Presentation is loading. Please wait.

Presentation is loading. Please wait.

Ezzeldin Benghuzzi, P.E. 2012 UPDATE TRAINING Contact Information: Ezzeldin Benghuzzi, P.E. 850-414-4352 ezzeldin. Contact Information:

Similar presentations


Presentation on theme: "Ezzeldin Benghuzzi, P.E. 2012 UPDATE TRAINING Contact Information: Ezzeldin Benghuzzi, P.E. 850-414-4352 ezzeldin. Contact Information:"— Presentation transcript:

1 Ezzeldin Benghuzzi, P.E. 2012 UPDATE TRAINING Contact Information: Ezzeldin Benghuzzi, P.E. 850-414-4352 ezzeldin. benghuzzi@dot.state.fl.us Contact Information: Stefanie D. Maxwell, P.E. 850-414-4314 Stefanie.Maxwell@dot.state.fl.us

2 Design Standards 2 Ezzeldin Benghuzzi, P.E. Fatality Analysis Reporting System (FARS) Work Zone Fatalities YearUSFL 20051074162 20061004118 2007835 92 2008720 81 2009680 82 2010576 43 08/06/12

3 Design Standards 3 Ezzeldin Benghuzzi, P.E. 2012 Design Standards Summary of Major Changes Effective July 1, 2012 08/06/12

4 Design Standards 4 Ezzeldin Benghuzzi, P.E. Effective July 1 st,2012 High-Visibility Safety Apparel 4 Shall meet ANSI/ISEA 2010 and 2004 – No changes to the Performance Class scheme – Requirements for rainwear background fabric – Changes related to design features – Optional criteria for Flame Resistant items – Guidance on service life of apparel 08/06/12

5 Design Standards 5 Ezzeldin Benghuzzi, P.E. Rumble Strips MUTCD 5 08/06/12

6 Design Standards 6 Ezzeldin Benghuzzi, P.E. Index 600 Sheet 4 6 Removable Polymer Rumble Strip 08/06/12

7 Design Standards 7 Ezzeldin Benghuzzi, P.E. Index 600 Sheet 4 7 Removable Polymer Rumble Strip 08/06/12

8 Design Standards 8 Ezzeldin Benghuzzi, P.E. Index 600 Sheet 4 8 Removable Polymer Rumble Strip 08/06/12

9 Design Standards 9 Ezzeldin Benghuzzi, P.E. Index 600 Sheet 4 9 Molded Engineered Polymer Rumble Strip Effective July 1 st,2012 08/06/12

10 Design Standards 10 Ezzeldin Benghuzzi, P.E. Index 600 Sheet 4 10 Molded Engineered Polymer Rumble Strip Effective July 1 st,2012 08/06/12

11 Design Standards 11 Ezzeldin Benghuzzi, P.E. Index 600 Sheet 4 11 Molded Engineered Polymer Rumble Strip Effective July 1 st,2012 08/06/12

12 Design Standards 12 Ezzeldin Benghuzzi, P.E. Index 600 Sheet 4 12 Molded Engineered Polymer Rumble Strip Effective July 1 st,2012 08/06/12

13 Design Standards 13 Ezzeldin Benghuzzi, P.E. Index 600 Sheet 4 13 PLAN PREPARATION MANUAL PAY ITEM 102-910- TEMPORARY RAISED RUMBLE STRIP PER SET PER DAY Effective January 1 st,2013 08/06/12

14 Design Standards 14 Ezzeldin Benghuzzi, P.E. Index 600 Sheet 6 14 General Information For Traffic Control Through Work Zones Effective January 1 st,2013 08/06/12 Effective July 1 st, 2012

15 Design Standards 15 Ezzeldin Benghuzzi, P.E. Index 600 Sheet 11 15 PLACEMENT OF BUSINESS ENTRANCE SIGNS AND CHANNELIZING DEVICES AT BUSINESS ENTRANCE Effective January 1 st,2013 08/06/12

16 Design Standards 16 Ezzeldin Benghuzzi, P.E. Index 600 Sheet 11 16 TEMPORARY LANE SEPARATOR Effective January 1 st,2013 08/06/12

17 Design Standards 17 Ezzeldin Benghuzzi, P.E. Index 600 Sheet 11 17 TEMPORARY LANE SEPARATOR 08/06/12

18 Design Standards 18 Ezzeldin Benghuzzi, P.E. Index 600 Sheet 12 18 Longitudinal Channelizing Devices (LCD) Effective July 1 st,2012 08/06/12

