GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,

Slides:



Advertisements
Similar presentations
ASPRS 2005 Annual Conference, Baltimore, Maryland Camera Calibration, Characterization and Contracting Guidelines: An Quality Assurance Perspective U.S.
Advertisements

Procurement Procedure for Goods and Services AI-OP-ADM-003 Required Training Module For: Managers Guest Services Associates Maintenance Lead Housekeepers.
Final/Shipout Inspection Approved for Public Release.
First Article Inspection Report
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
Quality Management System
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Safety Overview.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT Project Lessons Learned / Needed Procedures/ Documentation Control – October 23, 2003 B. Grist1 Lessons Learned / Needed Procedures / Documentation.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT ProjectEngineering Meeting, April 1, GLAST Large Area Telescope Engineering Meeting Quality Assurance And Manufacturing Preparations April.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
High Lights of SAP Business One for Manufacturing.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
First Article Inspection
Basics of Good Documentation Document Control Systems
GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
From Research Prototype to Production
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
1 GLAST Large Area Telescope Hardware Handling Jerry Clinton Chief Manufacturing Engineer Stanford Linear Accelerator Center
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
Controlled Storage Training Presented by Marcie Dickson Honeywell Quality Engineer NASA Safety and Mission Assurance
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
Thanks for giving me an opportunity to share with you our process for controlling media and other supplies. Disclaimer: We are not yet accredited to ISO.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 1 GLAST Large Area Telescope:
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – CowesDate:13/5/16.
Accelerator Readiness Review October 31, 2006
Bill Raynor Naval Research Lab
EFW DFB Systems Assurance
EFW DFB Systems Assurance
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – Cowes Date: 13/5/16.
Common Learning Blocks
Mechanical Integration
ISUAL Product Assurance
First Article Inspection
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope:
GLAST Large Area Telescope:
MODULE 3 STORE MANAGEMENT.
SQA01 Guidance Material: FAI Review
First Article Inspection
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
GLAST Large Area Telescope:
DOE Review of the LCLS Project October 2006
DOE Review of the LCLS Project 7-9 February 2006
Presentation transcript:

GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford, CA Gamma-ray Large Area Space Telescope

Procurement Process Flow

Manufacturing Requirements Drawings and specifications must be released Parts and materials must be listed on PIL and must be approved by PCB or MPRB as appropriate All parts and materials must be issued from flight stores Completed flight assemblies must be kept in flight stores Work must be authorized via an approved Assembly and Inspection Data Sheet (AIDS)

Manufacturing Process Closed loop –Parts and materials issued in kits from stores –Kit is assembled, tested, and inspected –Delivery of assembled kit to stores closes the loop –Maintains clear traceability of parts, materials, and finished flight items Approved AIDS is required to start the process –Applies to fabrication, assembly, test, and inspection Does not apply to fabrication where supplier procures raw materials –If work is to be performed by a subcontractor, their travelers should be attached, or PO should require supplier to make them available for review by SLAC and Government personnel

Manufacturing Process - Continued Stock room verifies item is ready for manufacturing prior to pulling kit –Drawings and/or specifications released –Test procedures released –Parts approved Completed AIDS ends the process –Last step is to deliver to stores

Assembly and Inspection Data Sheets AIDSs are LAT work orders –Authorize taking parts and materials out of stores and performing work to manufacture flight hardware –Defines operations executed to fabricate, assemble, and test LAT hardware items –Provide traceability from raw materials to finished flight items –Required for all LAT manufacturing activities including outside fabrication and assembly LAT-MD –AIDS preparation instructions –Provides some guidelines on work instruction preparation Accessed from Quality Assurance web page

AIDS List Screen

AIDS Entry Screen (Top Portion)

AIDS Entry Screen (Bottom Portion)

Check Screen

AIDS List with New Record

Report Screen

Update Screen

Updated Report Screen