ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &

Slides:



Advertisements
Similar presentations
Capital Beltway HOT Lanes Project Project Update March 2009.
Advertisements

Capital Beltway HOT Lanes Project Project Update April 2009.
I-295 Flyover Project Western Henrico County Why is this being built? To improve the flow of traffic on I-64 between Route 288 and I-295 I-64: more than.
I-96 Reconstruction/Bridge Repair Project City of Livonia and Redford Township Wayne County May 10, 2013 Association of the Council of Western Wayne Yankee.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
Spotsylvania County Public-Private Transportation Act Spotsylvania County Infrastructure, LLC (SCI) June 2008.
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
City of Bloomfield Hills 2015 Road Improvement Program.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Comparative Traffic Study Morrisville-Carpenter Road versus Crabtree Crossing Extension Presentation to: Morrisville Town Council Prepared by: Parsons.
Newmarket Viaduct Replacement STAGED VIADUCT CONSTRUCTION / DECONSTRUCTION PROCESS PROJECT DELIVERY BY NGA NEWMARKET.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Fred Luna, SBCAG Paul Martinez, Caltrans District 5 Project Information State Route 246 Passing Lanes 1.
Hardin County Engineering Department September 12, 2006.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
North Queen Anne Neighborhood Traffic Management Plan November 2004.
Transportation Study for City of Bluffdale Porter Rockwell Boulevard is a planned, designed and partially built major arterial road that connects Mountain.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Region 1 Traveler Information on 2010 Construction Route 7 over I-87 (Exit 6) Bridge Replacement Town of Colonie.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
1 I-75 Reconstruction Welcome! Those wishing to make an official comment concerning any of the projects presented this evening.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
CAT Realignment and Reconstruction of Rt. 28A Town of Olive Ulster County, New York January 2009.
S.R. 930 and Green Street Intersection Improvement Project Tuesday, May 22, :00 p.m. Presentation Park Hill Learning Center Auditorium New Haven,
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve B) to US-19 North of SR 688/Ulmerton.
Park Lane ZOM Location Map. Park Lane ZOM Aerial.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
STA Safety Project PID #76439 December 12, 2006.
I-495 NORTHERN SECTION SHOULDER USE PROJECT State Project No , P101, C501 CITIZEN’S INFORMATION MEETING UPC NOVEMBER 19, 2013.
Transportation Committee Update 10/13/2015. Transportation Committee Members Roads Subcommittee Bill Wanatosky Benson King Anthony Watkins Helene Rosenheim.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
April 20, 2012 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
MD 30 (Hanover Pike) at Mt. Gilead Road
Four Winds Condominium Association August 2, 2017
Molly Kline, Project Manager
Highway 110 Project Update
The Oakton Condominium Association September 12, 2017
Highway 169 Bridge Replacement & Pavement Resurfacing
North Main Street Intersection Improvements at Route 460 Bypass
9th & Colorado Redevelopment Impacts Denver Public Works - Traffic Safety recommendations Community feedback Survey Results Conducted by: Colorado.
I-69 Southwest/I-610 West Loop Interchange Reconstruction
Quarterly Transportation Report 4th Quarter 2011 October 11, 2011
SE 12th Street Roadway Improvements February 8, 2005.
The Construction team appreciates this opportunity to discuss the work that will begin in October on State Road 397 over Toms Bayou. My name is Mike Sasser,
Contract 60X10 Informational Meeting Weber I-55
Harbour Island Force Main Replacement
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
S.R. 261 Intersection Improvement at Fruitwood Lane in Newburgh
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS & ASSOCIATES, Inc.

PROJECT PURPOSE OPERATIONAL IMPROVEMENTS SAFETY IMPROVEMENTS ADDITIONAL BENEFITS: – DRAINAGE UPGRADES – STORMWATER TREATMENT

PROJECT HIGHLIGHTS POTOMAC VIEW ROAD – Add 3 rd left turn lane, southbound Potomac View Rd. onto eastbound Rte 7 – Add 2 nd left turn lane, west- bound Rte 7 onto south- bound Potomac View Rd. – Safety Improvements Potomac View Road Looking South

POTOMAC VIEW ROAD Potomac View Rd Route 7 New 2 nd Left Turn Lane New 3 rd Left Turn Lane

PROJECT HIGHLIGHTS STERLING BOULEVARD – Add 3 rd left turn lane, northbound Sterling Blvd. onto westbound Rte 7 – Add right turn lane on eastbound Rte 7 onto southbound Sterling Blvd. – Closure of connections to Amherst Street/Place – Safety Improvements Sterling Boulevard Looking North

STERLING BLVD Route 7 Sterling Blvd New Lane Arrangement as Shown on Sign Lanes shifted toward median to allow new right turn lane New Right Turn Lane New Acceleration Lane W. Amherst Pl. E. Amherst St. Access to/from Sterling Blvd to Close

PROJECT HIGHLIGHTS Augusta Drive Looking South AUGUSTA DRIVE – Add 3 rd left turn lane, southbound August Dr. onto eastbound Rte 7 – Extend left turn lane, westbound Rte 7 onto northbound Augusta Dr. – Safety Improvements

AUGUSTA DRIVE Route 7 Augusta Dr 2 Thru Lanes will Shift to the right New 3 rd Left Turn Lane Extended and Shifted Left Turn lane

SAFETY IMPROVEMENTS Widened shoulders where feasible Increased acceleration zone where feasible Flattened slopes in median where feasible Traffic barrier (Guard Rail) along steep slopes

ENVIRONMENTAL IMPROVEMENTS Improving Roadway Drainage – Increasing Storm Sewer Pipe Sizes to handle more flow – Re-grading Median Ditch Lines

ENVIRONMENTAL IMPROVEMENTS Utilizing Landscaped Biofiltration Basins – Provides a “Low Impact” Solution – Aesthetically pleasing landscaping

TRAFFIC CONTROL HIGHLIGHTS Off-Peak Hour* Lane Closures Temporary lane narrowing Night Work to be minimized Construction Period Approximately 12 months Peak Hours currently defined as 5:00 a.m. to 9:00 a.m. and 3:30 p.m. to 7:00 p.m. *

PROJECT ACTIVITIES & CURRENT SCHEDULE ACQUIRE EASEMENTS & RELOCATE UTILITIES BEGIN CONSTRUCTION – SUMMER 2012 SUBSTANTIAL COMPLETION – SPRING/SUMMER 2013

POINTS OF CONTACT James Rauch, Division Manager (703) Dawn Klassen, Land Acquisition Manager (571) Laura Mehiel, Consultant Project Manager (703)

QUESTIONS? ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE