Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK.

Slides:



Advertisements
Similar presentations
Product Design & Process Selection-Manufacturing
Advertisements

ABC Group Management Meeting: ANDON SYSTEM ANDON ABC Group Manufacturing.
Catalyst Chemical Injection Systems. Catalyst System Family.
Batching & Blending Plant
Sentinel Battery Monitoring Systems protecting your power supply P r o t e c t i n g y o u r p o w e r s u p p l y1.
Total HVAC Control from anywhere Easy control that can save a fortune
AIR CONDITIONING ACCESSORIES
@Perkins Proprietary Information of Perkins Engines Company Limited © All Rights Reserved.
Sales Manual B.Braun Space
Real-time Environmental Data Verification and Presentation August 6 th, 2014 Kavitha B V Central Pollution Control Board, New Delhi.
CNG Refuelling station. A company located in Cherasco (Italy), is among the world leaders in the field of designing and manufacturing of components and.
GUARDIAN ® Gravimetric Batch Blender. 2 Function Raw materials are metered by V-shaped, quick opening slide gates into the weigh hopper. When all ingredients.
The Silo System ApS company was founded in 2006 by Jørgen Thomsen and Frede Madsen. Jørgen Thomsen and Frede Madsen have many years of experience with.
GRAVITROL ® Extrusion Control. 2 Closed control loop: GRAVITROL ® By the loss in weight in the weigh hopper over a time interval GRAVITROL ® measures.
Advanced hydraulic solutions
Hydraulics.
MILK PASTEURIZER. One milk pasteuriser with a capacity of litres of milk for hours, HTST type with an operate range from 75° to 95°C, including.
The EX100 & EX1000 Oil in Water Monitors. The EX100/1000 Oil In Water Monitor Features 1.Continuous Flow and Accurate Measurement. 2.Measurement range.
Technical Brief v1.0. Communication tools that broadcast visual content directly onto the screens of computers, using multiple channels and formats Easy.
1 VACUUM ATMOSPHERES Co NEW PRODUCT ANNOUNCEMENT November 28, 2001.
Compressed Air Systems Optimized What you really need and how to get it at the total lowest cost. Go to
THERMAL TRANSFER. Agents worldwide Belgium Canada China Denmark Egypt Estonia Finland Greece Holland Ireland Israel Italy Korea Latvia Lithuania New Zealand.
SIMATIC WinCC V5.0 WinCC V5 Under Windows NT.
SINGLE-PHASE HOPPER LOADERS ENG. FEEDING SINGLE-PHASE FEEDER 2.
Bentley Data Manager A Tour of the Bentley DigitalPlant Solution for Project Data Management.
InterSwyft Technology presentation. Introduction InterSwyft brings secured encrypted transmission of SMS messages for internal and external devices such.
Material Handling Systems MHS. 2 Material Handling Systems (MHS) Material handling systems are an important part of an extrusion line. Their job is to.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
Production visibility: KPI’s in Real-time BASF – The Chemical Company
HYDRAULICS & PNEUMATICS
Air conditioning: new IR emitter item WDS DIVISION Main advantage Permit to control air conditioning IR splitter from My Home touch screens Bus.
Vibration Data Collector 911D - Economic, Very-easy-to-use Features: Full automatic measurement Automatic diagnosis of machinery faults by time domain.
High Sensitivity Smoke Detection
Cullen College of Engineering RFID-Based Solutions for Piping Technology Piping Tech & UH July, 2007.
The “One Stop Shop” for Plastic Auxiliary Equipment Plastics Auxiliary Equipment By Marketing Dept. PT. ADHI TRIKARYA MANDIRI.
Instant Messaging for the Workplace A pure collaborative communication tool that does not distract users from their normal activities.
Automatic Software Testing Tool for Computer Networks ADD Presentation Dudi Patimer Adi Shachar Yaniv Cohen
Windows Control Center
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
CAD CAM CADMAT A2 Graphics. CADMAT We will look at … We will look at … CADMAT CADMAT –Computer aided design, manufacture and Testing PDM PDM –Project.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
Topics of presentation
SETA Water treatment plant maintenance
1 / Name / Date IDA Interface for Distributed Automation The journey toward Distributed Intelligence.
Fluid conditioning. Reservoir Reservoir size The size of a compressed air reservoir depends on the: Delivery volume of the compressor Air consumption.
System Manager February 11, What is System Manager System Manager unites Inter-Tel’s diverse product line into a family of products that can be.
Configuration Examples & Mass Customization by Christian Bentzen Sales & Project Director | SolutionSpace Example of Complex Configurable.
Launch Chameleon Plus P - More Preventive features and safety L - More Longer Lasting and robust U - More User friendly operation S - More Service friendly.
Trouble Shooting for Injection Molding Process
PowerShield Battery Monitoring Systems protecting your power supply P r o t e c t i n g y o u r p o w e r s u p p l y1.
Supplier Up to Schedule Plan  Supplier receives releases from Lear on a weekly basis via EDI or Fax.  If the supplier does not receive a release on a.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
Kaeser Direct Drive ESD Rotary Screw Compressor
Sociedad de Transformación de Plásticos, S.A. Manufacturer of Solutions for pipes connections Human Resources STP Branches World-Wide Market Approvals.
Welcome to FAN-TECH INDUSTRIES Website: ID: Mo No.:
Loaders and Dryers Wan Sharuzi Wan Harun Faculty of Mechanical Engineering Universiti Malaysia Pahang
AEON 4000 Including the SMPS 4000 rectifier and the AEON Gold Alarm & Monitoring Unit.
Cooling Water and Heat Recovery system Thomas Hjern Harald Bäck Design Leader Process systems Conventional Facilities Accelerator Review November 3-4,
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Kaeser Direct Drive CSD Rotary Screw Compressors
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
L14 - Speed Integration with Ethernet-enabled CENTERLINE® MCCs, Rockwell Software Studio 5000® and IntelliCENTER® Software.
Compact line ‘EW*D~J-’ water-cooled chiller range
Application Operation principle Advantages Highlights Comparison
PLC / SCADA / HMI Controllers: Name : Muhammad Zunair Comsats University Date: 28-October-2018.
Texas Pipe and Supply Presentation #3.
SCITEQ End closure series
Presentation transcript:

Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK

Labotek Project Project start – October 2005 Last follow-up actions – May 2007

Labotek Project Central Conveying and Drying Control 3 x Desiccant Flex Dryer, DFD 51 x Drying Hopper, DH 51 x Stainless Vacuum Receiver, SVR 85 x SVR with Integrated Dosing Valve, IDV 85 x Material Hoppers 3 x Scan Vacuum Station, SVS- I 4 x WAM filters 4 x Couplings stations 6.1 Kilometre pipe system 1.4 Kilometre hose system

Control System Flexible technical solutions prepared for future expansions Visualization of Plant Data Based WinCC Network interface (Ethernet) Material database – Production database - Service database Alarm logs and reports Web enabled communication for service and diagnostics

Customers design control Access to data for the 3 factory Database: Drying parameters for 1000 materials Alarm logs Production planning of drying Multi display application Centralised database Factory 1 Factory 2 Factory 3 Control System

Drying Hopper The drying hopper ensure that the material lines are completely cleared after each conveying cycle and that an equal amount of material is conveyed in each cycle.

51 Drying Hoppers are placed on a platform in 4 lines at SP Moulding The capacity are from 40 to 380 litre Drying Hoppers With a total capacity of 6530 litre Drying Hopper

Desiccant Flex Dryer The Desiccant Flex Dryer is designed for continuous drying of granular plastic materials Hygroscopic, non-hygroscopic raw materials and regrinds in the temperature The Desiccant Flex Dryer is able to supply dry air with a dew point down to ÷40ºC or lower

3 x Desiccant Flex Dryer 1500 are placed under the platform at SP Moulding With a total air volume at 4500 m³/hour Desiccant Flex Dryer

Coupling stations links the processing machines to the drying system 4 Coupling stations, one to each hall at SP Moulding With: 54 in, 208 out Coupling station

Piping system Piping system: Conveying the raw material to the processing machines 6.1 Kilometre of piping and 1.4 Kilometre hose system at SP Moulding

Stainless Vacuum Receiver Stainless Vacuum Receiver for Conveyance the Free-Flowing Granules 51 SVR are mounted on the Drying Hoppers at SP Moulding The capacity are from 4 to 26 litre receivers

Integrated Dosing Valve Stainless Vacuum Receiver with an Integrated Dosing Valve 85 SVR/IDV are mounted on the processing machinery at SP Moulding The capacity are from 4 to 50 litre receivers with IDV

Material Hopper The capacity are from 5 to 50 litre Material Hopper. 85 Material Hopper are mounted under the IDV

The SVR/IDV with Hopper are mounted on the IMMs at SP Moulding And connected via the piping system to the central drying system SVR/IDV with Hopper

Scan Vacuum Station - I Generates the vacuum necessary to convey the plastic materials. Blower: LT6-I, 3,4kW 2 x LT6-I3 x LT6-I

Scan Vacuum Station - I 3 x SVS-I are placed under the platform at SP Moulding 1 x 3xLT6-I Vacuum Station 2 x 2xLT6-I Vacuum Station

WAM filter The self-purifying filter is located between the vacuum station and the vacuum receivers and is cleaned after each conveying cycle. 4 x WAM filters are placed under the platform at SP Moulding

Centralised system By changing decentralised systems, to a centralised, have SP Moulding now 62 IMMs in the same area, where they had 46 IMMs in The system is designed, dimensioned and customised in accordance with SP Moulding machine layout, requirements and requests. Follow the expansion, step by step

Machine layout Project date: November IMM in Hal 1 30 IMM in Hal 2

Step I Project date: January IMM in Hal 1 31 IMM in Hal 2

Step II Project date: February IMM in Hal 1 35 IMM in Hal 2

Step III Project date: January IMM in Hal 1 35 IMM in Hal 2

Step IIII Project date: May IMM in Hal 1 36 IMM in Hal 2