LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Status of the TRD at CERN as of July 2007 TRD Group Physikalisches Institut Universität.

Slides:



Advertisements
Similar presentations
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 The TRD Ethernet network at Point 2 David Emschermann Physikalisches Institut Universität Heidelberg.
Advertisements

André Augustinus 5 March 2007 Infrastructure status.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
Status at P2 C. Lippmann Jan. 22, 2007 TRD DCS workshop at PI, Heidelberg.
The ALICE TRD - HVDistribution System A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
DCS workshop CERN, Mar 5, 2007 Kai Schweda 1 TRD Status Kai Schweda, University of Heidelberg B. Doenigus, J. de Cuveland, T. Dietel, D. Emschermann, M.
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
DCS - general Unscheduled power cut Wed. morning ( , human error) –DCS (and HLT) off, due to UPS on bypass –In the middle of DB migration, had.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
15 April th ALICE RRB J. Schukraft 24 th ALICE RRB Collaboration News Project Status  Production (TOF, TRD, PHOS, PMD)  Installation  Commissioning.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
1 DCS Status & Plans 22 June 2004 L.Jirdén. 2 URD Status DCS Detectors TOF SPDSDDSSD TPCTRDZDCPMDHMPITS PHO CPVCAL FMDV0T0 TRATRG MU ACCEMC HV LV FEE.
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
S. K. PalDCS WORKSHOP 17 JUN 2002 FRONT VIEW PMD Layout and Design Two planes: Veto + PreShower Gas detector with hexagonal cells Cell cross section: 0.22.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
André Augustinus 16 June 2003 DCS Workshop Detector DCS status Overview and news.
ALICE 5 o’clock meeting Wk INDICO You’ll find this meeting here: – The full shutdown planning.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
TC meeting P2 planning wks 3&4 A.Tauro
ACO & AD0 DCS Status report Mario Iván Martínez. LS1 from DCS point of view Roughly halfway through LS1 now – DCS available through all LS1, as much as.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
(Alice COsmic Ray Detector) Status Report
TS2 preparatory meeting
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
Fiber Installation for RUN 3&4
ALICE 5 o’clock meeting Wk
Alice TPC DCS.
TPC Detector Control System
Presentation transcript:

LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Status of the TRD at CERN as of July 2007 TRD Group Physikalisches Institut Universität Heidelberg

LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 TRD sector 08 There is 1 TRD super module installed in sector 08 since October 2006.

LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 TRD sector 08 status This TRD super module is operational since end of March 2007.

LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 What TRD prepares for in 2007 Services will be prepared assuming the TRD detector will consist of 4 SM by end of 2007 : sector 00 sector 00 sector 08 sector 08 sector 09 sector 09 sector 17 sector Next 3 SM installation slot is scheduled for Sept/Oct 2007.

LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 TRD-O-Meter The TRD-O-Meter gives an overview on the status of the TRD infrastructure at Point 2.

LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Sector 08 full cabling on C-side is 2-3 days of work mounting and testing

LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/ SPD EXD 4/29 EXD 5/29 MTR TOF TRD TPC Sniffers T0 TS/EL ACO FMD TRD TOF 7 0 MTR TOF SPD EXD 2/29 MCH TPC TRD TRI EXD 3/ Beam Vacuum MCH EXD 6/29 EXD 7/29 MTR TOF TRD TPC SSD SPD TRD TOF HMP SSD TS/EL HMP PHS SPD TPC PMD TRD TOF TRD TOF Sniffers TPCTOF SDD SPD CPV SSD 21 SSD EXD 1/29 TRD SDD TRD TS/EL Vacuum TS/EL V0 TS/EL Beam TRI EMC MTR TRI MCH LV CP GP LV SP RO LHV LV TR RO LV TRLV HVCO LV CO LHV COLV SPRO SPLVCO LV HV GAS LV PWRSIG LV SP LV SPRO DET SP CP GP LV CTP LV CTP mult CT LV TRD Racks in UX25 A I O C L3 Magnet LV TRD racks

LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 LV power supply installation 78/89 power bins are 78/89 power bins are installed at Point 2 installed at Point 2 26/90 Wiener power 26/90 Wiener power supplies are mounted supplies are mounted 09/90 Wiener power 09/90 Wiener power supplies are operating supplies are operating sector 08 operating sector 08 operating sector 09 installed sector 09 installed sectors 00,17 sectors 00,17 available till end July available till end July GTU power operating GTU power operating PCU commissioned PCU commissioned

LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 HV power distribution 2 TRD SM can be 2 TRD SM can be operated standalone operated standalone from ISEG crates from ISEG crates using patch boxes using patch boxes as temporary HVDS as temporary HVDS replacement replacement new 32ch ISEG new 32ch ISEG HV modules for HV modules for 4 TRD SM will 4 TRD SM will be delivered by be delivered by end of August end of August (ATLAS Calo Type) (ATLAS Calo Type)

LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 LV Patch Panel for SM mounted on the mounted on the SM end cap SM end cap connects from connects from LV patch panels LV patch panels in Back-/Baby- in Back-/Baby- frame to SM frame to SM LV patch chord LV patch chord cabling is cabling is simplified and simplified and quicker quicker

LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 DCS network monitoring tools We developed monitoring tools for status control of: Wiener power supplies Wiener power supplies Netgear switches Netgear switches DCS boards DCS boards

LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Detector Control System

LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Installed at P2 mid April 07 SSDSPD TPC TRDTOFHMPPHOCPVMCHMTRFMDT0V0PMDZDCACOEMCDCS standard semi specific HV MON LV MON BOM RCK MON FEE CPU GPS VHVLV LED LIQ GMS LAS THR MOV HAL RAD SFM MON CCO LED FEE NMR HVD APD COO VME COO VEN GAS VME Central effort MON VME VEN GAS MON VME GAS THR IAS GTU PCU PTU TRG GAS VME COO VAC DSS TCO APD LVDFEL LAS CAM MIR SYN GPU SDDTRG VEN PVSS FSM Configured DVM TOR TRU

LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/ st Cosmic TRD-Events at P2 1 st event taken on 12 May st event taken on 12 May 2007 presently 5k cosmics taken presently 5k cosmics taken signal, reconstructed clusters signal, reconstructed clusters TRD-chamber time-0 planes TRD-chamber time-0 planes

LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Outlook  Complete Services for 4 SM(Jul 2007)  GTU commissioning with SM-I(Jul 2007)  Pre-trigger commissioning(Jul 2007)  SM-II commissioning(Aug 2007)  Comm. w/ CTP and trigger detectors(Aug 2007)  Cosmics data taking w/ SM-I and II(Aug 2007)  in total 4 SM installed(Oct 2007)