Welcome to Inspecting Maintenance of Traffic Items on Projects

Slides:



Advertisements
Similar presentations
Signing Plan Design - At Grade Intersections Sample Plan Set
Advertisements

Living on the Edge Pavement Markings 101
Miscellaneous MOT issues
D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST.
2015 VDOT – VAA Asphalt Seminar March 12, 2015 | Blacksburg, VA Work Zone Safety Mike Sharkady, ATCS, PLC. Senior WZ Safety Coordinator VDOT Southwest.
February 26, 2015 | Fredericksburg, VA Work Zone Safety
SCHOOL BUS TRAFFIC CONTROL DEVICES
SW Region Construction Conference February 19 th 2014 Joe Schneider – Work Zone Engineer Traffic Section – SW Region La Crosse Office.
Lesson 5 N ATIONAL T RAFFIC I NCIDENT M ANAGEMENT (TIM) R ESPONDER T RAINING P ROGRAM LAW ENFORCEMENT | FIRE | EMS | TRANSPORTATION TOWING & RECOVERY |
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
First Article Inspection Report
Maintenance of Traffic (MOT)
Rules of the Road. Introduction This training will assist Spanish- speaking Motor Carriers in understanding some of the important traffic regulations.
ODOT Pavement Marking Design
Overview of 2009 MUTCD. Tom McDonald, PE Safety Circuit Rider Iowa LTAP.
Module 5 Safe Parking MOT Training for Incident Responders in Florida.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Thermoplastic Thickness Measuring Device.  Equipment  Procedure  Flat Line  Measuring Audible Cookies  Transverse bars w/ Inverted Rib  Thermo on.
6 TH ANNUAL CONFERENCE. Performance Based Maintenance Results Tim Lattner, P.E. Director, Office of Maintenance, Florida Department of Transportation.
2009 MUTCD (Final Rule) Revisions Incorporated into the 2009 MUTCD Revisions to Chapter 2B – Regulatory Signs, Barricades, and Gates.
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
MoDOT’s Inventory Systems and Measures for Pavement Marking and Roadway Signing Jim Carney State Maintenance Engineer October 2004.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
CHAPTER 3 SIGNS, SIGNALS AND PAVEMENT MARKINGS
Florida Department of Transportation T EMPORARY B ARRIERS AND C RASH C USHIONS 1.
1 Utility Work Zone Traffic Control Utility Workers, Foremen and Supervisors Module FHWA Grant No. DTFH61-06-G Developed by: Wayne State University.
Appendices Subpart R Steel Erection
Temporary Traffic Control Standards Update. Why? Came into this position soon after TC details became TTC standards about 1.5 years ago (2/13/2013) As.
October 1, 2014 David Rush Work Zone Safety Program Manager, Traffic Engineering Division 2014 Work Zone Safety Team Reviews.
Office of Traffic, Safety and Technology Chapter 2 Signing Overview Traffic Signs 101 November 20, 2014.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
DROP IN ANCHOR DETAIL COMMERCIAL SERIES LIFTS INSTALLATION MANUAL Drop In Anchor/COMMERCIAL SERIES.
Wisconsin Contractor-Engineer Conference January 22, 2009 Safety Apparel, FHWA Work Zone Safety Subpart K Rule & Permanent Concrete Barriers Bill Bremer,
