Kathleen Ratcliffe LTU Installation October 30, 2007 1 LTU Installation Coordination Kathleen Ratcliffe.

Slides:



Advertisements
Similar presentations
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Advertisements

Jose Chan FAC- Undulator System Installation & Assembly 10/30/07 1 Undulator System Installation & Assembly Schedule Jose.
Kathleen Ratcliffe BC2/Linac Installation April 16, BC2 / Linac Installation Coordination Kathleen.
Jim Turner LCLS Accelerator Readiness Review December 2, LCLS Safety Systems Acceptance J. Turner, for the LCLS and SLAC.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
FAC 4/20/06 D. Schultz 1 The SAD and ARR for Commissioning The Status of the SAD Being written as a part of the SLAC Linac SAD The Status of the ARR Design.
David Schultz Accelerator Nov. 12, ‘08 SLAC National Accelerator Laboratory 1 Accelerator Readiness ARR scheduled for Dec.
Jose Chan and Kathleen Ratcliffe FAC Review- LTU/DUMP installation Status & 6/16/08 1 Linac Installation Status, Schedule.
LTU & Electron Beam Dump Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Technical Design.
Jose Chan FAC - BC2/Linac Installation Status & 4/16/07 1 BC2/Linac Installation Status & Schedule Jose Chan.
1 David Saenz 1 Hutch Construction in FEH June 08, 2009 Hutch Construction in Far Experimental Hall David Saenz – Project Manager.
Costing Meeting Ajit Kurup 13 th June Page 2 Costing Meeting 13 th June 2011 Ajit Kurup Summary of CERN costing workshop. Proposed Level 3 breakdown.
Richard M. Boyce FAC April 16, LCLS Installation & Planning Integration process – IMT 2007 Installation Planning BTH.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
Safety Oversight for SLAC Accelerator Department Operations
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
Mike Scharfenstein FAC Review - November 11, 2008 SLAC National Accelerator Laboratory 1 Environment Safety & Health Status.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center 1 LCLS Linac TDR, December.
Component Specification Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Jose Chan FAC Review- LTU-DUMP Installation Status & 11/11/08 1 LTU-Dump Installation Status & Schedule.
T. Montagne LTU – Beam Dump Installation April 16, LTU and Beam Dump Installation April 16, 2007.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.
Hamid Shoaee LCLS Control April 20, 2006 LCLS Control System Organization & Integration with the rest of the lab, Accelerator.
C.E. Rago Inj/Lin Design & 4_20_06 1 Injector / Linac Design & Fabrication C.E. Rago FAC Review 04_20_06.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
M. Scharfenstein - ES&H Coordinator 8 June 2009
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
Hamid Shoaee LCLS Control April 20, 2006 LCLS Control System Controls Organization Overview A Progress Report Hamid Shoaee.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
1 BROOKHAVEN SCIENCE ASSOCIATES Preparations for Linac Commissioning Ray Fliller, Associate Physicist 8 th ASAC meeting for NSLS-II Project May 10-11,
From Research Prototype to Production
Lawrence Livermore National Laboratory This work performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
1 1. Some recent views ( ) 2 Linac tunnel
1 NSTX Outage - Plan 1. 2 NSTX Outage – Diagnostic considerations 2 1.Erik Perry will be the manager of the construction activities in the Test Cell.
Jose Chan 2007 Downtime PMOG 5/16/ Downtime PMOG Review Jose Chan.
1 Enzo Carrone 1 NEH Safety Systems NEH ARR 2009 NEH Safety Systems Enzo Carrone June 30 th, 2009.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
Mike Scharfenstein LUSI DOE Review August 19, 2008 ES&H Overview p. 1 LCLS Ultrafast Science Instruments (LUSI) M. Scharfenstein.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
Overview of FESHCom Subcommittees Don Cossairt, Radiation Protection Manager, ESH&Q Section October 1, 2013.
ESS licensing process and Readiness Reviews
CBETA Technical Review
Undulator System Installation
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
Far Experimental Hall Hutches Civil Construction
Far Experimental Hall Hutches Civil Construction
Electron Beam Systems ETC and Methodology
Injector / Linac Installation Current Status
Shutdown Planning & Installation Schedule
E-Beams Systems Manager
Installation Status & Operational Readiness Process
LCLS e- Beams System Overview
BC2 / Linac Installation Coordination Kathleen Ratcliffe
LINAC System Engineering / Design Status C.E. Rago
LCLS e- Beams Systems Manager
Presentation transcript:

Kathleen Ratcliffe LTU Installation October 30, LTU Installation Coordination Kathleen Ratcliffe

Kathleen Ratcliffe LTU Installation October 30, Agenda LTU Installation Coordination Objectives Overall Schedule Documentation and Release Issues and Concerns Close Out / Action Items

Kathleen Ratcliffe LTU Installation October 30, Responsibilities Mike Saleski / Safety Systems Chan / Linac Project Management Ratcliffe / Installation Manager Tim Montagne / LTU Area Design and Integration Phil Cutino / LTU Water Bob Law and Jesse Saldivar/ LCLS CF Ponciano Rodriguez / Cable Installation Bob Fuller / Controls Checkout

Kathleen Ratcliffe LTU Installation October 30, Installation Objectives Install, Check out, and Control all components and systems for LTU Beamline components represented by Emma’s current MAD Deck All other that is necessary for safe and reliable commissioning Water, Vacuum, AC Power, Air, Purge Gas, RF Systems Safety Systems Radiation Shielding, BCS, MPS, and PPS

Kathleen Ratcliffe LTU Installation October 30, Overall Schedule P3 consistent with Installation Schedule Start Date 1/3/2008 End Date 8/18/2008 Schedule Considerations: Hardware availability Davis Bacon / Cable Pulling / Stand Installation General Laboratory Resources

Kathleen Ratcliffe LTU Installation October 30, Special Conditions Co occupancy with contractors Aggressive installation schedule No allowance for schedule drift Temporary lighting

Kathleen Ratcliffe LTU Installation October 30, LCLS LTU Installation Schedule

Kathleen Ratcliffe LTU Installation October 30, BOM

Kathleen Ratcliffe LTU Installation October 30, Documentation Status LTU Status Design and Integration Engineering – Tim Montagne and Venkat Srinivasan Three designers currently assigned to this area Design of components and supports is 85% complete PDR’s and FDR’s of all diagnostics are complete PDR’s and FDR’s of structural engineering are complete First samples of drift chambers are in test Everson Tesla magnets are in magnetic measurement testing Support stands released to fabrication

Kathleen Ratcliffe LTU Installation October 30, LTU Section 71

Kathleen Ratcliffe LTU Installation October 30, LTU Section 71

Kathleen Ratcliffe LTU Installation October 30, Documentation Status

Kathleen Ratcliffe LTU Installation October 30, Documentation Status

Kathleen Ratcliffe LTU Installation October 30, Product Assurance & Safety Following safety documents are required prior to installation or operation Safety Overview Approval Work authorization approval from LCLS Penetration permits Earthquake approvals Building inspection approvals Electric safety approvals RP approvals Non-ionizing approvals

Kathleen Ratcliffe LTU Installation October 30, Issues and Concerns Installation Installation is dependent upon co-occupancy in December and that conflicts with facility final construction Might need to install vacuum hardware when core drilling is taking place Temporary lighting and power