1 High Availability and Disaster Recovery for SQL Server 2014 in Microsoft Azure Virtual Machines
Kickoff Presentation Date of Presentation Presenter Name Presenter Title

2 Agenda Introductions Objectives Review Challenges/Solution
Current Environment & Requirements Engagement Overview Scope & Timeline Roles & Responsibilities Next steps Questions

3 Introductions 11/15/2018

4 Introductions [Project Name] Team <Introduce team members from Microsoft and customer> <Partner> Services Engagement Team Members Customer Team Members [Role 1] – [Name] One sentence profile One sentence on role responsibilities Project Manager – John or Jane Doe 15 years project management experience integrating enterprise infrastructure with focus on private cloud and virtualization. Responsible for day-to-day running of project, and for managing the plan and resources end-to-end. [Role ] – [Name] One sentence profile One sentence on role responsibilities [Customer name] team members

5 Understand the scope and schedule
Kick off the project Meet the team Understand the scope and schedule Q and A Meeting Objectives 11/15/2018

6 Moving to Microsoft Azure
Platform Today Server, Virtual Machine, Network, Storage, Database Assembly Required Patch, Service Release, New Version Custom, Inconsistent Plan for Peak Load Built to Avoid and Recover from Failure Infrastructure as a Service Automation Hardware maintained for you Operating system support Standardized On-demand scale Built to expect and withstand failure 11/15/2018

7 HADR / Backup Challenges
Backups are costly Backups increase storage cost and require a plan for off-site safe keeping HADR / Backup Challenges Apps require high Service Level Agreement (SLA)’s Critical application depending on databases must have high service level agreements or objectives DR can double costs and effort Disaster Recovery to remote data center doubles your cost 11/15/2018

8 Current Environment General questions Environmental questions
Drivers, goals, existing HADR/Backup strategy, regulations, priorities Environmental questions Storage & Capacity HADR/Backup Processes Network and Microsoft Azure readiness Systems management and security Databases Technology road map Current Environment Environment Assessment Questionnaire High-level Review

9 Business Requirements
Understand backup needs Which databases are good candidates for backup to cloud? Business Requirements Understand HADR needs Which databases are good candidates to failover in Windows Azure? Understand processes What can I do to make sure my organization is prepared for the change?

10 Identify add’l candidates
Engagement Overview SQL Server 2014 on Microsoft Azure Virtual Machines: HADR and Backup Jumpstart Follow-up work Assess Analyze Deploy Foundation Deploy Scenarios Identify add’l candidates 11/15/2018

11 Engagement Overview Assess Analyze Deploy Foundation Deploy Scenario
<Outline the objectives of the engagement that includes the current business and technical challenges as well as the scope. Below is some sample wording.> Perform an assessment of the current SQL Server environment in order to select one HADR strategy and one Backup strategy. Assess Provide guidance for envisioning, planning, and deploying a foundational SQL Server capability in Microsoft Azure Virtual Machines environment. Select a backup scenario and a high availability / disaster recovery scenario to deploy. Analyze Provide guidance on deploying Infrastructure as a Service (IaaS) Foundation in Microsoft Azure. This includes: Assisting in configuration of Microsoft Azure subscription related to this engagement. Providing guidance on configuration of virtual machines and virtual networking. Note: Setup and configuration of Microsoft Azure subscription and VPN are customer tasks. Deploy Foundation Provide guidance to deploying SQL Server 2014 HADR and backup scenarios utilizing Microsoft Azure Virtual Machines environment. Deploy Scenario

12 <Partner> Services Primary Objectives
Assess<customer> current environment and processes for SQL Server HADR and backup Provide guidance for SQL Server 2014 IaaS deployment Provide guidance for chosen SQL Server HADR and backup scenarios to Microsoft Azure 11/15/2018

13 Scope In scope Out of scope
Assess the existing SQL Server environment and processes. Provide guidance to deploy a SQL Server 2014 environment in Microsoft Azure Virtual Machines Select the optimal SQL Server HADR and Backup strategy (one each). Assistance with testing activities to validate fundamental capabilities. Informal knowledge transfer by having customer staff work alongside Microsoft. Out of scope Acquisition of Microsoft Azure subscription and virtual network configuration (should be completed one week prior to project start) Formal training Deploying any HADR/Backup scenario other than the agreed upon set of activities. Installation, configuration, or testing of non-Microsoft software. Migration of any other data to the solution Troubleshooting or remediation of existing databases. 11/15/2018

14 Offering Activities and Timeline
Week 1 Weeks 2 Week 3 Week 4 ENVISION PLAN BUILD STABILIZE Offering Activities and Timeline Project Kickoff Environment Assessment Windows Azure Configuration System Validation Roles and Responsibilities Analyze Candidates Build SQL Server environment Solution Walkthrough Vision and Scope Identify HADR & Backup options Setup HADR & Backup scenarios Project Closeout Project Plan Final Scenario Report To the cloud! Conditions of Satisfaction 11/15/2018

15 Schedule and Milestones (1)
Tu W Th F Week 1 Kickoff meeting Project preparation Start validation of customer Microsoft Azure environment. Create the initial project plan Create the Conditions of Satisfaction document Start validation of existing on-premises SQL Server instance. Complete validation and assessment of on-premises SQL Server instance. Submit initial project plan, Vision and Scope document, and Conditions of Satisfaction to customer for acceptance Week 2 Customer status meeting Start identifying databases to be in scope Continue database identification Start identifying HADR and backup options for selected databases Continue identifying HADR and backup options (if needed) Run tools to capture database info (if needed) Complete activities from previous day Create draft version scenario report for internal review Schedule and Milestones (1) 11/15/2018

16 Schedule and Milestones (2)
Tu W Th F Week 3 Customer status meeting or conference call Start Microsoft Azure configuration Complete Microsoft Azure configuration Review scenario report with customer Complete Microsoft Azure Configuration (if needed) Build SQL Server 2014 environment and smoke test functionality and connectivity. Configure SQL Servers (on-premises and in cloud) for HADR and backup scenarios. Week 4 Customer status meeting Continue with SQL Server 2014 environment in Microsoft Azure (if needed) System validation testing Assess the deployed environment with the customer Solution walkthrough Customer closeout meeting (typically on-site) Schedule and Milestones (2) 11/15/2018

17 Weekly status meetings on Mondays
The Microsoft Engagement Manager is the primary point of contact for <Customer> Weekly status meetings on Mondays Status Schedule Issues Project-management tracking documents Status reports Risks and issues tracking Document and deliverable repository Internal customer communication <Customer to define this> Communication Plan 11/15/2018

18 Roles and Resources Role or Title Name
Contact Information Responsibility Customer Microsoft 11/15/2018

19 Work Products Deliverable Description Environment Assessment Questionnaire Document Used to gather an initial set of workload and infrastructure data Vision and Scope Document Provides high-level direction and goals for the project Conditions of Satisfaction Document List of agreed conditions of satisfaction for this engagement Final Scenario Report The inventory report or worksheets from automated inventory collection There are no deliverables requiring formal acceptance. However, the work products listed above may be created as part of this engagement. 11/15/2018

20 Next Steps and Action Items
Verify customer readiness Schedule interviews Start environment assessment Answer customer questions Verify customer readiness: Ensure a Microsoft Azure subscription exists and that VPN connectivity is setup. Schedule interviews: Interview DBA’s 11/15/2018

21 11/15/2018 5:28 PM Questions and Answers

22 Contact Name Title Phone www.microsoft.com/microsoftservices
© 2014 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION

23 Appendix


Download ppt "Kickoff Presentation Date of Presentation Presenter Name"

Similar presentations


Ads by Google