Y. Gao & P. Gay FCPPL FEE for ILC Calorimeter Development 1 Front-End-Electronics for ILC Calorimeter Development G. Blanchard, P. Gay,

Slides:



Advertisements
Similar presentations
Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception.
Advertisements

SKIROC New generation readout chip for ECAL M. Bouchel, J. Fleury, C. de La Taille, G. Martin-Chassard, L. Raux, IN2P3/LAL Orsay J. Lecoq, G. Bohner S.
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
18/05/2015 Calice meeting Prague Status Report on ADC LPC ILC Group.
Developing the Timepix Telescope Planning a Future Timepix Telescope Richard Plackett – VELO Testbeam Meeting CERN, 7th October 09.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
-1- Current Telescope Strengths High resolution (~2.5um) Adaptability Ease of use – Currently borrowed by SPS collimator group Weaknesses Small number.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
L.Royer– Calice DESY – July 2010 Laurent ROYER, Samuel MANEN, Pascal GAY LPC Clermont-Ferrand R&D LPC Clermont-Fd dedicated to the.
Second generation Front-end chip for H-Cal SiPM readout : SPIROC DESY Hamburg – le 13 février 2007 M. Bouchel, F. Dulucq, J. Fleury, C. de La Taille, G.
08/10/2007Julie Prast, LAPP, Annecy1 The DHCAL DIF and the DIF Task Force Julie Prast, LAPP, Annecy.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
Summary talk of Session 6 - Electronics and Interfacing to AD DAQ - Mechanics for the Demonstrator for the AD ancillary detector integration team: for.
Catherine Adloff16 June 2009 CALICE Technical Board 1 DHCAL-MICROMEGAS Yannis KARYOTAKIS For the LAPP group.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
Status of NA62 straw electronics Webs Covers Services Readout.
News on GEM Readout with the SRS, DATE & AMORE
L.Royer– Calice LLR – Feb Laurent Royer, J. Bonnard, S. Manen, P. Gay LPC Clermont-Ferrand R&D pole MicRhAu dedicated to High.
Beam diagnostics developments at LAPP: Digital part CTF3 Collaboration Meeting Louis Bellier, Richard Hermel, Yannis Karyotakis, Jean Tassan,
Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London CALICE a calorimeter.
1 Calorimeter electronics Upgrade Outcome of the meeting that took place at LAL on March 9th, 2009 Calorimeter Upgrade Meeting Barcelona March 10th-11st,
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
Front-End electronics for Future Linear Collider calorimeters C. de La Taille IN2P3/LAL Orsay On behalf of the CALICE collaboration
ECFA Workshop, Warsaw, June G. Eckerlin Data Acquisition for the ILD G. Eckerlin ILD Meeting ILC ECFA Workshop, Warsaw, June 11 th 2008 DAQ Concept.
Standard electronics for CLIC module. Sébastien Vilalte CTC
14th january 2010 Actual Micromegas USB DAQ ASU and DIF
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
14 jan 2010 CALICE/EUDET FEE status C. de LA TAILLE.
12/09/2007Julie Prast, LAPP, Annecy1 The DIF Task Force and a focus on the DHCAL DIF Remi Cornat, Bart Hommels, Mathias Reinecke, Julie Prast.
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
Front-end Electronic for the CALICE ECAL Physic Prototype Christophe de La Taille Julien Fleury Gisèle Martin-Chassard Front-end Electronic for the CALICE.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
CALICE/EUDET FEE status C. de LA TAILLE. 31 aug 2009 EUDET SC meeting Status of JRA3 Front End Electronics 2 ILC front-end ASICs : the ROC chips SPIROC.
News from the 1m 2 GRPC SDHCAL collection of slides from : Ch.Combaret, I.L, H.Mathez, J.Prast, N.Seguin, W.Tromeur, G.Vouters and many others.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
SKIROC status Calice meeting – Kobe – 10/05/2007.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Understanding of SKIROC performance T. Frisson (LAL) On behalf of the SiW ECAL team Special thanks to the electronic and DAQ experts: Stéphane Callier,
CALICE ECAL meeting VFE ASIC Next & next to next version 17 Janvier 2006, LAL Orsay.
DHCAL Acquisition with HaRDROC VFE Vincent Boudry LLR – École polytechnique.
EUDET France – 05/04/07 – Rémi CORNAT (LPC) 1 CALICE instrumental chain looking (not so) forward to EUDET Overview Wafer characterization Sensor test In.
14.4. Readout systems for innovative calorimeters
3-bit threshold adjustment
D. Breton, S. Simion February 2012
ECAL EUDET MODULE Summary talk
ETD meeting Electronic design for the barrel : Front end chip and TDC
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Comments on the DAQv2 advancement
Status of the DHCAL DIF Detector InterFace Board
C. de La Taille IN2P3/LAL Orsay
Hall A Compton Electron detector overview
CALICE/EUDET Electronics in 2007
prototype PCB for on detector chip integration
STATUS OF SKIROC and ECAL FE PCB
SKIROC status Calice meeting – Kobe – 10/05/2007.
Tests Front-end card Status
Stéphane Callier, Dominique Cuisy, Julien Fleury
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
State of developments on Readout interface of European DHCAL
AIDA KICK OFF MEETING WP9
Presentation transcript:

Y. Gao & P. Gay FCPPL FEE for ILC Calorimeter Development 1 Front-End-Electronics for ILC Calorimeter Development G. Blanchard, P. Gay, S. Manen, F. Morisseau, L. Royer(LPC-Clermont) & Y. Gao, G. Gong, H. Gong, Z. Yang (Tsinghua Univ.)

Y. Gao & P. Gay FCPPL FEE for ILC Calorimeter Development 2 ILC Physics program

Y. Gao & P. Gay FCPPL FEE for ILC Calorimeter Development 3 Physics event e + e -  tt _

Y. Gao & P. Gay FCPPL FEE for ILC Calorimeter Development 4 Typical final states

Y. Gao & P. Gay FCPPL FEE for ILC Calorimeter Development 5 High granularity calorimeter EcalHcal Ecal Hcal

Y. Gao & P. Gay FCPPL FEE for ILC Calorimeter Development 6 Detector slab and ASU New generation Active Sensor Units (silicon wafer on PCB) Old generation (as installed in the actual CALICE prototype) Very front end chip inside the detector

7 Y. Gao & P. Gay FCPPL FEE for ILC Calorimeter Development Very Front End and ReadOut Acquisition Detector Front-end Read-out RAQ ADC Wafer Granularity ≈35 M channels high integration level low consumption < 5mW / channel X-bunching 150 ns large dynamics 15 bits performed w/ LAL

8 Y. Gao & P. Gay FCPPL FEE for ILC Calorimeter Development ASU-DAQ for ECAL ASUDAQ PC USB Active Sensor Unit Features full slow control including internal probing system control access to analog test points (embedded ADC) read out of the Very FRont End trought USB & PC mechanical jaw providing damageless contacts to Active Sensor Unit

9 Y. Gao & P. Gay FCPPL FEE for ILC Calorimeter Development ASUDAQ for ECAL prototype schematics interfaceUSB PC slow control ADC data probe Event builder CCC ethernet Generic connectors waiting for final specifications : use of adaptor mezzanines Large number of I/O for flexibility Various I/O format : LVDS, LVCMOS, NIM, Analog (10b, 40 MHz, ADC included) USB for slow control and read-out Connector for options : LDAitf, ethernet, debug, …

10 Y. Gao & P. Gay FCPPL FEE for ILC Calorimeter Development ASUDAQ PC jaw ASU Adapter board Damageless contact to ASU Cosmic ray test bench Hodoscope (trigger) … Control and read-out ASUDAQ PC jaw ASU Expansion to few ASU Dedicated software Next version will provide an higher automation level μ TRIG CLK ASUDAQ for ECAL usage

11 Y. Gao & P. Gay FCPPL FEE for ILC Calorimeter Development InSituDebugRAQ concept Standard DAQ Special link DebugRAQ Dedicated PC On beam simplified RAQ devoted to monitor and debug a few Very Frot End chips accurate diagnostic of unexpected behavior monitoring (internal probes) maintenance Can run alone, eventually with no beam compatible with machine interface or specific trigger and timing Dedicated Software to ease debugging Simultaneous DAQ operations allowed

12 Y. Gao & P. Gay FCPPL FEE for ILC Calorimeter Development Cooperation between LPC-Clermont & Tsinghua Univ. Expertise LPC-Clermont - 10 bits ADC already realized - Support from electronics team - Involves in CALICE Collaboration - RAQ is starting on prototype schematics Tsinghua Univ. - LHCb DAQ and commission - Trigger system for DaYaBay Experiment

13 Conclusion Front-End-Electronics is crucial and very challenging for ILC Calorimeter development LPC-Clermont & Tsinghua Univ. would like to team up under FCPPL support to work on the R&D of FEE for ILC Calorimeter. Thank You !