Chapter 12 Pricing Masonry Carpentry, and Finishes Work.

Slides:



Advertisements
Similar presentations
Chapter 5 Measuring Carpentry Work. Board Measure Most lumber is dressed; this means that surfaces are sanded, which reduces the size of cross section.
Advertisements

Measuring Carpentry and Miscellaneous Items
Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
Copyright © by NCCER, Published by Pearson Education, Inc. Carpentry Fundamentals Level One Module National Center for Construction Education.
Measuring Concrete Work
Chapter 14 Pricing General Expenses. Objectives Upon completion of this chapter, you will be able to: –Define general expenses –Use a checklist to identify.
Unit 2 The Building Trades
Pricing Subcontractors’ Work
Skyscraper Construction
Wood Products Lumber Measurements Calculations
Measuring Sitework, Excavation, and Piling
The future of automated construction excellence. Industry Trend More for Less Metal Construction Components Competitive Advantage Business Concept Process.
Chapter 9 Pricing the Work. Introduction Non-computer estimates are priced in two stages: –Stage one: Prepare a recap by sorting and listing all takeoff.
Construction Cost Estimating Class #5 - Concrete Prof. Ralph V. Locurcio, PE.
Pricing Excavation and Backfill
Skilled Trades 1201 Floor Framing
Chapter 6 Measuring Masonry and Finishes. Masonry Work Generally It includes clay bricks, concrete bricks and blocks, clay tiles, and natural and artificial.
Construction Methods and Materials Masonry Masonry.
Work Breakdown Structure –Early compilation of significant work items w/ associated cost and schedule considerations –Overview of project –First look.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Quality Management – Cost and Time Management Initial Cost of Materials & Equipment Labor Cost Long Term Cost Time Management.
A Revolutionary New Panelized Construction System Steel frame panels for each project are built in CHS’s manufacturing facility and delivered to job-site.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Basic Building Construction
INTRODUCING THE COST APPROACH Chapter 11. Base cost Builder’s profit Building shell Building size and shape Comparative square-foot method Construction.
Measuring Masonry Work
Chapter 11 Pricing Concrete Work. Objectives Upon completion of this chapter, you will be able to: –Describe the job factors and the labor and management.
Chapter 4 Measuring Concrete Work
Constructing Homes and Other Buildings
ASSIGNMENT Begin on page 197 “The Foundation”.
Structural Drawing Chapter Technical Drawing 13 th Edition Giesecke, Mitchell, Spencer, Hill Dygdon, Novak, Lockhart © 2009 Pearson Education, Upper.
Chapter 1 Introduction.
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
Chapter 8 Pricing Generally. Objectives Upon completion of this chapter, you will be able to: –Describe the general process of pricing a construction.
Wall and Ceiling Construction
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
1 HVACR116 – Trade Skills Structural Drawings. 2.
Environmentally Friendly Framing Methods
Roof and Ceiling Framing
Masonry Green Application 1. Key Lessons from Masonry In Masonry, we learned about: Materials and products from brick and CMU to mortars Tool and equipment.
Chapter 1: Building Materials. How much should the “snow load” be in Cordova Alaska?
Chapter 25 Framing Methods. 2 Links for Chapter 25 Balloon Framing Platform Framing Post-and-Beam Framing Related Web Sites Steel Construction Concrete.
Specification & Quantities Estimating
Drawings ACT Objective Realize the organization and intent of construction drawings 2.
Chapter 13 Project Management. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Define and give.
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
Wall and Ceiling Construction
Chapter 43 Common Commercial Construction Materials.
Chapter 28 Structural Components of Framed Construction.
 Overview of Interior Finishes  Types  Examples.
Chapter 13 Estimates for Remodeling Work
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
CAREER CHOICES By: Chris RYKEN. Carpentry  It usually takes 3-4 years to become a skilled carpenter with training both on the job and at school.  Job.
Contract Specifications Written Set of standards and procedures informing the contractors or remediation professionals of materials & operation necessary.
CONSTRUCTION SYSTEMS. What Is Construction? Our Constructed World shelter travel.
Lesson 5.  The carpentry trade covers many items. That is, it is not confined to a few specific items such a reinforcing steel, painting etc.  Common.
INTRODUCTION to EUROFORM
Introduction to Masonry
Chapter 1 Introduction.
Common Structural Forms
Drawing Interpretation
Lumber in a house You will need 3 sheets of lined paper
Objective 6.02 part 1: Recognize components of construction
Wood Structures Topic 8 Quality Workmanship
Structural Drawing Chapter 19.
Construction Materials and Workmanship
STRUCTURAL TIMBER FRAMING
Recap QUANTITIES Taking out quantities
5. HEAVY TIMBER FRAME CONSTRUCTION
Presentation transcript:

Chapter 12 Pricing Masonry Carpentry, and Finishes Work

Objectives Upon completion of this chapter, you will be able to: –Describe the specific job factors that affect the price of masonry work –Explain what influences the material price of masonry bricks and blocks –Describe the specific job factors that affect the price of rough carpentry work

Objectives (cont’d.) –Explain what influences the material price of lumber –Describe how finish carpentry is priced –Describe how interior and exterior finishes are priced

Objectives (cont’d.) –Complete the recap and pricing of masonry work, rough carpentry, finish carpentry, and interior and exterior finishes using manual methods –Use Excel spreadsheets to price masonry work

Introduction Masonry work, rough carpentry, and finish carpentry –Commonly subcontracted –Still performed by some contractors Specialized companies –May have questionable reliability record Price errors

Masonry Labor costs –Laying masonry –Installing accessories Ladder reinforcing and wall ties Masonry materials Modularization –Factory construction of masonry panels Not common

Masonry Productivity Factors affecting productivity: –What is being built –Workmanship required –Size and weights of units –Mortar and bond used –Design complexity –Presence or lack of repetition –Availability of skilled trade workers

Figure 12.1 Masonry Work Productivities (Delmar/Cengage Learning)

Masonry Materials Prices vary –Depend on requirements –Normally found in specifications When not provided, based on materials agreed upon (e.g., materials defined in the bid) Wastage –More materials delivered than used Accounted for in takeoff quantities

Rough Carpentry Fabricated off-site –Assembled at the job site Costs –Labor and material Lumber or fabricated components Cranes Beams Trusses

Rough Carpentry Productivity Factors affecting productivity: –Carpentry components –Size of cross-section and length lumber –Power tool use –Design complexity –Presence or lack of repetition –Off-site fabrication

Rough Carpentry Materials Specifications define: –Species –Use classification –Lumber grade Softwood lumbar classifications: –Yard, structural, factory, and shop lumber –Rough, surfaced, and worked lumber –Boards, dimension, and timber

Rough Carpentry Materials (cont’d.) Lumber lengths and waste factors –Generally multiples of two feet Waste factors still required Lumber grades –Information on ability to meet requirements Rough hardware –Mostly consists of nails Other fasteners may also be required

Finish Carpentry and Millwork Pricing finish carpentry –Applying materials and labor prices to items measured in takeoff process Productivity of labor crews –Influenced by job factors Similar to rough carpentry

Exterior and Interior Finishes Procedure: –Measure quantity of each item of in takeoff –List takeoff items on a recap –Apply separate materials and labor prices Material prices: –Determined by suppliers Productivities: –Job, labor, and management factors

Wage Rates Basic hourly wages: –Masonry foreman: $43.00 –Mason: $39.00 –Equipment operator: $40.00 –Labor foreman: $33.00 –Laborer: $30.00

Wage Rates (cont’d.) –Cement finisher: $37.00 –Carpentry foreman: $41.00 –Carpenter: $38.00 –Painter foreman: $37.00 –Painter: $34.00

Examples Masonry, Rough Carpentry and Finish Carpentry Recap and Pricing Notes Example 1—House –Refer to Figures 12.6 through Masonry Work Pricing Notes Example 2—Office/Warehouse Building –Refer to Figure 12.11

Summary This chapter reviewed pricing and influential pricing factors of: –Masonry work –Rough carpentry work –Finish carpentry work –Interior and exterior finishes