USPTO Seal Trademark Public Advisory Committee Status of the OCIO John B. Owens II Chief Information Officer August 28, 2009.

Slides:



Advertisements
Similar presentations
Abstract To provide efficient and effective access to enterprise information that meets stakeholder needs and supports mission success, NASA is implementing.
Advertisements

1. 2 August Recommendation 9.1 of the Strategic Information Technology Advisory Committee (SITAC) report initiated the effort to create an Administrative.
Course: e-Governance Project Lifecycle Day 1
USPTO Seal Patent Public Advisory Committee Meeting John B Owens II Chief Information Officer July 8, 2010.
CARICOM. Ninth EDF Project Caribbean Integration Support Programme (CISP ) Statistics Component 34th MEETING OF THE STANDING COMMITTEE OF CARIBBEAN STATISTICIANS.
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
Enterprise Resource Planning
1 Dr. Djamal Ziani SAP Project Management. 2 ASAP Accelerated SAP (ASAP) is SAP's standard implementation methodology. It contains the Roadmap, a step-by-step.
Road Map Status Report – Advisory Committees June 2009 OCIO Road Map to IT Modernization How the OCIO will upgrade IT for Better Service.
EmpowHR 9.0 Upgrade Status Meeting Thursday, June 12, :30 A.M. – 4:00 P.M. (EDT)
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
A framework for describing IT Project Management Processes and Tool Set Features Enterprise Project Management Framework.
Chapter 5 IT Processes Presented by Dr. Mohamed Sammouda.
M ERP (Enterprise Resources Planning) M ERP (Enterprise Resources Planning) Session 9 - ERP Implementation Ir. Ekananta Manalif, MM, MKom (D2664)
Managing the Information Technology Resource Jerry N. Luftman
Oracle General Ledger, Financial Reporting and Data Warehouse 6/22/2015 RIAS PHASE II Overview.
Nov. 13, 2003CS WPI1 CS 509 Design of Software Systems Lecture #11 Thursday, Nov. 13, 2003.
Trademark Public Advisory Committee February 2010 John B. Owens II Chief Information Officer United States Patent and Trademark Office.
Chapter 10 Information Systems Management. Agenda Information Systems Department Plan the Use of IT Manage Computing Infrastructure Manage Enterprise.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
Development and Quality Plans
National Finance Center’s 2008 Customer Forum EmpowHR 9.0 Billy Dantagnan Teracore.
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
Release & Deployment ITIL Version 3
UMT and Microsoft Presenting Tips and Tricks Basics What’s new in Microsoft Project 2010 Brian Feder, MBA, PMP Senior Vice President UMT Consulting Group.
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
Web Development Process Description
District Wide Applications November 12, District Wide Applications Process Recommendations Board Decision.
Server Virtualization: Navy Network Operations Centers
Development of Management Information System for the Forestry Sector in Viet Nam F O R M I S II Annual Work Plan 2014 Tapio Leppänen Chief Technical Adviser.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
U.S. Department of Agriculture eGovernment Program July 23, 2003 eAuthentication Initiative Agency Responsibilities and Funding Discussion eGovernment.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
16 1 Installation  After development and testing, system must be put into operation  Important planning considerations Costs of operating both systems.
Public Meeting on ERCOT’s Proposed 2004 Budget September 3, 2003 Preliminary - Subject to ERCOT Board Approval.
普 华 永 道 Phase 1: Project Preparation Phase 1: Project Preparation Phase Overview Phase Overview.
Presentation to the Information Services Board March 6, 2008 Bill Kehoe, Chief Information Officer Bill Kehoe, Chief Information Officer.
Microsoft Office Project 2003: Selling EPM in your Organization Matt Wilson Business Solutions Specialist LMR Solutions.
Project Kick-off Meeting Presented By: > > > > Office of the Chief Information Officer.
Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System.
Welcome Georgia Infrastructure Transformation 2010 Kick-off Meeting January 30, 2008.
Information Technology Assessment Findings Presented to the colleges of the State Center Community College District.
OFFICE OF INFORMATION AND TECHNOLOGY SERVICE DELIVERY AND ENGINEERING Briefing to Industry DEPARTMENT OF VETERANS AFFAIRS Charles De Sanno TAC APBI, Eatontown,
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Sample Fit-Gap Kick-off
UNIFY Performance - Summary Plans
Systems Analysis and Design in a Changing World, 4th Edition
M ERP (Enterprise Resources Planning)
Enterprise Content Management Owners Representative Contract Approval
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Patent Public Advisory Committee Meeting
STATE OF NEW MEXICO STATE PERSONNEL OFFICE (SPO)
Phase 1 Tollgate Review Discussion Template
Kickoff Presentation Date of Presentation Presenter Name
Royalty Accounting and Revenue Processing System (RAPS) Certification
Mary W. Anaya Stephanie R. Gallegos November 19, 2008
General Services Department (GSD) August 22, 2018
ONGARD Modernization Closeout Certification Presentation for PCC Energy, Minerals and Natural Resources Department State Land Office Taxation and Revenue.
By Jeff Burklo, Director
Road Map Status Report – Advisory Committees June 2009
Patent Public Advisory Committee Meeting
Department of Licensing HP 3000 Replatforming Project Closeout Report
Data Migration Assessment Jump Start – Engagement Kickoff
Presentation to Project Certification Committee, DoIT August 24, 2008
{Project Name} Organizational Chart, Roles and Responsibilities
SHARE Special Project Enterprise Learning Management Pilot Project Planning/Implementation Certification December 17, 2014 Requesting Agency: Cassandra.
SHARE Special Project SHARE Benefits Optimization
Presentation transcript:

USPTO Seal Trademark Public Advisory Committee Status of the OCIO John B. Owens II Chief Information Officer August 28, 2009

2 Overall Message All major initiatives are on track except: –Organizational Strengthening – Human Capital Plan –Disaster Recovery – Additional infrastructure servers and switches for the remote facility –Desktop Stabilization – Desktop Management tool selection & core configuration deployment All are dependant on resource availability and delayed to FY 2010 Y Y Y

3 OCIO Funding Reductions October 1, 2008 Sept 31, 2009  Compensation  Business Projects  Note: Some projects were intended to replace aging systems (PFW, OACS, EAST)  Road Map Projects  Operations & Maintenance Total Reduction = $60 Million From our FY 2009 Spending Plan $67 $44 $37 $139.5 $61 $7 $30 $129

4 Hiring Status OCIO Position Ceiling – 549 Current On-Board – 457 Vacancies – 92 Authorized to Pursue Remaining – 12 –1 with on-board date pending –3 interviewing –3 paneling –1 no selection/re-advertise –4 authorized to advertise As of August 18, 2009

5 Details to OCIO 29 Patent and 3 Trademark resources are working to support the OCIO. Chris Doninger, a Managing Attorney, was detailed in June to be the Acting Special Assistant to the CIO on Trademarks. Two trademark examining attorneys with IT knowledge have been selected for limited work details with the OCIO. Trademark details will be for days and can be extended with the agreement of both business units and the employees.

6 Strategic Information Technology Plan (SITP) The SITP presents the course of action the Agency intends to take over the next five years for IT. The primary purpose is to establish a strategic framework for guiding the course of IT initiatives through the Agency’s strategic planning and decision making process. For FY 2010, the Roadmap will be subsumed into the integrated Agency IT plan. The Trademark portion (Chapter 7) is being re-evaluated to reflect an accelerated strategy for electronic end-to- end processing and environment separation.

7 Revised Trademark Strategy Begin planning for the separation of the Trademarks environment; deliver Concept/Definition in Q2 and Prototype in FY 2010 Includes the re-write and re-hosting of the Trademark systems to modern technologies: –Redundant, scalable, and virtually hosted –Migration from legacy technologies to modern (not cutting edge) - Example: COBOL to Java –Hosted on industry standard cloud virtual platforms and commodity hardware (Linux) –Replacement of heavy client front-ends with Web 2.0 enhanced user interfaces –Industry standard platforms and technologies: Apache/Tomcat, Documentum, Service Mix/Fuse (SOA bus), Web Publisher, MySQL and Oracle.

