Parsons Management Consultants – A Joint Venture

Slides:



Advertisements
Similar presentations
2007 Witnessed Remarkable Service Enhancements at Dulles
Advertisements

Client: Northwest Regional Airport Society Architect: Ulrick Laska Architectural Corporation Project: Expansion to airport terminal building including.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
M E T R O P O L I T A N W A S H I N G T O N A I R P O R T S A U T H O R I T Y 1 Mobility Challenges at Washington Dulles International and Ronald Reagan.
MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION
Yakima Air Terminal.  Project Overview  Project Schedule  Impacts  Project Status  Questions.
Update on FCPS Construction/Renovation Projects August 2009.
PUBLIC BORDER OPERATORS ASSOCIATION BORDER INFRASTRUCTURE PROJECT UPDATES Canada – United States Transportation Border Working Group Meeting Vancouver,
Presentation to SEC-AAAE Annual Conference Chicago Department of Aviation April 19, 2010.
Tuesday, February 8, 2011 GOAA CONSTRUCTION Upcoming Projects Mike Patterson, P.E. GOAA CONSTRUCTION Upcoming Projects Mike Patterson, P.E.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
November 14, 2014 Hobby International & IAH Terminal Redevelopment Program Update Jarrett Simmons, Assistant Aviation Director – Planning Houston Airport.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Public Border Operators Association Border Infrastructure Project Updates Canada – United States Transportation Border Working Group Meeting April 19 –
Yakima Air Terminal.  Project Overview  Project Schedule  Impacts  Project Status  Questions.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
Facilities and Infrastructure December 10, Barletta Construction: Parent Organization In 1914, Vincenzo Barletta, a recent immigrant from Italy,
Reconstruction of the Eads Bridge Highway Deck
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
AIRPORT A complex of runways and buildings for the
Talofa!! from American Samoa. American Samoa.
Ballina Byron Gateway Airport Presentation November 2012.
2009 PACIFIC AVIATION DIRECTORS’ WORKSHOP May 4 – 6, 2009
Washington Dulles International Airport
Maryland Transportation Authority (MDTA)
Presents Project Crimson March 1, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Current Construction Projects Major Projects Pinellas County.
Sectoral Coverage – Construction and related services Workshop on Scheduling Specific Commitments for Construction and related engineering services and.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Disclaimer – Any and all information contained herein is subject to change without notice 1 O’Hare Airfield Configuration EXISTING Airfield Configuration.
Maryland Transportation Builders & Materials Association Paul L. Shank, P.E.,C.M. Chief Engineer November 14, 2014 October 30, 2014.
Committed to providing safe, high quality water and related business services earning customer trust and confidence. Louisville Water Company Capital Program.
Pacific Aviation Directors Workshop March 13 – 15, 2012 Hosted by: A B Won Pat International Airport - Guam F ederal A viation A dministration DEPARTMENT.
San Antonio Airport System Overview Presented to the Airport Ground Transportation Association September 13, 2010.
Kelowna International Airport 2010 Development Program September 17, 2007.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
1 Management Report on Bradley West Project BOAC Meeting October 5, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
The Transformation Journey of Bahrain International Airport Mohamed Yousif Al Binfalah Chief Executive Officer Bahrain Airport Company.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
Energy Huntsville Opportunity Report and Government Collaboration February 2016.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
TOMMY OLIVER STADIUM John Bozarth February 23, 2016.
Energy Huntsville Opportunity Report and Government Collaboration April 2016.
SAN FRANCISCO INTERNATIONAL AIRPORT CONSOLIDATED ADMINISTRATION CAMPUS SFAC Civic Design Review – Informational Overview February 8, 2016.
Page 2 Salt Lake City International Airport – April 12, 2016 FY 2017 Budget Goals & Objectives - Budget Drivers  Implement the Terminal Redevelopment.
AS DOT&PF is responsible for the planning and construction of public works, expect court facilities. Public Facilities or Public Works include.
PRESENTATION TO: CITRUS COUNTY BOARD OF COUNTY COMMISSIONERS 11 AUGUST 2015 INVERNESS AIRPORT MASTER PLAN UPDATE.
City Council April 1, Capital Improvement Plan 1/14/2014Budget staff sent CIP forms and instructions to divisions 1/28/2014Projects submitted.
Columbus Airport Authority We’re Really Taking Off! November 6, 2002.
City Council March 6, Capital Outlay Priorities Infrastructure  Reconstruction of Bell St. from Concho River to Old Ballinger Hwy  Reconstruction.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
The 14-Gate Replacement Terminal Project at Hollywood Burbank Airport Presentation to the Construction Management Associates of America (CMAA) May 26,
White Pigeon Community Schools
Dallas Fort Worth International Airport: Travel. Transformed
PHX SKY TRAIN MAKING TRACKS IN THE ARIZONA DESERT
Charlotte Douglas International Airport
Proximity to Opportunity IAH New Terminal C North
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Terminals and Transport Interchanges
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
M&E SYSTEM.
Facilities Modernization Program
2007 Bond Issue Capital Improvement Program
Brencal Contractors Inc.
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Presentation transcript:

Construction Management at Ronald Reagan Washington National and Washington Dulles International Airports Robert Orkin Quality Assurance Manager Parsons Management Consultants

Parsons Management Consultants – A Joint Venture Parsons Management Consultants – A Joint Venture Parsons Transportation Group Inc. PB Americas, Inc. DMJM Aviation Delon Hampton and Associates, Chartered PMC on the Project Since 1988 Current Contract Awarded 2004 (5 Years plus 3 Year Option) Current 300 Staff from the Prime JV and other companies

Ronald Reagan Washington National Airport (DCA)

DCA – Major Design and Construction Projects Authority Office Building Expansion In-Line Baggage Screening at Concourse B/C Additional Deck for Garages A and B/C Runway Overlay – Runway 15-33/4-22 Runways Overlay – Runway 1-19, 15-33 & 4-22 Runway Overlay – Runway 1-19/15-33 Terminal A Rehabilitation Electrical and Fire Protection Upgrades Consolidated Communication Center - Facility Historical Terminal A Rehabilitation Landside Façade Repairs and Window Replacement Consolidated Communication Center - Equipment Terminal A Rehabilitation Curbside (Task Order) Airport Rescue and Firefighting Facility – Station 301 Design Construction

TERMINAL A LANDSIDE FAÇADE REPAIR AND WINDOW REPLACEMENT Designer: Shalom Baranes Associates, PC Contractor: Grunley Construction Start Date: March 2007 Substantial Completion: August 2008 DESCRIPTION: The project involves upgrade and rehabilitation of the 1941 historical Terminal A exterior. The project includes the concrete and rebar repair, re-alkalization, recoating of all landside concrete surfaces, and select demolition. The project also includes replacement and renovation of the landside and airside windows in the 1941 historical terminal. June 2007

TERMINAL A CONSOLIDATED COMMUNICATIONS CENTER Designer: HSMM Contractor: Vista Contracting Start Date: January 2007 Substantial Completion: September 2007 DESCRIPTION: The project consists of interior office, operations and related space construction to support the future Consolidated Communications Center in Hanger 5. The work is primarily on the second and third floors and includes building security, ADA, and roof and window improvements. There is a future construction contract that will provide and install the communications and dispatch equipment. June 2007

AIRPORT RESCUE AND FIREFIGHTING FACILITY (ARFF), STATION 301 Designer: Hughes Group Architects Contractor: TGM Construction Corp. Start Date: May 2007 Substantial Completion: June 2008 DESCRIPTION: The project is for the construction of a 22,800 square foot, single story Airport Rescue and Firefighting Facility (ARFF). The facility includes office administration space, five apparatus storage bays, mechanical storage unit, dormitory living space, locker rooms and kitchen and general support spaces. Old ARFF

AUTHORITY OFFICE BUILDING EXPANSION Designer: Pierce Goodwin Alexander and Linville Contractor: Vista Contracting Start Date: July 2007 Substantial Completion: June 2008 DESCRIPTION: The project is for the construction of an 8,900 square foot, two level expansions to the existing Authority Office Building (AOB). The project also includes a 90 foot elevated walkway which will connect the AOB to Hanger No. 11.

Washington Dulles International Airport (IAD)

IAD - Major Construction Projects Underway NOAA Relocation North Area Roads North Section Phase 3 South Section Phase 2 Airport Rescue and Firefighting Facility Main Terminal APM Station and Final Mezzanine Security Screening Cargo Building 6 Apron Main Terminal Expansion Joint Replacement Stallion Branch Sanitary Sewer Rehabilitate Taxiway B Airfield Shoulders West APM Tunnels, Station Excavation and Utilities East APM Tunnels and East APM Stations (Tier 1 and Tier 3) Concourse B West APM Station and 15-Gate Expansion Tier 2 / Concourse C Connector and Taxilane E Bypasses Fourth Runway Earthwork and Clearing Paving and NAVADIS Tier 2 East APM Station Dedicated Fire Water System Fuel Settling Tank Farm Early Tank Procurement General Fuel Farm Construction Taxiways Q Rehabilitation Vehicle Wash Facility Automated People Mover System Design-Build APM Vehicle Maintenance Facility Midfield Concourse Stations APM Enclosures