19 Design Standards 19 Ezzeldin Benghuzzi, P.E. Index 600 Sheet 12 19 Longitudinal Channelizing Devices (LCD) Vehicle Longitudinal Channelizing Devices 08/06/12

20 Design Standards 20 Ezzeldin Benghuzzi, P.E. Index 600 Sheet 12 20 Longitudinal Channelizing Devices (LCD) Effective January 1 st,2013 08/06/12

21 Design Standards 21 Ezzeldin Benghuzzi, P.E. Index 600 Sheet 12 21 Longitudinal Channelizing Devices (LCD) Pedestrian Longitudinal Channelizing Devices 08/06/12

22 Design Standards 22 Ezzeldin Benghuzzi, P.E. Index 600 Sheet 12 22 Longitudinal Channelizing Devices (LCD) Pedestrian Longitudinal Channelizing Devices 08/06/12

23 Design Standards 23 Ezzeldin Benghuzzi, P.E. Index 600 Sheet 12 23 Longitudinal Channelizing Devices (LCD) Pedestrian Longitudinal Channelizing Devices 08/06/12

24 Design Standards 24 Ezzeldin Benghuzzi, P.E. Index 619 Sheet 1 24 Multilane, Mobile Operations Work on Shoulder, Work Within Travel Way Effective July 1 st,2012 08/06/12

25 Design Standards 25 Ezzeldin Benghuzzi, P.E. Index 619 Sheet 2 25 Multilane, Mobile Operations Work on Shoulder, Work Within Travel Way Effective July 1 st,2012 08/06/12

26 Design Standards 26 Ezzeldin Benghuzzi, P.E. Index 660 Sheet 1 26 Pedestrian Control For Closure of Sidewalks Effective January 1 st,2013 08/06/12

27 Design Standards 27 Ezzeldin Benghuzzi, P.E. Concrete Barrier System Index 414 Effective July 1 st,2012 08/06/12

28 Design Standards 28 Ezzeldin Benghuzzi, P.E. Steel Barrier System Index 414 Steel Barrier System Index 414 08/06/12

29 Design Standards 29 Ezzeldin Benghuzzi, P.E. Steel Barriers 4 Systems:  Barrier Guard  Orion  Vulcan  Zone Guard 08/06/12

30 Design Standards 30 Ezzeldin Benghuzzi, P.E. Steel Barriers 08/06/12

31 Design Standards 31 Ezzeldin Benghuzzi, P.E. Steel Barrier System Index 414 & QPL Steel Barrier System Index 414 & QPL Steel Barrier is alternate design to Type K Barrier! 08/06/12

32 Design Standards 32 Ezzeldin Benghuzzi, P.E. Temporary Barriers Index 415 units constructed prior to October 1, 2002 may be used until September 30, 2012 THROUGH JUNE 30, 2012 LETTING with usage of ‘FDOT Snake Pin’ Interconnection Concrete Barrier System Index 415 08/06/12

33 Design Standards 33 Ezzeldin Benghuzzi, P.E. Concrete Barrier System Index 415 Effective July 1 st,2012 08/06/12

34 Design Standards 34 Ezzeldin Benghuzzi, P.E. Concrete Barrier System Index 415 Effective July 1 st,2012 08/06/12

35 Design Standards 35 Ezzeldin Benghuzzi, P.E. Concrete Barrier System Index 415 Effective July 1 st,2012 08/06/12

36 Design Standards 36 Ezzeldin Benghuzzi, P.E. Concrete Barrier system Index 415 08/06/12

37 Design Standards 37 Ezzeldin Benghuzzi, P.E. Concrete Barrier system Index 415 08/06/12

38 Design Standards 38 Ezzeldin Benghuzzi, P.E. Concrete Barrier System Index 415 Effective July 1 st,2012 08/06/12

39 Design Standards 39 Ezzeldin Benghuzzi, P.E. Concrete Barrier System Index 415 Effective July 1 st,2012 08/06/12

40 Design Standards 40 Ezzeldin Benghuzzi, P.E. Concrete Barrier System Index 415 Effective July 1 st,2012 08/06/12

41 Design Standards 41 Ezzeldin Benghuzzi, P.E. Barrier Wall End Anchor Plates Redirective crash cushions are the principle device to shield approach ends of barrier wall Redirective crash cushions are the principle device to shield approach ends of barrier wall Temporary Crash Cushions 08/06/12