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
STATE WIDE SIGN GUIDE This guide will demonstrate various sign mounting products and procedures for construction and maintenance.
Highways and Airports Engineering Project Lecture 2 Highway Signs and Markings Cairo University Faculty of Engineering Public Works Department Dr. Dalia.
Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets Traffic Control Plan Development Course.
SW Region Construction Conference February 19 th 2015 Jim Romanowski – Work Zone Engineer Traffic Section – SW Region Madison Office.
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
Minimum Sign Retroreflectivity Requirements Updated August 2012 with compliance date revisions.
Signs Signals and Pavement Markings
Road Ranger / TMC Operator Joint Training Module 101 MODULE 10 MODULE 10 Road Ranger Work Zones.
2003 MUTCD Chapter 2A Signs General. 2A.06 Design of Signs  Add to the support statement “General appearance” of sign legends, colors, and sizes shown.
Understanding Work Zones
2012 Work Zone Inspection For LTF Nancy Avery, LTF Project Supervisor December 6, 2012.
REVIEW OF THE PROPOSED SIGNIFICENT REVISIONS TO THE 2011 VIRGINIA WORK AREA PROTECTION MANUAL Fall 2014 Virginia ATSSA Chapter Meeting October 1, 2014.
Unit 2: Signs, Signals, and Roadway Markings
Sign Structures Updates: Helpful Tips for Inspectors
Construction zones and traffic control Objective Review extent of problem Identify contractor responsibilites Identify control plan components.
Training Safety Tip Cone Placement – Advanced Warning.
Ezzeldin Benghuzzi, P.E UPDATE TRAINING Contact Information: Ezzeldin Benghuzzi, P.E ezzeldin. Contact Information:
Design Standards 1 Marshall Douberley 2012 UPDATE TRAINING Contact Information: Marshall Douberley Earl.
Work Zone Safety Virginia Work Area Protection Manual International Municipal Signal Association March 8, 2016 Paul Kelley & Ginger Quinn WZ Safety Coordinators.
2011 Road School Work Zone Traffic Control Handbook.
Table Discussions 2015 SE Meeting. Scenario #1-Project Completion A $1 million bridge replacement project has a completion date of August 1 th. This date.
5/12/2006 District Engineer Presentation Pavement Marking Activities and Performance.
Maintenance and Temporary Traffic Control
IMUTCD–Recent Revision, Panel Sign Standards & OHSSI Lalit Garg, P.E. Traffic Administration, INDOT March 9, 2016.
FLORIDA DEPARTMENT OF TRANSPORTATION MAINTENANCE RATING PROGRAM.
New MUTCD Requirements for Operations
Signing Plan Design - At Grade Intersections TEM Chapter 6-8
2016 OBRA TEAM TIME TRIAL CHAMPIONSHIP May 21th, 2016.
Traffic Control Devices
Review of Revised SP 150 – Traffic Control Dated February 01, 2017
Acceptance Process for Manufactured Products by Certification:
Traffic Operations Division
Example of cones and signs as traffic control at a roadway incident.
MODULE 10 Road Ranger Work Zones
ACEC Designer Training
Presentation transcript:

Welcome to Inspecting Maintenance of Traffic Items on Projects Name/Background - Stefanie Maxwell, graduated from Georgia Tech with BS in Civil Engineering, started working for the Department, 2 weeks after graduating from college, started as a Professional Engineer Trainee in D2; have worked for Department for 16 years, 10 years of which were in the field inspecting maintenance of traffic as a Project Engineer and Permits Engineer, and 6 years as a Specialty Engineer for Maintenance of Traffic issues. Determine makeup of class; i.e., Department employees, consultants, contractors? Presented by: Stefanie D. Maxwell, P.E. FDOT Central Office Construction February 2010

Goal Quickly and correctly inspect maintenance of traffic (MOT) items Using the tools provided Determine whether the MOT items are in compliance with the contract My goal for you is: You will be able to quickly and correctly inspect MOT items, using the tools and resources provided in the training, and determine whether the MOT items are out of compliance with the contract. The tools and resources can then be used to document incompliance and ultimately bring the items back into compliance with the contract.

How did we determine what MOT items? MOT Process Reviews Review 4 districts per year Concurrence with the Contract Resource: Guidelists and Critical Requirements http://www.dot.state.fl.us/construction/CONSTADM/guidelist/guideindex.shtm How did we determine what MOT items to discuss? Because of the opportunities for improvements discovered from performing Maintenance of Traffic (MOT) process reviews, this training course was put together and includes a presentation with hands-on training, to teach students how to quickly and correctly inspect pavement markings, work zone sign supports, temporary traffic control devices and a few other miscellaneous MOT items. Maintenance of Traffic Reviews are typically performed in 4 districts per year, where the remaining 4 districts are reviewed in the following year, about one per quarter, evaluating each district on a two year cycle. The reviews consist of on-site project visits to review the MOT setup as well as a review of the required documentation in the project files. The field visits are followed up with free training (this course) for the district, inviting construction, maintenance, consultant personnel and contractors. The training topics vary as the most frequently occurring opportunities for improvements are discovered when performing MOT Reviews throughout the state. Last year, the most frequently occurring opportunities for improvements were inspection of: pavement markings, work zone sign supports, and temporary traffic control devices. This year we are going to focus on Barrier and Crash Cushions. Critical Requirements

Outline Inspecting Pavement Markings Inspecting Work Zone Signs and Supports Inspecting Temporary Traffic Control Devices Miscellaneous MOT Issues Last year, the most frequently occurring opportunities for improvements were inspection of: pavement markings, work zone sign signs and supports, and temporary traffic control devices. This year we are going to focus on Barrier and Crash Cushions. The three topics that we are going to touch on today are: Inspecting Pavement Markings Inspecting Work Zone Signs and Supports And Inspecting Temporary Traffic Control Devices

Inspecting Pavement Markings We will start with Inspecting Pavement Markings

Inspecting Pavement Markings Test pavement markings Retroreflectivity Thickness (Thermo) Pavement markings are tested for retroreflectivity and thickness (only for thermoplastic).

Inspecting Pavement Markings Florida Sampling and Testing Method FM 5-541 Located on State Materials Office website: Link to FSTM's Retroreflectivity Average of 3 retroreflectivity measurements One at the beginning, middle, and end of each one mile section. Take in the direction of travel. Thickness (Thermo) Take average of 3 location measurement (avg. of 3 dial gauges) at the beginning, middle, and end of each one mile section of line type (i.e. color, solid, skip). When inspecting pavement markings, the Specifications require that you measure, record and certify pavement markings in accordance with FM 5-541. The Florida Sampling and Testing Methods are located on the State Material’s Office website and the link is provided on the slide. The FM requires that you average 3 retroreflectivity measurements – one at the beginning, middle and end of each one mile section, and it is required to be taken in the direction of travel.

Inspecting Painted Pavement Markings Specifications 710-4.3 Retroreflectivity (Initial) 300 white 250 yellow Minimum retroreflectivity 150 for both white and yellow Contractor to submit certification for retroreflectivity but FDOT has 3 days from receipt of the certification to verify that it meets initial values When inspecting painted pavement markings, Specifications 710-4.3 provide the requirements for retroreflectivity. The initial retroreflectivity requirements are 300 for white and 250 for yellow. The minimum retroreflectivity allowed by the spec is 150 for both colors. Contractor is responsible for submitting certification for retro at any time and FDOT has 3 days from receipt of cert to verify initial numbers

Form number 700-050-70 Put copy of Retroreflectivity form here This is certification form. You can find this form at the link at the bottom of the form. http://formserver.dot.state.fl.us/capture/listings/FormListing.aspx?ListType=FormNumber