IAD - Major Design Projects Underway Consolidated Rental Car Facility Temporary East/West Screening Phase 3 Runway 1C-19C Reconstruction IAB Expansion IAB Enabling Projects Hold Apron 19L Reconstruction South Baggage EDS In-Line Fourth Runway Deicing and Support Facility East Baggage Basement Expansion East Baggage Basement Re-Check Tunnel South Utility Building & Electrical Distribution Center

AUTOMATED PEOPLE MOVER SYSTEM Design/Build: Sumitomo Corporation of America Start Date: March 2003 Substantial Completion: 2009 DESCRIPTION: The Automated People Mover (APM) System will replace most of the current Mobile Lounge system that is used to transport passengers between the Main Terminal and the Midfield Concourses. The train will operate on an underground dual track system. The design-build project includes design, manufacture, and installation of guideway, power, and automatic train control systems. The contractor will also provide 29 vehicles.

Delivery of Train Cars 1-4 AUTOMATED PEOPLE MOVER SYSTEM Delivery of Train Cars 1-4 First four AeroTrain cars and Maintenance/Recovery Vehicle left Mitsubishi factory in Japan on April 8, 2007 and were loaded onto a ship for transport to the United States. Arrived in Philadelphia, Pennsylvania, May 22, 2007. Trucked to Baltimore, Maryland, and held over in respect for the Memorial Day weekend/Washington region holiday traffic. Arrived at Dulles on May 30, 2007. Carefully removed from trucks and placed into the AeroTrain Vehicle Maintenance Facility in preparation for system testing in the near future.

Vehicles 13 and 14 on Test Track AUTOMATED PEOPLE MOVER SYSTEM Vehicles 13 and 14 on Test Track

AUTOMATED PEOPLE MOVER SYSTEM Vehicle #23 Outfitting

Vehicle Maintenance Facility AUTOMATED PEOPLE MOVER SYSTEM Vehicle Maintenance Facility May 2007

Vehicles 1, 2, 3, and 4 at Light Maintenance Bay AUTOMATED PEOPLE MOVER SYSTEM Vehicles 1, 2, 3, and 4 at Light Maintenance Bay

EAST APM TUNNELS AND STATION Designer: HNTB Contractor: Atkinson/Clark/Shea Start Date: October 2004 Substantial Completion: September 2008 DESCRIPTION: This project consists of the east leg of the APM tunnels from the Vehicle Maintenance Facility north to the Main Terminal. The project scope also includes the Concourse B East APM Station and a station shell at the future Tier 3 East APM location.

EAST APM TUNNELS AND STATION Tier 3 Station – Outer Trackway – Drywall Partitions – Looking South

EAST APM TUNNELS AND STATION Tier 3 Station – Outer Trackway – View to North Crossover Area

EAST APM TUNNELS AND STATION Tier 1 Station West Side Apron Level – North End / Looking South

EAST APM TUNNELS AND STATION Tier 1 Station West Side Mezzanine Level – South End / Looking North

EAST APM TUNNELS AND STATION Tier 1 Station West Side Mezzanine Level – South End / Looking North

TIER 2/CONCOURSE C EAST APM STATION Designer: Kohn Pederson Fox Assoc. Contractor: Facchina Construction Company Start Date: March 2005 Substantial Completion: April 2008 DESCRIPTION: This project consists of a side-center-side platform, two guideway station. The station includes crossovers, cast in place concrete automated people movers tunnels, a temporary heating and cooling plant, electrical substation, high-end architectural finishes, apron,and site work. The work also includes temporary taxilane by-passes between Taxilane E and Taxiway F for the future Concourse C Connector Tunnel.

Architecture: View to Grand Stairway TIER 2/CONCOURSE C EAST APM STATION Architecture: View to Grand Stairway

Temporary Central Plant for Tier 2 APM Station TIER 2/CONCOURSE C EAST APM STATION Temporary Central Plant for Tier 2 APM Station

MAIN TERMINAL SECURITY MEZZANINE AND AUTOMATED PEOPLE MOVER STATION - PACKAGE 6 Designer: Skidmore, Owings and Merrill Contractor: Turner Construction Start Date: October 2002 Substantial Completion: July 2009 DESCRIPTION: This project involves the construction of the new Main Terminal Automated People Mover (APM) Station, a security mezzanine, and a temporary mobile lounge dock and hold rooms. The project also includes both temporary and permanent security checkpoints in the Main Terminal.

