1 PALM-3000 PALM-3000 Management Update Antonin Bouchez, Jenny Roberts Team Meeting #7 27 February, 2008

2 PALM-3000 2 What are we building again? Phase 0 Reconfigure current AO system for 2 new back-end instruments: SWIFT and project 1640. Phase 1 Develop and deploy an “extreme” NGS-AO system, with 1-2 years lead over competitive projects (GPI, Sphere). Phase 2 Improved the LGS performance with an infrared tip/tilt sensor and visible truth wavefront sensor.

3 PALM-3000 3 Recent Progress Recent Milestones Requirements review on 12 Nov. 2007. AO system offline for maintenance starting 29 Nov. 2007. RTC procurement complete 14 Feb. 2008 Current Activities Relayout of AO optical bench for P1640 and SWIFT (Roberts, Burruss, Bui) –On track for commissioning with PHARO on April 9. High-order Wavefront Sensor design (Baranec) –Design in progress. Lab prototyping underway. Real-time wavefront reconstructor computer design (Truong, Guiwits) –Procurement complete. Hardware integration underway. Software architecture definition (Truong, Angione, Burruss, Cromer, Guiwits) –In progress. Electronics design (Guiwits, Croner, Cromer) –In progress. Instrument commissioning (Bouchez, Roberts, Burruss) –Planning. Interfacing with instrument teams.

4 PALM-3000 Budget overview (P3K Phase 1 only)

5 PALM-3000 Budget overview (P3K Phase 1+2)

6 PALM-3000 FY08 budget (Caltech) Caltech portion of budget: –MRI + COO support this FY: $793,000 (including contingency) –As of end Jan., $64,000 (35%) below budget profile.

7 PALM-3000 FY08 budget (JPL) JPL portion of budget: –JPL support this FY: $675,000 (including AO operations support) –As of end Jan., $5000 (3%) above budget profile

8 PALM-3000 Project Schedule (1)

9 PALM-3000 Project Schedule (2)

10 PALM-3000 Twiki site Structure –IPT section: Minutes and other meeting materials. –Project calendar: Link to Google calendar. IPT Leads should update meeting information. –Documentation section: Requirements, schedules, etc. Technical Products: Design documents. Security –All pages currently visible to the public (could be changed). –Protect sensitive documents using PDF passwords. Email lists –Use Technical Team list for general distribution. –IPT leads should post similar lists on IPT pages.

11 PALM-3000 Accounts and procurements Accounts divided by WBS category 1.Management, Systems Engineering. 2.Software, Electronics. 3.Optical Bench, DMs, Wavefront Sensors. 4.Commissioning. Caltech accounts –OIR.P3K-[task]-NSF.MRI –COO.P3K-[task]-… –Please charge COO account once it is available. Procurements –Contact Marcia Brown for procurements, cc. PM. –Distribute original packing slip to Marcia, copy to PM. –IPT leads should keep track of procurement expenses.

12 PALM-3000 Integration underway RTC computers & GPUs Reconfigured optical bench