The Wright Stuff Conceptual Design Review Colton Hall, Brendan Lee, David Thomas, Zak Collins, Eli Nelson, Devin Bazata September 20th 2011 Fall 2011 Rev.

Slides:



Advertisements
Similar presentations
Team Space Jam Launch Readiness Review Paul Guerrie, Ben Azlein, Megan Scheele, Bridget Chase, Shane Meikle, Taylor King, & Jamie Usherwood November 2,
Advertisements

Space Debris Conceptual Design Review Cole Bostrom Corey Godwin Jonathan Kirchmaier Emily Logan Sean Murphy Seanna Renworth
Team Space Jam Conceptual Design Review Ben Azlein, Bridget Chase, Paul Guerrie, Taylor King, Shane Meikle, Megan Scheele, Jamie Usherwood 09/16/10 Fall.
Team Space Jam Launch Readiness Review Paul Guerrie, Ben Azlein, Megan Scheele, Bridget Chase, Shane Meikle, Taylor King, & Jamie Usherwood November 2,
Team Members: Crawford Leeds, Tanya Hardon, Jacob Broadway, Devan Corona, Dylan Reed, Jannine Vela TEAM COCKSAT CONCEPTUAL DESIGN REVIEW.
DYNAMO TEAM 2 CAREFUL HARRY CONCEPTUAL DESIGN REVIEW GLENDA ALVARENGA J.J. BUSSE EMILY EGGERS ADAM KEMP GABRIELLE MASSONE DALTON SMITH COREY WILSON SEPTEMBER.
TEAM kkkkk Conceptual Design Review Saad Alqahtani, Charles MacCraiger, Alexa Warly, Connor Jacobson, Kyle Skjerven, Matt Busby 09/19/11 Fall 2011 Rev.
Team 2 Careful Harry Glenda Alvarenga J.J. Busse Emily Eggers Adam Kemp Gabrielle Massone Dalton Smith Corey Wilson Dynamo Critical Design Review.
Team 7, Final Presentation December 1, Mission Overview Send up petri dishes containing bacteria Analyze the effects of temperature, pressure, and.
BalloonSat “Optimism Prime” Team “Thumbs Up” Conceptual Design Review Nick Lenk, Greg Nelson, Eddie Cyrus, Jake Varey, Chase Pritchett, Brian Inglis 9/23/08.
Team D.S.R.O Taylor Boe Andrew Buckner Andrew Gilbert Gracie Harsha Emily Howard Bobby Stillwell September 23, 2008.
Khufu’s Starship Jennifer Nill Chelsea Donaldson Graham Risch Henry Shennan Jonathan Lumpkin Jennifer Nill Chelsea Donaldson Graham Risch Henry Shennan.
Daniel Sayle, Patrick Byrne, Sarah Kemp, Anna McLeland, Katie Thompson 11/2/10 TEAM MUNCHIES LAUNCH READINESS REVIEW.
Team Zephyr Critical Design Review Joseph Sheehey, Huy Le, Andrew Zizzi, Alex Morrow, Sam Evans, Logan Wright October 14, 2008.
Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn October 17, 2006.
Team Space Jam Critical Design Review Bridget Chase, Shane Meikle, Jamie Usherwood, Ben Azlein, Megan Scheele, Taylor King, and Paul Guerrie October 5,
Colton Hall, Brendan Lee, David Thomas, Zak Collins, Eli Nelson, Devin Bazata November 1, 2011 Team #7 The Wright Stuff Launch Readiness Review.
Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn December 7, 2006.
Cameron Trussel, Elliot Guber, Joel Mendez, Brady Phillips, Branden Campbell, and Dushyant Dhundara Conceptual Design Review for “The Stabilizer”
Space Debris Critical Design Review Cole Bostrom Corey Godwin Jonathon Kirchmaier Emily Logan Sean Murphy Seanna Renworth October 14, 2008 Fall 2008 Rev.
Final Presentation Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani December 5, 2006.
Garlic Armageddon BioSat Lauren Persons, Ryder Whitmire, Lenny Komow, Kirstyn Johnson, Jon Pfohl, Dave Borncamp October 6 th 2009.
Panoramic Rays Conceptual Design Review Brian Gonzales, Kaia Jerde, Harrison McLean, Anirudh Sarsam, Brett Traub, Matt Capron September 20, 2007.
Skillz That Killz Team 3 Conceptual Design Review Travis Dowdy, Jocelyn Mulkey, Hunter Hoopes, Taylor Smith, Kaitlyn Zimmitti, Jess Davidoff September.
Colton Hall, Brendan Lee, David Thomas, Zak Collins, Eli Nelson, Devin Bazata October 6, 2011 The Wright Stuff Conceptual Design Review.
Team Dionysus Critical Design Review Alijah Smith, Chris Koncilja, Elise Kowalski, Josh Tiras, Mike Beach, Becca Seigel 10/06/09.
Team R3D3 Conceptual Design Review Henk Wolda Kate Kennedy Greg McQuie Nicole Ela Marisa Antuna Devon Campbell Tyler Smith 9/20/2011.
GloboGym Fighting Cobras Conceptual Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards September 21, 2006 Project.
Critical Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani October 17, 2006.
Team SST Conceptual Design Review Eric James, Vlad Soukhovei, John Marcantonio, Kara Bongiovanni, Sean Rivera 09/16/10.
Amelia Weller, Erick Chewakin, Will Hakes, Emma Mossinger, Brendon Barela, Jason Schelz, Ethan Long October 5, 2010 TEAM MATE CRITICAL DESIGN REVIEW Fall.
Team DSRO Critical Design Review Taylor Boe Andrew Buckner Andrew Gilbert Emily Howard Grace Harsha Bobby Stillwell October 14, 2008.
Team Cutthroat Conceptual Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn September 21, 2006.
Launch Readiness Review 11 Nov Brady Phillips, Elliot Guber, Brandon Campbell, Dushyant Dhundra, Joel Mendez, Cameron Trussell.
Conceptual Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani September 21, 2006.
Critical Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards October 17, 2006 Project Frankenfine: A Near Space.
SSCSC- Team 8 Conceptual Design Review Nick Brennan, Kier Fortier, Tom Johnson, Shannon Martin, Adam Russell, Dylan Stewart 9/14/10 Fall 2010 Rev A
Space Debris Launch Readiness Review Seanna Renworth, Emily Logan, Corey Godwin, Sean Murphy, Cole Bostrom, Jonathan Kirchmaier November 11 th, 2008.
Conceptual Design Overview
Thomas Jeffries, Anthony Anglin, Dylan Cooper, Dustin Fishelman, Colin Harkins, Joao Mansur, Starteya Pais, Andrew Trujillo 10/2/2012.
SPIRIT of the Koala Project VOLT Critical Design Review Anthony Anglin, Colin Harkins, Dylan Cooper, Thomas Jefferies, Starteya Pais, Joao Mansur, Andrew.