Overview Looking Northwest from Column 030 – East Side MAIN TERMINAL SECURITY MEZZANINE AND AUTOMATED PEOPLE MOVER STATION - PACKAGE 6 Overview Looking Northwest from Column 030 – East Side

Overview Looking East from Column 13 – East Side MAIN TERMINAL SECURITY MEZZANINE AND AUTOMATED PEOPLE MOVER STATION - PACKAGE 6 Overview Looking East from Column 13 – East Side January 2007

Demo East Hold Room – Looking Northwest – East Side MAIN TERMINAL SECURITY MEZZANINE AND AUTOMATED PEOPLE MOVER STATION - PACKAGE 6 Demo East Hold Room – Looking Northwest – East Side

Overview Looking West Column 16-30 – West Side MAIN TERMINAL SECURITY MEZZANINE AND AUTOMATED PEOPLE MOVER STATION - PACKAGE 6 Overview Looking West Column 16-30 – West Side

Forming Center Platform Column 5-04 – West Side MAIN TERMINAL SECURITY MEZZANINE AND AUTOMATED PEOPLE MOVER STATION - PACKAGE 6 Forming Center Platform Column 5-04 – West Side

CONCOURSE B WEST EXPANSION AND WEST APM STATION Designer: Hellmuth, Obata & Kassabaum, PC Contractor: Balfour Beatty Construction Start Date: September 2005 Substantial Completion: August 2008 DESCRIPTION: The West 12-gate expansion includes construction of a concourse and supporting space for domestic flights, a 60,000 square foot basement with a vehicular access ramp and 11,000 square foot mezzanine club level. Site work includes water and sanitary lines, apron paving, and hydrant fueling work. The APM station includes below-grade concrete construction, steel superstructure, station fit out, final utility connections, tunnel ventilation shafts, and associated tunnel equipment rooms.

CONCOURSE B WEST EXPANSION AND WEST APM Concourse Level (East End), Overview, Preparing for Terrazzo Installation, Infill Area

CONCOURSE B WEST EXPANSION AND WEST APM Overview, Platform & Mezzanine Level, Facing South, West APM Station

CONCOURSE B WEST EXPANSION AND WEST APM Track & Platform Level, Inner Track, Facing North, Escalator Deliveries, West APM Station

CONCOURSE B WEST EXPANSION AND WEST APM Overview, Connection with Existing Concourse B, West APM Station

FOURTH RUNWAY AND ASSOCIATED TAXIWAYS Designer: Carter & Burgess, Inc. Contractor: Lane Construction Corporation Start Date: July 2006 DESCRIPTION: The project is for the paving and NAVAIDS construction of the Fourth Runway. The project consists of installation of erosion and sedimentation control materials, airfield/roadway pavements, utilities, marking/signage, permanent AOA fence, NAVAIDS, and biological treatment units.

FOURTH RUNWAY AND ASSOCIATED TAXIWAYS, PAVING, AND NAVAIDS PACKAGE

FOURTH RUNWAY AND ASSOCIATED TAXIWAYS, PAVING, AND NAVAIDS PACKAGE

FOURTH RUNWAY AND ASSOCIATED TAXIWAYS, PAVING, AND NAVAIDS PACKAGE

NORTH AREA ROADWAY IMPROVEMENTS – SOUTH SECTION, PHASE 2 Designer: Johnson-Mirmiran & Thompson Contractor: Lane Construction Corporation Start Date: March 2006 Substantial Completion: April 2008 DESCRIPTION: The project improves the eastbound Dulles Airport Access Highway (DAAH) lanes from Saarinen Circle to Route 28 to meet the traffic forecasts for 25 million annual passengers. The project includes widening the east-bound access highway, improving collector roads and new ramp, and adding a new intersection at Aviation and Wind Sock Drive.

NORTH AREA ROADWAY IMPROVEMENTS – NORTH SECTION PHASE 3 Designer: Johnson, Mirmiran & Thompson Contractor: Facchina Construction Start Date: August 2006 Substantial Completion: August 2008 DESCRIPTION: The project consists performing all roadway improvements including widening the inbound Access High-way to meet the existing three lane section near the Aviation Drive bridge, Ramp Q road work, and adding bridges and road connections to the north and south ends of the project. Rudder Road Toll Road (Rt 267) North Side C/D Lanes Route 28

NORTH AREA ROADWAY IMPROVEMENTS – SOUTH SECTION, PHASE 2 October 2005

FUEL SETTLING TANK FARM Designer: Burns & McDonnell Engineering Co., Inc. Contractor: Grunley-Walsh, LLC Start Date: May 2006 Substantial Completion: September 2007 DESCRIPTION: This project is for the construction of a delivery facility, fuel sampling building, and electrical controls building. The contract also includes the installation of a foam fire protection system, transfer pump and filtration system, and transfer piping to the existing hydrant fueling system tank farm.

FUEL SETTLING TANK FARM