (in Vacuum) Wire position found using TB values Repeatability check Wire position check in virtual beamline coordinate system QC Instruction List

Venkat Srinivasan FAC: BFW Test Update 06/17/ BFW Test: Sample ‘Good’ Data, BFW #7 All Data, courtesy: SLAC QC, E. Lundahl, K. Caban, T. Nakashima X (<65) Y (<30) Wire191 TB549 TB6410 TB733 TB818

Venkat Srinivasan FAC: BFW Test Update 06/17/ BFW Test: Sample ‘Bad’ Data - old design of BFW #2 X (<65) Y (<30) Card Position (before vacuum) TB53178 TB63288 TB71875 TB818

Venkat Srinivasan FAC: BFW Test Update 06/17/ BFW Test: Sample Data, BFW #12 Vacuum Test 1 Measurement Method: Under Vacuum 200 cycles, 10 measurements, Random sampling Relaxation time between cycles: ~ 1 second X (<65)Y (<30) Wire14515 TB53376 TB63352 TB74115 TB84155

Venkat Srinivasan FAC: BFW Test Update 06/17/ BFW Test: Sample Data, BFW #12 Vacuum Test 2 BFW #12 RFI-ed Tested for repeatability at ANL (All units are tested at ANL) Wire position verified at SLAC Wire repeatability verified with delayed cycles (small sample size) at SLAC SLAC Procedure to calibrate devices using small sample size + delayed cycle measurement X (<65)Y (<30) ANL Wire Position Repeatability Test (100 cycles) 122 SLAC Wire Position (10 cycles)313 TB51922 TB61816 TB7116 TB81115 Measurement Method: Under Vacuum Another 10 cycles, 10 measurements, Consecutive sampling Relaxation time between cycles: ~ 1 minute

Venkat Srinivasan FAC: BFW Test Update 06/17/ BFW : Status Reminder Shipped from Argonne Total Received at SLAC In TransitRFIQC Testing in process Awaiting QC Awaiting retesting Old design BFWs (#16,17) 7 (#4,5,6,9,7,12,29) 1 (#24) 2 (#15,32) 1 (#13) 2 (#1,2) Process Time per Assembly: ~ 1 day

Venkat Srinivasan FAC: BFW Test Update 06/17/ ¼-20-UNC Screws 1 and 2 ¼-20-UNC Screws 3 and 4 This precision screw remains fixed Socket head screw loosens and tightens collar on precision screws Socket head for adjusting the precision screws Top View X-Precision Screws. Do not touch Y-Precision Screws 10, 11, and 12 ¼-20-UNC Screws 5, 6 and 7 (Brass washers under heads are not shown) Assembly model courtesy: J. Bailey, ANL

Venkat Srinivasan FAC: BFW Test Update 06/17/ BFW Assembly (Body Sectioned) Wire Card Down in Inactive Mode Wire card (Down Position) Lower Limit Switch (Actuated Position) Pneumatic Solenoid Valve (Cylinder Vent Position) Internal Return Spring (Expanded Position) Electrical Connectors (Down Position) Internal Kinematic Stop Plates (Open Position) Bellows Seal (Compressed Position) BEAM Potentiometer (Out Position) Assembly model courtesy: J. Bailey, ANL