Team Andromeda Lucas Ibarra Alexis Sutker Evan Long Jack Oblack Jaevyn Faulk Dylan Anderson Devon Connor Eric Hardwick 2 October 2012.
Hang Seven Critical Design Review Sierra Williams, Lucas Migliorini, Abby Caballero, Chase Goodman, Paul Smith, Becca Lidvall, Ethan Hollenbach, Nikhil.
Team Pegasus MSF: BalloonSat SatElysium Conceptual Design Review Jordan Burns Miranda Link Brenden Hogan Cody Spiker Chris Dehoyos Hemal Sewal September.
Team Muon Critical Design Review Jennifer Nill Chelsea Donaldson Graham Risch Jonathan Lumpkin Henry Shennan October 5, 2010 Fall 2010 Rev A/B
Chelsea Welch Tully Baetz Colin Nugen Elisabeth Moger Charles Hartman Anthony Cangelosi.
Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams September 23, 2008 Fall 2008 Rev A
Chelsea Welch Tully Baetz Colin Nugen Elisabeth Moger Charles Hartman Anthony Cangelosi.
Chelsea Welch Tully Baetz Colin Nugen Elisabeth Moger Charles Hartman Anthony Cangelosi.
Matt Breihan, Jay Davis, Jack Gregory, Ashton Schrage, Sara Schuette, and Lydia Whitney September 23, 2008.
Team Magnaritaville Conceptual Design Review Zachary Cuseo, Andrew Fruge, Shweta Maurya, Sydni Smith, Christopher Nie, Tyler Knappe 9/22/09 Fall 2009 Rev.
Victor Taberski, Ryan Walker, Allen Marshall, Matt Kerwin, Andrew Winthrop, Steven Ramm October 14, 2008 UANIOOU – (Upper Atmosphere Near-Infrared Optical.
Space Monkeys Conceptual Design Review Project Curious George Michael Bartek, Jacob Blakely, Katelynn Finn, Katie Fletcher, Lance Markovchick, Michael.
Team Hubble Jr. Critical Design Review Ryan Del Gizzi, Evan Levy, Kyle Norman, Chris Everhart, Holly Zaepfel, Rachel Small October 17, 2006.
PROJECT SCREAM PROPOSAL Josh Yeaton Kevin Dinkel Chris Kopacz Conrad Schmidt Chris Warren Dillon Thorse
Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin Wong 05 October 2010.
S.H.I.E.L.D. CRITICAL DESIGN REVIEW Addison, Travis, Jared, Evan, Aaron, Matt 10/14/08.
Quinn Kostelecky, Vincent Staverosky, Gloria Chen, Roshan Misra, Jacqueline Godina, Raymond Auyeung Fall 2011 Rev A/B
Conceptual Design Review Brandon Scott Bosomworth Edgar Alejandro Flores Vicki Wei Hsu Filip Maksimovic Scott Michael Randolph Jonathan Michael Taylor.
Team Go Go Gadgets Launch Readiness Review
Clean Air Project: Team Big Green SpaceGasm Conceptual Design Review
Space Debris Critical Design Review
Launch Readiness Review
Team Solkraft Conceptual Design Review
Team Mate Conceptual Design Review
Team Honey Badger Conceptual Design Review
Team Munchies Conceptual Design Review
Team SCREAM Launch Readiness Review
Proposal Team 8: Grant Fritz, Jessica Brown, Stephanie Jalovec, Jennifer McGraw, Brian Roth, Evan Townsend.
Panoramic Rays Critical Design Review
Presentation transcript:

The Wright Stuff Conceptual Design Review Colton Hall, Brendan Lee, David Thomas, Zak Collins, Eli Nelson, Devin Bazata September 20th 2011 Fall 2011 Rev A

Mission Overview Our BalloonSat has two main objectives. The first objective is to send petri dishes with bacteria growing on them into space to see how they are affected by the conditions of space. The three main factors that we think will affect the bacteria are temperature, ultraviolet radiation and extremely low pressure. The second objective is to collect bacteria living in the stratosphere. There have only been a few experiments concerning the bacteria living in the stratosphere and so there is very little known about them. What we hope to discover about them is what they use for energy, how they survive the UV radiation, and how they survive in the extreme cold.

Material List ItemPriceObtain from HOBO H providedprovided by COSGC active heater systemprovidedprovided by COSGC Canon SD780 ISprovidedprovided by COSGC 3 sheets of foam coreprovidedprovided by COSGC Parallax Standard Servo (P/N ) $14.29hobbyengineering.com 20 servo mounting screws$3.73rcslot.com 10 feet of Velcroprovidedprovided by COSGC 1 square foot sheet of plywood$2.50homedepot.com square plastic tube$9.65usplastic.com hollow circular plastic tube$15.54usplastic.com wireprovidedprovided by COSGC 3 batteries (9v)providedprovided by COSGC Extra batteries (9v)$23.98amazon.com 4 switches$12.00Newark.com

20 petri dishes$5.00scientificsonline.com O-ring$5.00Sears Basic Stampprovidedprovided by COSGC Aluminum foil$10.00Wal-Mart Bacteria (e. coli)$10.00sciencestuff.com Total$ Material List (continued) The remainder of the budget will be used for spare parts, for parts that may be bought as the satellite design evolves, and for other unforeseen expenses.

Basics of Design Foam core construction Aluminum foil insulation Rectangular prism shape 2 petri dishes on top (exposed) o heater beneath one Servo arm on top o holds a sterile petri dish o includes motor, plywood base, and plastic connector rod 2 petri dishes inside (Velcro connection) Heater, Basic Stamp, HOBO, camera inside Lithium batteries for power

Technical Drawings

Functional Diagram

09/17: Work on Conceptual Design Independently 09/20: Conceptual Design Due at 7:00 AM 09/24: Team Meeting (11:00 AM) 09/27: Hardware Ordering (Time by Appointment) 10/01: Team Meeting (6:00 PM) (Building) 10/04: Design Document Rev. A/B Due at 7:00 AM 10/04: Critical Design Presentation Due at 7:00 AM 10/08: Team Meeting (11:00 AM) (All tests except Freeze and Vacuum Test) (Building) 10/15: Team Meeting (11:00 AM) (Freeze Test) (Building) 10/18: Mid Semester Team Evaluation Due at 9:30 AM 10/19: Team Meeting (7:00 PM) (Vacuum Test and Repeat All Other Tests excepting Freeze Test) 10/23: Team Meeting (11:00 AM and 7:00 PM) (Redo any tests that need it) (Final Building) 10/25: Pre-launch Inspection/Bring all hardware to class 10/26: Team Meeting (7:00 PM) (Final Touch-ups) 10/27: In-class Mission Simulation Tests 10/29: Team Meeting (11:00 AM) (Final Touch-ups) (Work on LLR and DD) 11/01: LLR Presentations Due at 7:00 AM 11/01: Design Document Rev. C Due at 7:00 AM 11/02: Team Meeting (6:00 PM) (Final Touch-ups) 11/04: Final Balloon SAT Weigh-in and Turn In (Time by appointment) 11/04: DLC 270A and LRR Cards Due by 2:00 PM 11/05: LAUNCH DAY (4:45 AM - 4:00 PM) 11/05: Team Meeting (Upon Return) (Store Data from Launch) 11/08: Bring Raw Flight Data to Class 11/09: Team Meeting (7:00 PM) (Collect Data) 11/13: Team Meeting (6:00 PM) (Collect Data) 11/16: Team Meeting (6:00 PM) (Data/Prepare for Final Presentation) 11/17: HW 07 Due at 4:00 PM 11/27: Team Meeting (7:00 PM) (Prepare for Final Presentation) 11/29: Final Presentations Due at 7:00 AM/All Data Due in class 11/29: Final Presentation 11/30: Team Meeting (6:00 PM) (Finish Video and Design Document Rev. D) 12/03: ITLL Design Expo (9:00 AM - 4:00 PM) 12/03: Design Document Rev. D/Team Videos Due at Judging 12/06: Hardware Turn-in 12/08: HW 08 Due 12/14: Final Exam (4:30 PM- 7:00 PM) Schedule

Biggest Worries… o One of our biggest worries is being able to properly seperate the variables. Since we have to expose a petri dish to the UV and Cosmic radiation, we may run into problems involving temperature and the durability of the petri dish in a vacuum. o Another one of our worries is being able to get a solid vacuum seal on the petri dishes, seeing as an improper seal would invalidate all of our data.