Inspecting Thermoplastic Pavement Markings Specifications 711-4.3 - Retroreflectivity – Standard Double Drop Thermo 450 white 350 yellow 180 days observation period Contractor submits certification for retroreflectivity Retroreflectivity of thermoplastic in accordance with Specifications, Subarticle 711-4.3, Florida Test Method 5-541. Retro 450 – white, 350 – yellow; contractor to certify retro, maintain 450 and 350 for 180 days. PART A - Project Based Testing of Traffic Marking Materials 2. TYPES OF TESTING REQUIRED: 2.1 Thickness for thermoplastic materials 2.2 Retroreflectivity for all traffic marking materials 3. EQUIPMENT: 3.1 Traffic Striping Thickness gauge as described in Section 4.1(Fig. 1). Thickness gauges may be purchased or fabricated. 3.2 Utilize a 30 meter retroreflectometer meeting the requirements of ASTM E 1710. 4.2 Retroreflectivity: Perform three retroreflectivity measurements, one at the beginning, middle, and end of each one mile section. A total of three readings are required and the average is used for acceptance. Retroreflectivity measurements shall be taken in the direction of travel. Calibrate the instrument at the beginning of each day of use per the manufacturer’s instructions. Perform additional calibrations if testing conditions change, e.g. substantial change in ambient temperature or irregular readings. 4.2.1 Longitudinal Lines Take measurements at the beginning, middle, and end of each one mile section of line type (i.e. color, solid, skip). 4.2.2 Messages, Symbols, and Transverse Lines Perform at a minimum, one retroreflectivity measurement at one message, one symbol and one transverse line per intersection. Take one measurement per mile for locations other than intersections (i.e. school messages, railroad messages, bike symbols, etc.)

Inspecting Thermoplastic Pavement Markings Thickness – Standard Double Drop Thermo Minimum: 100 mils or 0.100 inches Maximum: 150 mils or 0.150 inches Thermo is required to meet the thickness requirements of the Specifications, Subarticle 711-4.2.1, Florida Test Method 5-541, 0.100 inches minimum to 0.150 inches maximum for double drop bead thermoplastic. From FM 5-541: 4.1 Thickness: Measure the thickness of thermoplastic striping using an apparatus employing three dial indicators with the measuring points spaced 2 ½ inches apart (see Figure 1). Center the thickness gauge over the marking material in an area avoiding glass spheres and read the values of all three dial indicators. The location thickness measurement is the average of the three dial indicators. Take one measurement at the beginning, middle, and end of each one mile section of line type (i.e. color, solid, broken/skip). The average of the three location measurements shall be used for acceptance of the one mile section of line type.

Inspecting Thermoplastic Pavement Markings Audible/Vibratory Markings Retroreflectivity 300 – white and 250 - yellow Thickness Base Line: 79 to 120 mils Requires transverse bar/bump/cookie – min height 0.45 inches or 450 mils, including base line The audible vibratory markings and wet weather markings have a different base line thickness. Audible and vibratory markings base line thickness is 79 to 120 mils and requires transverse audible bars (bumps/cookies). Minimum height on audible bars: 0.45 inches, includes base line. 4.1 Thickness: Measure the thickness of thermoplastic striping using an apparatus employing three dial indicators with the measuring points spaced 2 ½ inches apart (see Figure 1). Center the thickness gauge over the marking material in an area avoiding glass spheres and read the values of all three dial indicators. The location thickness measurement is the average of the three dial indicators. Take one measurement at the beginning, middle, and end of each one mile section of line type (i.e. color, solid, broken/skip). The average of the three location measurements shall be used for acceptance of the one mile section of line type. Thermo Cookie Thermo Bump