42 Design Standards 42 Ezzeldin Benghuzzi, P.E. Temporary Crash Cushions 08/06/12

43 Design Standards 43 Ezzeldin Benghuzzi, P.E. Barrier Wall End Anchor Plates Where barrier wall end units are not anchored, 2 and ½ wall units (min.) are required beyond the length of barrier need for wall end anchorage Temporary Crash Cushions 08/06/12

44 Design Standards 44 Ezzeldin Benghuzzi, P.E. Crash Cushion Attached to Barrier Systems Temporary Crash Cushions Crash Cushion 08/06/12

45 Design Standards 45 Ezzeldin Benghuzzi, P.E. Temporary Crash Cushions FDOT Criteria  VENDOR DRAWINGS TL-2 (45 mph or less) TL-3 (50 mph or greater)  SPEEDS Interpolating at 5 mph increments Extrapolating for speeds above 60 mph is no longer allowed (FHWA Recommendation) 08/06/12

46 Design Standards 46 Ezzeldin Benghuzzi, P.E. Temporary Crash Cushions FDOT Design Requirements Station/Offset Type of Crash Cushion (TL-2 or TL-3) Speed Width - Narrow vs. Wide Length Restrictions MOT Phase (Temporary) Use Type K barrier pay item 08/06/12

47 Design Standards 47 Ezzeldin Benghuzzi, P.E. Plans : Temporary Crash Cushions Summary of Temporary Crash Cushions MOT PhaseStation Offset (feet) Side Work Zone Speed (mph) Test Level (TL-2 or TL-3) Width of hazard (inches) Length Restrictions (feet) Phase 1122+9016Rt.55TL-324 inchN/A Phase 2145+2716Lt.45TL-248 inch14 08/06/12

48 Design Standards 48 Ezzeldin Benghuzzi, P.E. Crash Cushions (QPL) Effective July 1 st,2012 08/06/12

49 Design Standards 49 Ezzeldin Benghuzzi, P.E. Crash Cushions (QPL) Effective July 1 st,2012 08/06/12

50 Design Standards 50 Ezzeldin Benghuzzi, P.E. Crash Cushions (QPL) Effective July 1 st,2012 08/06/12

51 Design Standards 51 Ezzeldin Benghuzzi, P.E. Crash Cushions (QPL) 08/06/12

52 Design Standards 52 Ezzeldin Benghuzzi, P.E. Crash Cushions (QPL) Effective July 1 st,2012 08/06/12

53 Design Standards 53 Ezzeldin Benghuzzi, P.E. Crash Cushions (QPL) 08/06/12

54 Design Standards 54 Ezzeldin Benghuzzi, P.E. Crash Cushions (QPL) 08/06/12

55 Design Standards 55 Ezzeldin Benghuzzi, P.E. Temporary Crash Cushions 08/06/12

56 Design Standards 56 Ezzeldin Benghuzzi, P.E. Single Post Median Barrier Mounted Sign Support 08/06/12

57 Design Standards 57 Ezzeldin Benghuzzi, P.E. Temp. Signs Mounted on Barrier 08/06/12

58 Specifications 58 08/06/12 Ezzeldin Benghuzzi, P.E. 08/06/12 58 Traffic Control Officer

59 Specifications 59 08/06/12 Ezzeldin Benghuzzi, P.E. 08/06/12 59 Business Signs

60 Specifications 60 08/06/12 Ezzeldin Benghuzzi, P.E. 08/06/12 60 Temporary Crash Cushion (Redirective/Gating)

61 Specifications 61 08/06/12 Ezzeldin Benghuzzi, P.E. 08/06/12 61 Temporary Raised Rumble Strips

62 Specifications 62 08/06/12 Ezzeldin Benghuzzi, P.E. 08/06/12 62 Temporary Lane Separator

63 Specifications 63 08/06/12 Ezzeldin Benghuzzi, P.E. 08/06/12 63 Payment Items

64 MOT Training 64 Ezzeldin Benghuzzi, P.E 08/06/12 Ezzeldin Benghuzzi, P.E 08/06/12 64 MOT Training

65 Design Standards 65 Ezzeldin Benghuzzi, P.E. 08/06/12


Download ppt "Ezzeldin Benghuzzi, P.E. 2012 UPDATE TRAINING Contact Information: Ezzeldin Benghuzzi, P.E. 850-414-4352 ezzeldin. Contact Information:"

Similar presentations


Ads by Google