PALM-3000 Management Update A. Bouchez, J. Roberts Team Meeting #15 10/29/09.

Slides:



Advertisements
Similar presentations
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
Healthy Child Development Suggestions for Submitting a Strong Proposal.
Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting February 20, 2008.
PALM-3000 PALM-3000 Management Update Antonin Bouchez, Jenny Roberts Team Meeting #7 27 February, 2008.
PALM PALM-3000 project status 31 Jan COO All-Hands Mtg. Recent Milestones Requirements review on 12 Nov AO system offline for maintenance.
PALM-3000 P3K Team Meeting #16 Stephen Guiwits Dean Palmer, Ernest Croner, Antonin Bouchez Team Meeting # Cahill March 05, 2010.
PALM-3000 Management Update A. Bouchez Team Meeting #9 10/22/2008.
PALM-3000 Integration and Testing Status A. Bouchez Team Meeting #15 10/29/2009.
PALM-3000 PALM-3000 Status A.H. Bouchez, J.E. Roberts Project 1640 Las Vegas Summit 1/28/2010.
California Association for Research in Astronomy W. M. Keck Observatory KPAO Keck Precision Adaptive Optics Keck Precision AO (KPAO) SSC Presentation January.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
PALM-3000 Optical Bench Update Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss Team Meeting #15 10/29/2009.
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
PALM-3000 High-order Wavefront Sensor Update Christoph Baranec Team Meeting #9 10/22/2008.
PALM Project Jan COO All-Hands Mtg. Project 1640 is an infrared, coronographic integral-field spectrograph for high-contrast companion.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
PALM-3000 Instrument commissioning schedule Antonin Bouchez Team Meeting #7 27 February, 2008.
PALM-3000 PALM3000 Realignment Winter Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss, R. Dekany, M. Troy Layout.
PALM-3000 Budget and Schedule Update A. Bouchez, J. Roberts Team Meeting #10 1/8/2009.
National Finance Center’s 2008 Customer Forum EmpowHR 9.0 Billy Dantagnan Teracore.
RF Cavity / Coupling Coil Module
U.S. ATLAS Physics and Computing Budget and Schedule Review John Huth Harvard University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven.
All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer PSNC October 20, 2009, Garching.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
Server Virtualization: Navy Network Operations Centers
Coordination Strategy and Project Management NCAR working group model seems to work well –One WG for each major component of model –Software engineering.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Soft Tech Development Inc. 1 Software Project Tracking A CMM Level 2 Key Process Area Soft Tech Development Inc.
Atlanta Board of Education AdvancED/SACS “Required Actions” February 14, 2011.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
Market Implementation Board Presentation July – v1.1F 1 Texas Nodal Market Implementation ERCOT Board of Directors Meeting Program.
Version, Date, POC Name 1 Purpose: Concisely state the scientific objective of the proposed basic research proposal. Product/Results: Identify the research.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
TECHNOLOGY PLANNING FOR Mary Mehsikomer Division of School Improvement November 2006.
AstroGrid Oversight Committee MRC, London 30 July, 2002.
Lead from the front Texas Nodal 1 Texas Nodal Critical Path Update TPTF Date xxx.
OIRM Business Process Planning Overview for Business & Operations Advisory Committee May 27 – 28, 2015.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
Presentation to the Portfolio Committee on the Social Security Agency February 2005.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Abrasion Testing of Critical Components of Hydrokinetic Devices Monty Worthington.
Working Group 1: Evolving 911 Services Status Update September 21, 2015 Jeff Cohen, Co-Chair (APCO International) Susan Sherwood, Co-Chair (Verizon)
CIWQS Review Phase II: Evaluation and Final Recommendations March 14, 2008.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
Nodal Program Update Mike Cleary Sr. VP and Chief Technology Officer.
National Center for Supercomputing Applications Dark Energy Survey Collaboration Meeting Data Management Status December 11, 2006 Chicago Cristina Beldica.
Management February 20, Annual Review of the Muon Accelerator Program (MAP) Subcommittee members: Ron Prwivo, Ron Lutha, and Jim Kerby.
U.S. Department of Agriculture eGovernment Program February 25, 2003 USDA Presidential Initiatives Meeting Chris Niedermayer, USDA eGovernment Executive.
Usability Analysis Task Force Activity Update July 20, 2011.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
OMB Status 03/31/05 Monday, June 6, 2005 OMB Progress 03/31/05 Vicki Novak Tom Luedtke Gwen SykesPat DunningtonGwen Sykes Best in Government! Steps to.
Vendor Date VALU Monthly Project Review (VMPR) Project Name/IN #
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
Managing the Project Lifecycle
Concluding remarks E. Migneco
Presentation to the Portfolio Committee on the Social Security Agency
Enterprise Content Management Owners Representative Contract Approval
Linac Coherent Light Source Procurement
GLAST Large Area Telescope:
X-Ray Endstations Update
Preliminary Project Execution Plan
CV-SALTS Beneficial Use and Objective Study
Presentation transcript:

PALM-3000 Management Update A. Bouchez, J. Roberts Team Meeting #15 10/29/09

PALM Why are we building this again? Take a look at the recent NSF ATI proposal

PALM Since the last team meeting We are now 2/3 of way through the project (in terms of budget…further in terms of schedule!) Changes since last meeting First light move back to February 2011, with the system tear-down and rebuild beginning in July 2010 All component designs are complete. All PDRs have been held. External interim cost review was held in February

PALM Management Status The biggest concerns are the completion funding and staying on schedule Funding –FY10 funding is secure at both JPL and Caltech –JPL MOU report strongly recommended funding the MOU for another 5 years and specifically funding AO in FY10 and FY11 JPL has funded AO for FY10 –NSF ATI proposal to be submitted by Monday. Would cover 100% of COO FY11-12 funding, and 50% of JPL FY11. Schedule –Due to funding concerns, we must push to meet the schedule Control of requirements creep will be important Identify especially challenging requirements and discuss with management before spending months working on them

PALM-3000 External Review External Interim Project Review – February 2009 –Review of the management plan, scientific competitiveness and cost to completion –From review committee report: “The committee was impressed with the management and commitment of the PALM-3000 team.” “The past experience of the team in deploying the existing Palomar AO system gives us confidence that they can achieve the ambitious goals of the system.” –Only significant technical concern was the actuator deformable mirror (DM) delivery, which we have addressed

PALM FY10 effort distribution

PALM FY10 effort distribution COO Personnel Baranec - 5% Bouchez - 80% Bui - 25% Croner - 50% Dekany - 15% Hale - 50% Zolkower - 15% Palomar - 25% FTE

PALM FY10 Schedule Issues Critical Path(s) High-order deformable mirror procurement and testing Software development –High Order Wavefront Processor Electronics assembly and testing –Especially DM & motor cabling. Strategies Will need to track progress on these particular tasks closely. Management needs to clearly spell out when subsystems must be ready for integration into the testbed & final system. Team must inform us when unexpected problems arise.

PALM-3000 Schedule Overview

PALM Milestones Close servo-loops on I&T testbed: March 2010 Pre-ship review: June Decommission PALMAO: July First light: February 2011.