GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650) 926-8531.

Similar presentations


Presentation on theme: "GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650) 926-8531."— Presentation transcript:

1 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC esteyb@slac.stanford.edu (650) 926-8531 Gamma-ray Large Area Space Telescope GASU/PDU MRR Part 2

2 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 2 Parts, Materials, and Processes EEE Parts –All EEE parts have been approved for use by the Program Parts Board –Status of PDU Box Level Parts Qualification, Rev. C1 (highlighted yellow items=part approved, not in use): Some columns have been hidden to assist in presentation reading

3 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 3 Parts, Materials, and Processes EEE Parts, cont’d –Status of PDU CCA Parts Qualification, Rev. Q (highlighted yellow =part approved, item not in use): Some columns have been hidden to assist in presentation reading

4 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 4 Parts, Materials, and Processes EEE Parts, cont’d –Status of PDU CCA Parts Qualification, Rev. Q, cont’d (highlighted yellow =part approved, item not in use): Some columns have been hidden to assist in presentation reading

5 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 5 Parts, Materials, and Processes EEE Parts –Status of GASU Box Level Parts Qualification, Rev. C (highlighted yellow items=part approved, not in use): Some columns have been hidden to assist in presentation reading

6 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 6 Parts, Materials, and Processes EEE Parts, cont’d –Status of GASU CCA Parts Qualification, Rev. Q (highlighted yellow items=part approved, not in use): Some columns have been hidden to assist in presentation reading

7 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 7 Parts, Materials, and Processes EEE Parts, cont’d –Status of GASU CCA Parts Qualification, Rev. Q, cont’d (highlighted yellow items=part approved, not in use): Some columns have been hidden to assist in presentation reading

8 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 8 Parts, Materials, and Processes EEE Parts, cont’d –Status of GASU PS CCA Parts Qualification, Rev. H (highlighted yellow items=part approved, not in use): Some columns have been hidden to assist in presentation reading

9 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 9 Parts, Materials, and Processes Materials –All Materials have been approved by the Program MPRB in accordance with LAT-SS-00107, LAT Mechanical Parts Plan GLAST/LAT Material Usage Agreement #002 (MAR DID No. 313; LAT Document # LAT-TD- 04756-01)- Approved 9/13/04 Processes –All processes have been reviewed and approved by the Program MPRB in accordance with LAT-SS- 00107, LAT Mechanical Parts Plan

10 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 10 Procurement Status Assembly Subcontractor –Aeroflex, Inc., Colorado Springs, Colorado was awarded the contract to provide the assembly service and CCA level thermal cycling for the PDU and GASU (Reference LAT-PS-04171, SOW LAT PDU and LAT-PS-03081, SOW LAT GASU) EEE Parts –All EEE parts are SLAC furnished and have been procured for the PDU and GASU –Outstanding receipt of Omnirel Regulator expected 2/25/05 »Part no. OMR9604SCK Miscellaneous Subassemblies –Internal harness and cable assemblies due ~ 3/14/05 Metal Fab Parts and Fasteners –All Metal Fab parts and Fasteners are SLAC furnished and have been procured and received for the PDU and GASU PWBs –The PWBs for PDU and GASU are SLAC furnished and have been procured and received. Coupons for boards being used for flight have all successfully passed testing.

11 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 11 Procurement Status FPGA Programming –Programming of the FPGAs has been contracted to ACTEL and is complete for 1 box each PDU and GASU. Remaining parts will be programmed after some level of confidence testing of the first article CCAs. Materials –Assembly shop floor materials are furnished by Aeroflex in accordance with drawing and SOW requirements (adhesives, conformal coating, wire, primer, etc.)

12 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 12 Manufacturing Facilites Assembly contract has been awarded to Aeroflex, Inc., located in Colorado Springs, Colorado –Aeroflex specializes in the Manufacturing of Micro Electronic and Circuit Card assemblies. Aeroflex fabricates assemblies for aerospace, defense and commercial applications. They are an ISO 9001 (DSCC) certified company, founded in 1990 which merged with UTMC in 1996 A Quality Survey and Process Review was was conducted by SLAC and NASA Product Assurance on January 26, 2005 –Certifications / Qualifications: - ASQ Rocky Mountain Quality award - ISO 9001:2000 certified by the Defense Supply Center, Columbia –Aeroflex performs to the intent of the following documents, assuring Quality and Workmanship Acceptability: MIL-STD-2000A IPC-A-610 CLASS 3 MIL-PRF-38535 IPC/EIA J-STD-001C NASA 8739 series NHB 5300 MIL-STD-1686 MIL-HDBK-263 EIA-625 ANSI/ESD S20.20-1999

13 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 13 Manufacturing Facilites

14 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 14 Manufacturing Facilites

15 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 15 Manufacturing Facilites

16 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 16 Manufacturing Facilites

17 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 17 Manufacturing Process Flow-Aeroflex

18 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 18 Manufacturing Process Flow-Aeroflex

19 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 19 Manufacturing Process Flow-Aeroflex

20 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 20 Manufacturing Process Flow-Aeroflex A flow similar to PDU for GASU is under construction –All routers will be reviewed and approved by SLAC prior to production start

21 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 21 Configuration Management Required changes to documentation during the manufacturing phase at Aeroflex will be immediately documented on an NCMR and forwarded to SLAC for disposition All outstanding changes to documents will be incorporated and a new revision released into LAT DOCs prior to final inspection at each manufacturing level (CCA, Module)

22 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 22 Configuration Management All change notices will include full disposition of hardware Disposition of Hardware

23 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 23 Thermal Cycle Requirements at CCA Level Figure 1. Vibration Levels, Duration, and Spectra

24 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 24 PDU/GASU Qualification and Acceptance Test Matrix

25 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 25 Production Schedule

26 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 26 Production Schedule

27 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 27 Production Schedule

28 GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 28 Production Schedule