8 Appendix OCIO Road Map Status Report for USPTO Management (Subcommittee only, not intended for the Public Session) Status As of August 3, 2009

OCIO Road Map Status Report August 03, 2009 OCIO Road Map to IT Modernization How the OCIO will upgrade IT for Better Service

Aug 03, Summary  A total number of 61 Road Map projects (several projects have been subdivided to improve financial accounting) are tracked. This includes the following: 9 Projects that have completed -Completed Previously -SDLC 3.0 -Infrastructure Standards Process -Policy Management -FY08 PALM Improvement -Alternate Process Site Analysis -Completed this Period -EPMS -Federal Desktop Core Configuration (FDCC 1.0) -ECM Lite -SOA Strategy

Aug 03, Summary (cont …)  Break-up of Road Map Projects (continued): 45 Projects that are currently active. This includes: -18 Projects which have had an increase in scope or funding, or are net new projects -5 Projects that have had a decrease in scope or funding 7 Projects that have been deferred/stopped, due to funding or technology issues -Human Capital Strategy (delayed due to funding reduction) -Data Center Environmental Monitoring (technical priorities caused deferral to FY10) -Fire Suppression System (negotiation with City of Alexandria caused deferral to FY10- 11) -Advantage Gen Development (new Architectures are being evaluated for the 3 impacted systems) -Technology Refresh for Desktop Management (delayed due to funding reduction) -Voice System Technology Refresh (unfunded during FY09 deferred until FY12-13)

Aug 03, Summary (cont …)  Road Map Practices & Tools Road Map programs and projects continue to support the OCIO Project Management efforts through support for the early adoption of improvements in EPMS (improved automated reporting), the SDLC (project close-out procedures), status reporting (standardized monthly reports), planning, and budgeting. Contributions this period include: -Finalization of project close-out procedures -Finalization of a Road Map Frequently Asked Questions (or FAQ) document – along with accompanying responses -Initiating efforts to reduce the time for project initiation and kick-off for FY’10 projects -Improving program and project status reporting, milestones establishment, issues reporting and related matters -Moving towards automated program and project status reporting (though EPMS) -Developing year-end Road Map reporting -Developing graphical representations for Road Map Program Strategic Formulations

Aug 03, Summary (cont …)  To date the Roadmap has obligated $26.7 million (of a total of $30.2 million*). Open commitments (not yet obligated) are $2.0 million. AIS Stabilization - $574 K support for SWAT and other AIS Remediation Data Center Stabilization - $102 K Data Center technology transition support Organizational Strengthening - $202 K additional end-of-year training; and implementation and testing CPT * As of August 7, 2009

Aug 03, Individual Program Accomplishments  Organizational Strengthening The Organizational Realignment project submitted the proposed employee placement and organization structure to HR, and held multiple discussions with HR and OCIO management on the realigned OCIO organization Names for level two management were communicated to OCIO employees at the recent OCIO All Hands meeting. Level 3-4 management will be finalized and released during August/September if approved. The Skills Development Training Plan project scheduled ‘Writing Performance Work Statements’ and ‘Evaluating Contractor Performance’ training for COTRs/TOMs Completed 100% of the Corporate Planning Tool (CPT) development and unit testing, and 50% of Enterprise Data Warehouse development and unit testing (including reports)

Aug 03, Individual Program Accomplishments  Process Standardization The EPMS project deployed the EPMS Inventory dashboard, which provides a real time snapshot of all active projects in the system by program area. The project has been completed, including all project deliverables The ITIL project refined the detailed processes and procedures for Incident Management, Problem Management and Request Fulfillment, in preparation for piloting these in August The project also conducted Change Management training for ten OCIO employees and Configuration Management training for fifteen OCIO CM team members  Data Center Stabilization The Data Center FY08 Power Assessment project met with electrical engineers to agree and approve the final solution for power needs The Data Center To-Be Architecture project issued the P.O for the Server Implementation task order and began the Red Hat task order for Consultation, Documentation Support, and VMware Professional Services

