Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, 20021 HCAL Status CMS HCAL Status Jim Freeman.

Slides:



Advertisements
Similar presentations
HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
Advertisements

HCAL TB2002 CPT Week, CERN, 05-Nov-2002, S.Kunori1 HB TB2002 Some Results Shuichi Kunori Jordan Damgov 05-Nov-2002.
CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
CMS HCAL HB RBX PPR - March, 2001 Electronics 1 H C A L Electronics Overview Electronics System Overview Power Backplane Readout Module (RM) Clock and.
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
DOE/NSF Review of ATLAS, 1 Mar 2000, BNL Muon MDT Front End Electronics (WBS 1.5.9) James Shank DOE/NSF Review of U.S. ATLAS Detector (with help from:
CMS/CERN. Nov, 2001HCAL TriDAS1 HCAL Fiber Link Issues Use of CMS Tracker Fiber Links Drew Baden University of Maryland John Elias Fermilab.
CMS Hadron Calorimeter
Andris Skuja: US CMS Annual DOE/NSF Review, May 19, CMS HCAL Report US CMS HADRON CALORIMETER REPORT Andris Skuja University of Maryland US CMS Annual.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
RBX PRR - March 1-2, H C A L HCAL RBX PRR Readout Box (RBX) PRR Dan Green HCAL Project Manager.
CMS Experiment CMS Hadron Calorimeter - Arie Bodek
HCAL RBX for HB, HE, and HO Status and Planning R. Ruchti Department of Physics University of Notre Dame Notre Dame, IN USA.
Andris Skuja: US CMS DOE/NSF Review: HCAL Subsystem Session May 20, 2003: Schedule, etc. 1 WBS 2 - Hadron Calorimeter Andris Skuja HCAL Schedule at CERN.
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
E. Hazen, Boston University BU Meeting, Apr. 6, 2001 Front-end Readout of the CMS Hadronic Forward Calorimeter (HF) Conceptual Design (Summary) by Eric.
Data Acquisition Software for CMS HCAL Testbeams Jeremiah Mans Princeton University CHEP2003 San Diego, CA.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
CMS Experiment CMS Hadron Calorimeter - Arie Bodek
ALICE Rad.Tolerant Electronics, 30 Aug 2004Børge Svane Nielsen, NBI1 FMD – Forward Multiplicity Detector ALICE Meeting on Rad. Tolerant Electronics CERN,
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
CALOR2006 June 7, Julie Whitmore Fermilab Overview of the CMS Hadron Calorimeter.
1 HO Upgrade: QC and Production Preparation in India Shashi Dugad India-CMS Meeting, BARC 30 July 2010.
HPD Development Project is DONE! The Future is Quality assurance Database management Alignment Production of cookies and mounts Electronics interfacing.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
CMS Upgrade Workshop – Nov 20, H C A L Upgrade Workshop CMS HCAL Working Group FE Electronics: New QIE Nov 20, 2007 People interested in QIE10 development:
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002.
Kavita Lalwani, Pooja Saxena, Kirti Ranjan, Ashutosh Bhardwaj Department of Physics & Astrophysics University of Delhi Manoj Sharan High Energy Nuclear.
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
EODU, Mixers and Plans for 2012 B. Baumbaugh, C. Broughton, C. Burke, J. Conti, K. Daily, J. Freeman, A. Heering, D. Karmgard, S. Los, J. Marchant, M.
HB LED Pulser Boards By Michael Miller The University of Iowa.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
HF Front-end status Tullio Grassi 11 Dec Overview The HF FEE will change entirely, including the backplane. Only the cable plant (fiber, copper)
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Plans and Progress on the FPGA+ADC Card Pack Chris Tully Princeton University Upgrade Workshop, Fermilab October 28, 2009.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
Feb 2002 HTR Status CMS HCal meeting at FIT Feb. 7-9, 2002 Tullio Grassi University of Maryland.
Sensitivity of HO to Muons Shashi Dugad for HO group India-CMS Meeting 6-7 Oct
25 Sept 2001Tullio Grassi From MAPLD2001 ( space community conference ) Major causes of failures.
ESR December, H C A L HCAL Front-end Electronics ESR HCAL Front-end Electronics Report December, 2002 Theresa Shaw.
G-2 Calorimeter test beam “ T-519 has been assigned beam time is from Thursday July 17 to Monday morning July 27 at ESTB” LCLS is operating lower beam.
HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
CMS ROC Report Patricia McBride May 26, 2005.
HF Test station at P5 A.Mestvirishvili.
Propose to replace HPDs in R1 and R2 with SIPMs, ASAP
T1 Electronic status Conclusions Electronics Cards:
ROBOX modification plans
Electronics for the E-CAL physics prototype
VELO readout On detector electronics Off detector electronics to DAQ
Regional Cal. Trigger Milestone: Production & Testing Complete
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Calice Tile-HCal and Tail-catcher/Muon Tracker
Presentation transcript:

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, HCAL Status CMS HCAL Status Jim Freeman

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, OutlineOutline Absorber Optics Status at CERN HPDs Front End Electronics Higher Level readout Radioactive Source Test Milestone HF Summer 2002 Testbeam Longer Term Schedule

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, HB wedge design

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, AbsorberAbsorber HB- at SX5 at CERN  17 HB+ wedges at CERN in Building 186. (Wedge 16 being repaired) Optics installed, QC Testing in progress

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, HB Wedges at Bldg 186

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, HB- wedge 16 Damage

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, HE + at Minsk

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, Megatile design, top view Components are the machined scintillator plates, cover plates, fiber assembly (WLS spliced to clear fiber, optical connector) pigtails

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, Megatile cross-sectional view

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, Protvino - Pig Tail QC RMS of the light yield transmission is less than 5%.