Inspecting Thermoplastic Pavement Markings Wet Weather Markings Retroreflectivity 300 – white, 250 – yellow Thickness Measurements Profile Marking: 155 mils min. for profile height at one inch on center, base line of 35 to 50 mils height Flat line – 100 to 150 mils thickness 702-4.2 Thickness and Dimensions of Markings: For flat thermoplastic markings with wet reflective elements, provide a thickness of 0.10 to 0.15 inches when measured above the pavement surface. For profiled thermoplastic markings, provide a minimum height of 0.155 inches for the profile when measured above the pavement surface. Provide a baseline thicknessof of 0.035 to 0.050 inches. Provide individual profiles across the full width of the marking at approximately 1.0 inch on center with a space between profiles of 0.090 to 0.310 inches. 702-4.3 Dimensions of Audible Bumps: Apply the raised bump with a profile such that the leading and trailing edge are sloped at a sufficient angle to create an audible and vibratory warning. Bumps on shoulder and centerline markings shall have a minimum height of 0.45 inches, including the base line. The height shall be measured above the pavement surface, after application of reflective elements. Bumps shall have an approximate length of 2.5 inches. Bumps may have a drainage channel, the width of each drainage channel will not exceed 1/4 inch at the bottom of the channel. The longitudinal distance between bumps shall be approximately 30 inches. 702-4.4 Retroreflectivity: Apply white and yellow traffic stripes and markings that will attain an initial dry retroreflectivity of not less than 300 mcd/lx·m2 and not less than 250 mcd/lx·m2, respectively, and also attain an initial wet retroreflectivity of not less than 150 mcd/lx·m2 and not less than 125 mcd/lx·m2, respectively. ASTM E2177 shall be used to measure the wet retroreflectivitity. The dry retroreflectance of the white and yellow pavement markings at the end of the three year service life shall not be less than 150 mcd/lx·m2, and also the wet retroreflectivity at the end of the service life shall not less than 75 mcd/lx·m2. 4.1 Thickness: Measure the thickness of thermoplastic striping using an apparatus employing three dial indicators with the measuring points spaced 2 ½ inches apart (see Figure 1). Center the thickness gauge over the marking material in an area avoiding glass spheres and read the values of all three dial indicators. The location thickness measurement is the average of the three dial indicators. Take one measurement at the beginning, middle, and end of each one mile section of line type (i.e. color, solid, broken/skip). The average of the three location measurements shall be used for acceptance of the one mile section of line type. Wet Reflective Elements in flat line Profile Marking

Inspecting Work Zone Signs We will move to Inspecting Work Zone Signs

Work Zone Signs Sign supports in compliance with: Vendor drawing on QPL http://www.dot.state.fl.us/specificationsoffice/ProductEvaluation/QPL/QPLMOTIndex.shtm Design Standards - 600 Series http://www.dot.state.fl.us/rddesign/rd/rtds/10/2010Standards.shtm Specs – Section 102 http://www2.dot.state.fl.us/SpecificationsEstimates/Implemented/2010Bk/2010Bk.aspx There are three common places to look for information on work zone sign supports. The Vendor Drawings on the QPL, the Design Standards – Index 600 Series and Specifications – Section 102. Install sign supports in accordance with Vendor drawings on QPL, Design Standards, Index 600, and Specifications, Article 102-9.

Work Zone Signs QPL # labeled on sign support Make sure that the QPL number for sign support is labeled per Specifications, Article 102-9 for both post-mounted and portable.

Work Zone Signs Verify work zone sign supports are on QPL QPL Website: http://www.dot.state.fl.us/specificationsoffice/ProductEvaluation/QPL/QPLMOTIndex.shtm Verify that the labeled work zone sign supports are on the QPL. Here is the website link and a snapshot of what it looks like.

Work Zone Signs Verify sign supports are installed in accordance with the Vendor Drawings on QPL Verify that the sign supports are installed in accordance with the vendor drawings, portable or post mounted.

Work Zone Signs Verify Sheeting Retroreflectivity Specifications 994-5 ASTM-4956 80% of values in table Specifications 102-9 ATSSA Quality Guidelines for Temporary Traffic Control Devices and Features Sheeting retroreflectivity in accordance with Specifications, Article 994-5, ASTM D-4956, and 80 % of values in table.

Work Zone Signs Design Standard Index #600, Sheet 6

Work Zone Signs Number of u-channel Posts depends on Sign Size 1 2 u-channels 3 u-channels This is the table from Index 600, Sheet 6. Number of u-channel posts depends on sign size

Work Zone Signs Clear height depends on Post size: 3 lb/ft up to 10 feet clear height 4lb/ft up to 12 feet clear height Foundation Depth depends on post size: 4 feet for 3 lb/ft 4.5 feet for 4 lb/ft Exceptions: Foundation depth in rock Soil plate not required in rock, asphalt and shoulder pavement, and sidewalk. This is the table from Index 600, Sheet 6. Clear height depends on post size Foundation depth depends on post size Soil plated required minimum 4 inches below ground – see exceptions in table for installing in asphalt roadway or shoulder or in rock.