Aug 03, Individual Program Accomplishments  Data Center Stabilization (cont …) The Operational Redundancy and Replace Aging Equipment project Awarded the P.O. for the second and final round of servers  AIS Stabilization The AIS SWAT Team project kicked off Analysis and Recommendations for the ACTS, OEDIS, EFSWEB, and TICRS systems See table on next page for detailed status Completed the Operational Readiness Review for all AISs ( ACTS, CIDM, EBCIS, EFOIA, OEDIS, OFIS, OLIADS) for the Documentum Software Upgrade project Completed the Deployment Phase and held briefings for all business web liaisons for the Web Site Redesign Phase III project Completed the Definition Phase for three new projects: Infrastructure Code Table Upgrade, OACS Performance Improvement Logging, and UI Redesign Study

Aug 03, Individual Program Accomplishments Legend:  =Done;  =Working;  =Not Started ; =Change occurred since last time  AIS Stabilization (cont …)

Aug 03, Individual Program Accomplishments  Desktop Stabilization Competed the Federal Desktop Core project, including all project deliverables such as testing 164 FDCC settings and the rolling deployment of 161 FDCC settings The Desktop Stabilization (DSV1) project awarded the contract for process improvement services to TOS The Symantec Endpoint Protection completed SEP console/server installation in the test environment  Service Desk Developed work instructions (standard operating procedures) for each step in the process flow for Problem Management The Service Management project completed Prioritizations and Escalations, and procedural Guidelines for Request Fulfillment; and also identified Categorizations for Standard Service Requests

Aug 03, Individual Program Accomplishments  Disaster Recovery Data Bunkering replicated 58 TB of data this period, for a total of 280 TB since the commencement of this project. This represents a completion percentage of Data Bunkering has been impacted by equipment failures in Boyers and has experienced a 3 month delay. Completion is now scheduled for early FY10 The ECM LITE project was completed, including all project deliverables (such as set-up of the Test Environment and the deployment of ECM LITE). The project also completed the migration of all artifacts from Dimensions to ClearCase The AIS Failover (for Tier-1 Systems) project completed migration of all USPTO employee production user’s mailboxes to the new Microsoft Exchange 2007 environment The Disaster Recovery Infrastructure project awarded remaining procurements for equipment (e.g., servers, racks, network hardware, and telecommunication circuits), and obtained a ‘Go’ decision to move from Design to Deployment

Aug 03, Individual Program Accomplishments  Telecommunications Stabilization The PTONET III Phase 1 project deployed the IT-West network equipment The PTONET III Firewall project deployed Juniper Firewalls into Production PTONET III EOL TRINet completed TRINet Refresh MOAs, and shipped the required hardware and software (to EPO, JPO, WIPO, KIPO and IPAU) The CIO Command Center Initial Operating Capability project, purchased and installed the required Forensic software  Enterprise Architecture Completed the SOA Strategy project, including all project deliverables (such as the High Level ‘As-Is’ and ‘To-Be’ SOA implementation and investment strategy, the enterprise SOA strategy and transition Plan, and the SOA high level governance plan)

Aug 03, Detailed Status Reports Road Map Financial Summary (non-comp)

Aug 03, Detailed Status Reports Road Map Financial Summary (comp & totals) July 2009 June 2009 Status Reports for Each Program  Attached

Aug 03, Significant Issues & Risks  Data Center Power/Network Connectivity MDW/E data center facilities were at 96% of power and network capacity (start of FY09). Current utilization is 94% with 72 KW free. Equipment installations will be impacted Mitigation efforts include: -Short-term [1 to 3 months] - Completed Shutdown of non-utilized systems. Coordinate with AIS Stabilization -Mid-term [3 to 18 months] - 50% complete Move IT West data center to single power service, temporarily lose redundancy (development laboratory) – Completed – gain 90KW Move IT West data center (development/testing) to local battery. Facility remains on generator and will be redundant – gain 110KW (additionally restore 90KW (above) to redundant operation) -Long-term - [2 to 3 years] Expand Boyers facility (FY10-11). Procure another generator for Alexandria (FY11-12). Evaluate data center alternatives (other local sites; shared facilities; commercial availability)

Aug 03, Significant Issues & Risks (cont …)  Interdependencies The CIO initiated a special project to integrate Road Map interdependencies. The Project is in the Concept phase