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, Megatile Manufacture -HE 10 megatiles/day at Protvino

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, HB Megatile Production Scheduled to be completed end of 01. Total labor estimate ~ 1.8 M$

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, Installation at CERN

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, Optics Factory at FNAL HB Optics factory in final phase. Will be finished in 2 weeks. Reduce staffing from 13 to 5. Factory will redirect to work on components for RBX’s, HV, LV, electronics components.

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, HPD Delivery Schedule Letter of Intent received by DEP Oct 12, 01 Spare Tubes (20)Dec 20, 01 Spare Tubes (30)Mar 1, 02 HB- (72)May 12, 02 HE- (72)Aug 23, 02 HB+ (72)Nov 3, 02 HE+ (72)Jan 28, 03 HO (146)Jun 23, 03 So far, 20 at Minnesota. ~ on schedule First Production HPD

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, HPD Anti-Reflective Coating 3 layer coating on top of HPD Diode. Bias Voltage Aluminum with no anti-reflective coating New Diode Structure

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, RBX Status HB RBX in production (Mississippi). Should be complete by April 02. ODU’s for HB complete (Notre Dame) 2- 3% rms. HE RBX in design. Design should be complete by April 02 Production of HE RBXs late spring HE ODUs to be built in ND factory in summer. Design HO RBX. Build over summer HO ODUs in fall (ND)

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, HB RBX Assembly Full RBX with 19 ch RMs RBX Interior -- HV distributor and backplane

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, Readout Module (RM) Overview

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, Interface Card HPD Mount RBX Readout Module The readout module (RM) integrates the HPD, front end electronics, and digital optical drivers. Electronics cards HV Optical Sorter ODU

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, ODU production at Notre Dame

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, ODU QC

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, FE/DAQ Readout

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, FE Channels

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, FE Status Past 6 months Tested proto CCA Asic – looks good Tested proto QIE Asic Does not run at 40MHz (easy fix) Noise levels under study 3000e- rms with soldered coax connections btw HPD and QIE HB Backplane layout complete Proto GOL (serializer) tested - OK Gigabit Ethernet protocol 1600 Mbits/s Proto VCSEL and custom package tested – ok Rad qualified “glue” logic parts

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, CMS QIE Status Full chip submitted 3/13/01 Received 5 wafers 6/1/01 Testing shows chip fully functional Chip does not run at 40 MHz Noise as a function of input capacitance being studied Noise of 3000e- rms achieved with soldered coax connections btw HPD and QIE Goal is to submit production part by April ‘02

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, CCA Status CCA submitted June 25, parts back Oct 11, 2001 Chips under test Problem with reads/writes to internal registers Problem with writes fixed with repair on chip (jumped out inverter) Problem with reads under study Other than reads, the CCA appears to be fully functional Engineering run chip submitted on Feb 11. Due back April 8.

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, CCA ASIC Repair

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, Radioactive Source Vertical Slice Exercise a single channel of HCAL readout from scintillator to computer Radioactive Source Scintillator Optical Fiber HPD QIE Digital optical readout HTR DCC Computer First complete ~40Mhz readout of HCAL Channel Successful demonstration of radioactive source measurement for calibration.

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, QIE under test QIE Test Board TTCrx Clock distributor

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, DAQ System

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, Radioactive Source Test Response as source is removed from scintillator Shift of 180 electrons

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, HF Status 10 HF absorber wedges finished. 5 at CERN Fiber ordered. First delivery to CERN Phototubes ordered. Expect first complete wedge (fibers, pmts) at CERN in early June 02. Expect to test in H2 test beam this summer.

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, First Production HF Wedge

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, Idea to use HO for muon trigger, vertical slice trigger Expect ~ 2 p.e. of noise and ~ 8 p.e. of signal for a single muon at normal incidence. Toy montecralo with 5000 e- noise, 8 pe/mip in HO

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, Testbeam Motivation HB- assembled in September 01 HB+ will be assembled in September 02 Only chance for testing production wedges with fast (engineering run ASICS) electronics is Summer 02. Desire to test 2 to 4 production wedges from HB+. Get absolute calibrations to carry from H2 to UX5.

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, Testbeam Goals Prepare test beam DAQ to read out prototype HTR cards. Electronics will be 6-channel RBX cards, using first run QIE and engineering run CCA. GOL and fiber-optic readout. Rochester ECAL module on table, with new motion mechanism. Take ~ 4 production wedges into beam. Measure radioactive source fingerprints. Scan with pions as function of eta and phi.

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, Testbeam Responsibilities H2 Test beam beamline, DAQ – Laza RBX FE cards – Terri Shaw RBX mechanics, optics – Randy Ruchti Check out / test RBX’s – Anatoly Ronzhin System integration FE card to HTR – Jim Rohlf Radioactive source system – Virgil Calibration System --Vasken, Sergey Los Refurbish table – George Ginther ECAL Module, new motion – Pawel HV System – Sergey Los HPD checkout and setup – Arjan Heering

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, Testbeam Conclusions Test Beam 2002 very important goal for HB group. Only chance to test production wedges Important step in system integration in preparation for SX5 activities in late 02, early 03.

Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, ConclusionsConclusions HCAL absorber and optics making good progress Front end and Higher level electronics progressing Finished with absorber, optics. HPDs under control ASICs under control HF fibers and pmts ordered. Looking forward to test beams in summer 02 Install electronics Spring 03 Vertical Slice Tests in SX5 in 03