Ground line at centerline of sign Work Zone Signs Clear Height Bottom of Sign 10 feet for 3 lb/ft 12 feet for 4 lb/ft Clear height depends on post size 7 foot mounting height required on all wz signs Ground line at centerline of sign

Work Zone Signs Mounting height Bottom of Sign 7 feet min Measured from a line projected from the edge of travel way elevation

Work Zone Signs Spliced Post Mounted Supports Stub Height Design Std - Maximum Stub height is 4 inches Vendor Drawing allows 0 to 4 inches from existing ground (cannot be below ground) Stub Height > 4” WRONG Design Standards, Index 600, Sheet 6

Work Zone Signs Spliced Post Mounted Supports Top Bolt 1 inch minimum from top of stub or cutting edge Minimum 1 inch Design Standards, Index 600, Sheet 6

Work Zone Signs Spliced Post Mounted Supports Vendor Drawings require Base Post in Front (traffic approaching) Sign Post in Back Sign Post Base Post

Work Zone Signs Spliced Post Mounted Supports Splice overlap Vendor Drawings require 6 inches for both types Minimum 6 inches overlap

Work Zone Signs Spliced Post Mounted Supports Bolt Spacing Vendor Drawings require 4 inches for both types Bolts spacing should be 4” WRONG

Work Zone Signs Spliced Post Mounted Supports Same size posts for splice Vendor Drawings require base post and sign post to be the same size. WRONG

Work Zone Signs Post mounted Work Zone Sign Supports - Nucor Marion Rib back 3 #/ft 4 #/ft

Work Zone Signs Post mounted Work Zone Sign Supports Franklin Franklin

Work Zone Sign Supports Nucor Marion soil plate

Work Zone Sign Supports Franklin soil plate

Work Zone Sign Supports Nucor Marion splice detail - connectors

Work Zone Sign Supports Franklin splice detail - connectors

Work Zone Sign Supports The project information sign shall be used when called for in the plans 4 #/ft spliced posts required

Work Zone Signs Portable sign supports do not require light or flag Portable sign supports do not require light or flag. Per Index 600, only post mounted signs require light and flag.

Inspecting Temporary Traffic Control Devices

Temporary Traffic Control Devices Sheeting Retroreflectivity QPL # on device and light

Temporary Traffic Control Devices Qualified Products List contains many products Pavement Markings – Paint, Thermo, RPMs, etc. Traffic Control Devices – Barricades, Drums, Warning Lights, CMS, etc. Work zone sign supports – effective July 2007

Temporary Traffic Control Devices QPL Alleged Deficiency Form # 630-020-01

Miscellaneous MOT Issues

High Visibility Safety Apparel Index 600, Sheet 4

High Visibility Safety Apparel All workers within Right-of-Way shall wear: ANSI/ISEA 107-2004 Class 2 Apparel Orange or Yellow/Green in Color All flaggers within Right-of-Way shall wear: Daytime - ANSI/ISEA 107-2004 Class 2 Apparel Nighttime - ANSI/ISEA 107-2004 Class 3 Apparel Orange or Yellow/Green in Color

Placement of Stripe 24 foot roadway – includes stripes

Placement of Stripe – Index 600 Striping layout for 3 – 12’ lanes: 5”, 11’7”, 12’, 11’7”, 5” = 36’ 5” 11’7” 12’ 11’7” 5”

Placement of Stripe Index 518

Placement of Stripe – 11’7” from center to center of stripes 2” 2” 11’7” 6 inch stripe Placement of Stripe – 11’7” from center to center of stripes

Center to Center will be 11’7” Placement of Stripe Center to Center will be 11’7”

Questions? Contact Stefanie D. Maxwell, P.E. stefanie.maxwell@dot.state.fl.us (850) 414-4314 Stefanie’s Hwy Next Exit